If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24689 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.751080405,"lon":-80.93435357,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Salem Township | |
Operator Name: EQUINOR USA ONSHORE PROPERTIES | |
Well Pad ID: US-OH-001413 | |
Farm/Lease Name: PFALZGRAF S | |
License Status: Producing | |
License Date: 2016-11-16 | |
Spud Date: 2016-12-26 | |
Spud Drilling Contractor: ORION DRILLING | |
Final Drill Date: 2017-07-21 | |
Well Total Depth: 21502 ft | |
Configuration: Horizontal | |
Latitude: 39.751080405 | |
Longitude: -80.93435357 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-11-16 | Proposed Formations:POINT PLEASANT, Issued Date:11/16/2016, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:497.8, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-07-21 | WELL DRILLED PER LOGS RCVD. |
Correction to Well | 2017-10-20 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-02-15 | WELL DRILLED PER LOGS RCVD. |
Change of Owner | 2018-08-08 | Operator changed from 9065, STATOIL USA ONSHORE PROPERTIES INC to 10187, EQUINOR USA ONSHORE PROPERTIES INC. |
Record Last Modified | 2018-08-08 | WELL DRILLED PER LOGS RCVD. |
Construction Permit Expires | 2018-11-16 | WELL DRILLED PER LOGS RCVD. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-20 | 11564 | 11724 | 45 |
2018-02-20 | 21164 | 21324 | 45 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/22/2017 | 11/21/2017 | 10627 | 15,702,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 84.7115 | 130,803,000.0 |
Santrol SSP - 40/70 | Santrol | Proppant | Listed Below | Listed below | 0 | 0 | 0 | |
D-AIR 4000L | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
Citric acid | 77-92-9 | 60 | 0.00614141 | 9483 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00022027 | 341 | ||||
Polypropylene glycol | 25322-69-4 | 30 | 0.000947568 | 1464 | ||||
Ethanol | 64-17-5 | 1 | 0.000202781 | 314 | ||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl chlorides | 68424-85-1 | 5 | 0.00101391 | 1566 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002028 | 32 | ||||
Methanol | 67-56-1 | 60 | 0.00046893 | 725 | ||||
Octadecene | 27070-58-2 | 60 | 0.000935174 | 1444 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00530407 | 8190 | ||||
Acetic acid | 64-19-7 | 60 | 0.00532692 | 8226 | ||||
Olefins | Proprietary | 5 | 0.00008811 | 138 | ||||
Hexadecene | 26952-14-7 | 60 | 0.000935174 | 1444 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0120174 | 18557 | ||||
Water-soluble polymer | Proprietary | 3 | 0.392252 | 605676 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00022027 | 341 | ||||
Isooctadecanoic acid, monoester with glycerol | 66085-00-5 | 30 | 0.000467587 | 722 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00007342 | 114 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.00022027 | 341 | ||||
Crystalline Silica in the form of Quartz | 14808-60-7 | 97 | 12.6828 | 19,583,500.0 | ||||
Siloxanes and Silicones, di-Me, reaction products with silica | 67762-90-7 | 30 | 0.000947568 | 1464 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.14596 | 225369 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000530 | 9 | ||||
Alkenes | Proprietary | 100 | 0.00315856 | 4878 | ||||
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.0020029 | 3093 | ||||
Polyacrylate | Proprietary | 30 | 0.0120174 | 18557 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.0088782 | 13709 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00608343 | 9394 | ||||
Castor oil, ethoxylated | 61791-12-6 | 5 | 0.0020029 | 3093 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 1.1517 | 1,778,340.0 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.0020029 | 3093 | ||||
Sobitan, mono-9-octadececenoate, (Z) | 1338-43-8 | 5 | 0.0020029 | 3093 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.0020029 | 3093 | ||||
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
D-AIR 3000L | Halliburton | Defoamer | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Santrol SSP - 30/50 | Santrol | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.02004 | 1,575,050.0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1176-15 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-11-21 | H2O | 15 | 325938 Gal | 472080 | Halliburton | STAGE 49/49
STAGES 2-48 SEE IMAGES |
2017-10-22 | H2O | 15 | 456972 Gal | 451000 | Halliburton | STAGE 1/49
STAGES 2-48 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | EQUINOR USA ONSHORE PROPERTIES | 5036455 | 0 | 362 |
2019 | EQUINOR USA ONSHORE PROPERTIES | 624221 | 0 | 80 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | EQUINOR USA ONSHORE PROPERTIES | Brine | 97534 | 362 |
2019 | EQUINOR USA ONSHORE PROPERTIES | Brine | 9143 | 80 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0749585449 | 2016-12-28 | Casing String Witnessed | No Violations | I was on location to witness Express Energy cement the 30 inch diameter conductor casing into a 36 inch diameter bore hole. Express drilled a 100 foot 36 inch diameter bore hole and set 100 inches of 30 inch diameter conductor casing into the hole. Express ran 13 barrels of fresh water gel ahead of the cement. Express then ran 275 sacks of cement, 2% CaCL, and .50 pounds per sack of floseal with 57.79 barrels of fresh water at 15.6 pounds and a yield of 1.18. Express then circulated with 74.80 barrels of fresh water until we got cement to surface. Express circulated about 10 barrels of cement to surface and finished cementing the conductor into the bore hole. |
1296439385 | 2019-04-04 | Production Wells | No Violations | On this day, I am accompanied by ODNR Inspector Rick Brown. I found the pad gated with signage at the entrance. There are (3) producing wells, (3) gas processing units, (2) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 500 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 25 psi. Production records are current. |
1721578600 | 2017-03-13 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing cement job with Well Service Group rig # 1 on the hole. The rig has drilled a 26 surface borehole to a measured depth of 470 and ran 432 of 20 diameter 94 lb/ft J-55 buttress thread casing with a double valve sting in float shoe ran and proper centralizer placement demonstrated. Halliburton Cement service cemented the casing using 155 barrels of NeoCem Class A cement consisting of 705 sacks of cement. The cement was pumped through the drill string stung into the double valve float shoe.15 barrels of cement returns were witnessed to surface. The floats did not hold in the casing shoe. |
1871675671 | 2017-12-14 | Completion Testing | No Violations | Status check inspection on the well completion process found the well drilling -stimulation and completion process has been completed and crews are on site installing the production well head assembly. The location is also being cleaned up to be prepared to turned over to production. |
1983122949 | 2018-03-06 | Completion Testing | No Violations | Status check inspection found the well drilling and completion process now complete. There is a primary master valve installed on the well head. The well is set up to be produced out of the 5.5 production casing with a production stack assembled on the casing well head consisting of (2) manually controlled valves and (2) emergency shut don valves. Crews are on site installing the production equipment and flow lines. A production fluid facility is being assembled and will consist of a total of (2) steel tanks capable of holding 400 barrels total capacity each. The wells are plumed up to accommodate annular pressure monitoring. The preliminary restoration will need followed up on later in the year once vegetation can be better established. The well pad outward slopes appear to be stable and the well pad surface is of good repair and of stone construction. |
For data sources see[10]