If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25611 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.779355735,"lon":-81.52838263,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Massillon City | |
Operator Name: LAKE REGION OIL INC | |
Well Pad ID: | |
Farm/Lease Name: NFMWE | |
License Status: Producing | |
License Date: 2011-06-07 | |
Spud Date: 2008-01-26 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2008-02-08 | |
Well Total Depth: 6761 ft | |
Configuration: Vertical | |
Latitude: 40.779355735 | |
Longitude: -81.52838263 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-01-04 | Proposed Formations:CLINTON/ROSE RUN, Issued Date:1/4/2008, Expired Date:1/3/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-02-08 | |
Completion Report Received | 2008-09-26 | |
Plugged Back | 2011-05-16 | |
APP | 2011-06-07 | Proposed Formations:CLINTON, Issued Date:6/7/2011, Expired Date:6/6/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Construction Permit Expires | 2013-06-06 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-11-03 | 6669 | 6678 | 37 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 750 Gal | 0 | NO TREATMENT OR RESERVOIR PRESSURES WERE REPORTED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | LAKE REGION OIL INC | 17003 | 1314 | 199 |
2009 | LAKE REGION OIL INC | 34080 | 1005 | 365 |
2010 | LAKE REGION OIL INC | 13153 | 458 | 365 |
2011 | LAKE REGION OIL INC | 8257 | 93 | 0 |
2012 | LAKE REGION OIL INC | 16131 | 45 | 366 |
2013 | LAKE REGION OIL INC | 13929 | 31 | 365 |
2014 | LAKE REGION OIL INC | 8341 | 0 | 365 |
2015 | LAKE REGION OIL INC | 4637 | 0 | 365 |
2016 | LAKE REGION OIL INC | 2335 | 37 | 365 |
2017 | LAKE REGION OIL INC | 2573 | 0 | 365 |
2018 | LAKE REGION OIL INC | 1839 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | LAKE REGION OIL INC | Brine | 0 | 199 |
2009 | LAKE REGION OIL INC | Brine | 830 | 365 |
2010 | LAKE REGION OIL INC | Brine | 775 | 365 |
2011 | LAKE REGION OIL INC | Brine | 1608 | |
2012 | LAKE REGION OIL INC | Brine | 310 | 366 |
2013 | LAKE REGION OIL INC | Brine | 190 | 365 |
2014 | LAKE REGION OIL INC | Brine | 185 | 365 |
2015 | LAKE REGION OIL INC | Brine | 315 | 365 |
2016 | LAKE REGION OIL INC | Brine | 95 | 365 |
2017 | LAKE REGION OIL INC | Brine | 105 | 365 |
2018 | LAKE REGION OIL INC | Brine | 140 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0744975755 | 2008-07-02 | Preliminary Restoration | No Violations | The well is in production and the location is reclaimed. The Preliminary Restoration is PASSED. Note the revised tank battery location. |
0749985728 | 2008-01-25 | Drill / Deepen / Reopen | No Violations | The fresh water leaked out thru the working pit liner. The rig crew will line the existing working pit liner with straw and place a second liner in the pit. The rig may spud on Saturday, 1-26-08. |
0809853669 | 2008-01-24 | Drill / Deepen / Reopen | No Violations | Maric Drilling is moving on the location. |
1027276364 | 2008-02-07 | Drill / Deepen / Reopen | No Violations | Drilling at 6757. Will T.D. at 6760, log hole, run casing, and cement. Pits and liners are intact. |
1201535608 | 2008-01-28 | Drill / Deepen / Reopen | No Violations | Cemented surface casing. Waiting on cement to set. Pits and liners are intact. Picked up cementing job logs. |
1821673808 | 2008-04-07 | Preliminary Restoration | No Violations | The drilling pits are closed and the location is rough graded. The rabbit well is producing into a 300 bbl tank. The stock tanks are set on the location, but are not plumbed. The tank battery location is different from what I initially approved. I will request a corrected aerial photo from Lake Region. |
For data sources see[9]