If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-29695 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.493476873,"lon":-81.24487392,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: Independence Township | |
Operator Name: ELK OIL CO LLC | |
Well Pad ID: | |
Farm/Lease Name: EDDY HEIRS | |
License Status: Producing | |
License Date: 2010-06-18 | |
Spud Date: 2011-05-14 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 2015-09-12 | |
Well Total Depth: 1237 ft | |
Configuration: Vertical | |
Latitude: 39.493476873 | |
Longitude: -81.24487392 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-06-18 | Proposed Formations:PEEKER/MAXTON/SQUAW, Issued Date:6/18/2010, Expired Date:6/18/2011 6:00:00 AM, Drilling unit acres:153, Proposed Well Type:OG, Proposed Well Class:ENPW |
Construction Permit Expires | 2011-06-18 | |
Completion Report Received | 2015-04-27 | |
Reached Total Depth | 2015-09-12 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | ELK OIL CO LLC | 0 | 0 | 365 |
2011 | ELK OIL CO LLC | 0 | 0 | 0 |
2012 | ELK OIL CO LLC | 0 | 0 | 0 |
2013 | ELK OIL CO LLC | 0 | 0 | 0 |
2014 | ELK OIL CO LLC | 0 | 0 | 0 |
2015 | ELK OIL CO LLC | 100 | 10 | 365 |
2016 | ELK OIL CO LLC | 28 | 14 | 365 |
2017 | ELK OIL CO LLC | 30 | 15 | 365 |
2018 | ELK OIL CO LLC | 30 | 15 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | ELK OIL CO LLC | Brine | 0 | 365 |
2011 | ELK OIL CO LLC | Brine | 0 | 0 |
2012 | ELK OIL CO LLC | Brine | 0 | 0 |
2013 | ELK OIL CO LLC | Brine | 0 | 0 |
2014 | ELK OIL CO LLC | Brine | 0 | 0 |
2015 | ELK OIL CO LLC | Brine | 0 | 365 |
2016 | ELK OIL CO LLC | Brine | 0 | 365 |
2017 | ELK OIL CO LLC | Brine | 0 | 365 |
2018 | ELK OIL CO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0680720453 | 2014-12-04 | Drill / Deepen / Reopen | No Violations | On location to witness the open hole shooting of this well. JT Wireline Services was on location and rigging up a charge of 360 lbs of 80% nitro-glycerine gelled shot. The charge was lowered into the hole to 1700 and the hole was loaded with fresh water. The charge was detonated, however no fluids were forced from the well, indicating that it may have bridged from the force of the explosion in the open hole area above the fluid column. Expansion gases escaped from the well slowly. Mr. Roger Eddy of Elk Oil Co. will use his cable tool rig to clean the well out over the coming weeks. |
0852384876 | 2012-08-23 | Drill / Deepen / Reopen | No Violations | The cable tool rig is back drilling and I found crew at 925 this day. Drill pit was satisfactory and permit out on rig. I stayed and talked to operator about the new rules in effect now and how they would affect and be applied to their operations. |
0896115829 | 2011-04-13 | Administrative Inspection | No Violations | Met with Roger Eddy to discuss new requirements for cable tool hole - discussed methods for completion. |
1330205664 | 2011-07-27 | Drill / Deepen / Reopen | No Violations | Inspection this day found cable tool rig was only to 60, still drilling surface hole. Very slow going. |
1342646474 | 2012-07-18 | Drill / Deepen / Reopen | No Violations | My inspection this day due to call that they were back drilling well with cable tool rig. Have just started up after taking off the winter. Rig at 585 with plans to drill 24 hr/day until thru the cave and red rock. Will run 7 casing at that point which may be left in or removed when total depth reached, planning for 1200. Drilling pit is sufficient. |
1409053942 | 2014-08-25 | Preliminary Restoration | No Violations | Upon inspection, it was observed that the preliminary restoration for this well has not been performed. The cable tool rig used for drilling the is still standing over it. The drilling pit for the well is still open and has been overflowing during rain events. The well consists of a 7 surface casing and a swedge to a 2 gate valve. I spoke with Mr. Roger Eddy of Elk Oil Co LLC in person and inquired about the situation. He stated that he is waiting for Leonard Hamilton to shoot the well, but Mr. Hamilton never has time to do so. I told him there are other companies who shoot wells in the area who would be more available. Mr. Eddy agreed to contact another company this fall to complete the well and to perform the preliminary restoration. Mr. Eddy also agreed to address the drilling pit leakage immediately. The rig and the pit will be needed to clean out the well after it is shot. I will continue to monitor this situation. Pictures were taken of the location. |
1496960096 | 2011-06-24 | Drill / Deepen / Reopen | No Violations | Inspection this day found cable tool rig on location, had started about a week ago and now 38 deep in sandstone - hard. Pit is lined and looks capable of handling the fluids, permit on location. |
For data sources see[7]