X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24791

Well Details

Well ID: 34-111-24791
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Green Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001524
Farm/Lease Name: ROTH A
License Status: Well Drilled
License Date: 2017-11-30
Spud Date: 2018-09-05
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-09-30
Well Total Depth: 27381 ft
Configuration: Horizontal
Latitude: 39.703982630
Longitude: -81.03198666

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-10-11 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/11/2017, Expired Date:10/11/2019 12:00:00 PM, Drilling unit acres:364.16, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-11-30 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/30/2017, Expired Date:11/30/2019 12:00:00 PM, Drilling unit acres:405.079, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-09-30
Correction to Well 2018-12-21 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Record Last Modified 2018-12-26
Construction Permit Expires 2019-11-30

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1536681426 2018-09-11 Drill / Deepen / Reopen No Violations
1551271882 2019-02-27 Completion Testing No Violations Status check inspection found Stingray Pressure pumping Service on location and stimulating 3 of the 5 wells on the pad. The said well has had 55 out of 81 stages completed. Nine Energy wireline is providing the perforating services. The well head completion stack is a FMC. The well head A&B sections have annular pressure monitoring in place and flow lines attached o the B section that are tied into a separate choke manifold. The flow lines are equipped with a 1,500 psi pop off with (2) in line shut off valves between the well head and pop off. Only the well being stimulated has the B section valves open to the check manifold during stimulation of that well. All stimulation equipment is situated on polymer containment and the well pad is equipped with a perimeter earthen berm with the perimeter berm drain valves being in the closed position.

For data sources see[3]

References