If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-24439 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.918213347,"lon":-81.37899182,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Lake Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: HOOVER R& W | |
License Status: Producing | |
License Date: 1990-03-01 | |
Spud Date: 1990-07-27 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1990-08-02 | |
Well Total Depth: 4600 ft | |
Configuration: Vertical | |
Latitude: 40.918213347 | |
Longitude: -81.37899182 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1988-03-11 | 70 WALDRON DAVID A & ASS INC GeoDate 3/11/88 |
Oil and Gas | 1988-03-11 | Issued Date 3/11/88 Expired Date 3/11/89 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1990-03-01 | 169 SMAIL JAMES R GeoDate 3/1/90 |
Oil and Gas | 1990-03-01 | Issued Date 3/1/90 Expired Date 3/1/91 Acres 0040000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 04600 Proposed Drill Depth 04600 |
Original Spud | 1990-07-27 | RI 3-3-90 |
Completed | 1990-08-02 | RI 3-3-90 |
Reached Total Depth | 1990-08-02 | RI 3-3-90 |
Completion Report Received | 1990-10-26 | RI 3-3-90 |
Construction Permit Expires | 1991-03-01 | RI 3-3-90 |
Change of Owner | 2018-11-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-11-29 | RI 3-3-90 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4420 | 4539 | 0 |
2006-09-11 | 4438 | 4513 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 77500 Gal | 55000 | FRAC:WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | JAMES R SMAIL INC | 3590 | 0 | 365 |
1992 | JAMES R SMAIL INC | 2621 | 100 | 365 |
1993 | JAMES R SMAIL INC | 2271 | 0 | 365 |
1994 | JAMES R SMAIL INC | 2113 | 0 | 365 |
1995 | JAMES R SMAIL INC | 2158 | 0 | 365 |
1996 | JAMES R SMAIL INC | 1404 | 89 | 365 |
1997 | JAMES R SMAIL INC | 1241 | 0 | 365 |
1998 | JAMES R SMAIL INC | 1664 | 0 | 365 |
1999 | JAMES R SMAIL INC | 948 | 33 | 365 |
2000 | JAMES R SMAIL INC | 350 | 0 | 365 |
2001 | JAMES R SMAIL INC | 1555 | 0 | 365 |
2002 | JAMES R SMAIL INC | 1735 | 0 | 365 |
2003 | JAMES R SMAIL INC | 2202 | 0 | 365 |
2004 | JAMES R SMAIL INC | 2236 | 0 | 365 |
2005 | JAMES R SMAIL INC | 1607 | 0 | 365 |
2006 | JAMES R SMAIL INC | 1072 | 0 | 365 |
2007 | JAMES R SMAIL INC | 1152 | 72 | 365 |
2008 | JAMES R SMAIL INC | 1406 | 0 | 365 |
2009 | JAMES R SMAIL INC | 1802 | 0 | 365 |
2010 | JAMES R SMAIL INC | 1776 | 0 | 365 |
2011 | JAMES R SMAIL INC | 1342 | 0 | 365 |
2012 | JAMES R SMAIL INC | 749 | 0 | 366 |
2013 | JAMES R SMAIL INC | 2022 | 50 | 365 |
2014 | JAMES R SMAIL INC | 1939 | 0 | 365 |
2015 | JAMES R SMAIL INC | 1770 | 0 | 365 |
2016 | JAMES R SMAIL INC | 1357 | 35 | 365 |
2017 | JAMES R SMAIL INC | 1287 | 0 | 365 |
2018 | JAMES R SMAIL INC | 1434 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | JAMES R SMAIL INC | Brine | 614 | 365 |
1992 | JAMES R SMAIL INC | Brine | 217 | 365 |
1993 | JAMES R SMAIL INC | Brine | 230 | 365 |
1994 | JAMES R SMAIL INC | Brine | 157 | 365 |
1995 | JAMES R SMAIL INC | Brine | 74 | 365 |
1996 | JAMES R SMAIL INC | Brine | 128 | 365 |
1997 | JAMES R SMAIL INC | Brine | 0 | 365 |
1998 | JAMES R SMAIL INC | Brine | 151 | 365 |
1999 | JAMES R SMAIL INC | Brine | 86 | 365 |
2000 | JAMES R SMAIL INC | Brine | 365 | |
2001 | JAMES R SMAIL INC | Brine | 85 | 365 |
2002 | JAMES R SMAIL INC | Brine | 196 | 365 |
2003 | JAMES R SMAIL INC | Brine | 196 | 365 |
2004 | JAMES R SMAIL INC | Brine | 66 | 365 |
2005 | JAMES R SMAIL INC | Brine | 75 | 365 |
2006 | JAMES R SMAIL INC | Brine | 50 | 365 |
2007 | JAMES R SMAIL INC | Brine | 0 | 365 |
2008 | JAMES R SMAIL INC | Brine | 80 | 365 |
2009 | JAMES R SMAIL INC | Brine | 70 | 365 |
2010 | JAMES R SMAIL INC | Brine | 71 | 365 |
2011 | JAMES R SMAIL INC | Brine | 0 | 365 |
2012 | JAMES R SMAIL INC | Brine | 60 | 366 |
2013 | JAMES R SMAIL INC | Brine | 141 | 365 |
2014 | JAMES R SMAIL INC | Brine | 62 | 365 |
2015 | JAMES R SMAIL INC | Brine | 20 | 365 |
2016 | JAMES R SMAIL INC | Brine | 92 | 365 |
2017 | JAMES R SMAIL INC | Brine | 73 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0193139405 | 2005-12-07 | Production Wells | No Violations | N.O.V. has been RESOLVED. |
1156178459 | 2006-08-14 | Production Wells | Violations Noted | I received a request from Rick Simmers to inspect this tank battery for a possible brine leak. The plastic brine tank has a crack in it on the west side and is leaking brine. The 100-bbl stock tank is leaking brine at the 2 brine valve. Replace the brine tank, 2 line, and the 2 brine valve. Call J. R. Smail (330-264-7500). |
1827324483 | 2005-04-04 | Production Wells | Violations Noted | Stuffing box is leaking. Clean up the free oil and the stained soil and gravel from around the wellhead. GPS WH & TB (2-100 bbl oil, 1-40 bbl brine). |
1857263643 | 2005-05-02 | Production Wells | No Violations | N.O.V. is still UNRESOLVED. |
2143233356 | 2006-08-25 | Production Wells | No Violations | Cracked brine tank has been removed. N.O.V. has been RESOLVED. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1156178459 | US-OH-104105 | 2006-08-21 | Well operation causing pollution and contamination | |
1827324483 | US-OH-118241 | 2005-04-05 | Well operation causing pollution and contamination |
For data sources see[9]