X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22984

Well Details

Well ID: 34-153-22984
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: COVENTRY HIGH SCHOOL UNIT
License Status: Producing
License Date: 2006-08-07
Spud Date: 2006-09-26
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2006-10-01
Well Total Depth: 4105 ft
Configuration: Vertical
Latitude: 41.016869625
Longitude: -81.55139884

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-08-07 Proposed Formations:CLINTON, Issued Date:8/7/2006, Expired Date:8/7/2007 6:00:00 AM, Drilling unit acres:24.547, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2006-10-01 RBDMS Rec
Reached Total Depth 2006-10-01 RBDMS Rec
Completion Report Received 2006-11-06 RBDMS Rec
Construction Permit Expires 2007-08-07 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-01-10 3859 3889 61

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 7 2357 Bbl 70000 750 GALLONS HCL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 EVERFLOW EASTERN PTNS L P 0 0 0
2007 EVERFLOW EASTERN PTNS L P 15115 283 365
2008 EVERFLOW EASTERN PTNS L P 10852 178 365
2009 EVERFLOW EASTERN PTNS L P 5490 85 365
2010 EVERFLOW EASTERN PTNS L P 4819 124 365
2011 EVERFLOW EASTERN PTNS L P 3916 194 365
2012 EVERFLOW EASTERN PTNS L P 3704 0 336
2013 EVERFLOW EASTERN PTNS L P 3686 65 365
2014 EVERFLOW EASTERN PTNS L P 3198 65 365
2015 EVERFLOW EASTERN PTNS L P 4193 53 365
2016 EVERFLOW EASTERN PTNS L P 1834 0 365
2017 EVERFLOW EASTERN PTNS L P 2025 76 365
2018 EVERFLOW EASTERN PTNS L P 2223 29 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 EVERFLOW EASTERN PTNS L P Brine 95 0
2007 EVERFLOW EASTERN PTNS L P Brine 485 365
2008 EVERFLOW EASTERN PTNS L P Brine 227 365
2009 EVERFLOW EASTERN PTNS L P Brine 119 365
2010 EVERFLOW EASTERN PTNS L P Brine 80 365
2011 EVERFLOW EASTERN PTNS L P Brine 70 365
2012 EVERFLOW EASTERN PTNS L P Brine 102 336
2013 EVERFLOW EASTERN PTNS L P Brine 95 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 365
2015 EVERFLOW EASTERN PTNS L P Brine 65 365
2016 EVERFLOW EASTERN PTNS L P Brine 75 365
2017 EVERFLOW EASTERN PTNS L P Brine 70 365
2018 EVERFLOW EASTERN PTNS L P Brine 42 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0845002543 2006-10-02 Drill / Deepen / Reopen No Violations Drilling has been completed and the rig is running production casing. The pits are lined and in good condition.
1161557070 2006-10-17 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and closed. No violations at this time.
1264489997 2006-09-29 Drill / Deepen / Reopen No Violations Completed the BOP test before drilling out from under surface casing.
1510151906 2006-09-25 Drill / Deepen / Reopen No Violations Poulson Drilling is moving on the location and should spud in the next day. The pits are being dug and will be lined.
1577006837 2018-09-04 UrbanProduction Wells No Violations Access to the wellhead was gained through Coventry High School bus barns parking lot. The wellhead was surrounded with a locked, screened chain link fence with three (3) strands of barbed wire. I. D. signage was posted. The well was configured to operate as a plunger lift well. A riser from the 8.625 surface casing supplied pressure to power the motor valve. A domestic natural gas connection was attached to the 4.5 production casing. No leaks or contamination were identified during this inspection at the wellhead. The tank battery was located in the school bus parking lot. The tank battery was surrounded with a screened, locked chain link fence and earthen dike. I. D. signage was posted and legible. The tank battery was comprised of one (1) 140 barrel stock tank, one (1) 35 barrel poly brine tank , one (1) 2408 horizontal separator with orifice gas meter. The gas meter reflected the current production period. A Dominion / EOG master meter was also in the tank battery. The load lines were locked and plugged. The stock tank had a carbon filter, lightning arrestor and pressure hatch. No leaks were found at the tank battery during this inspection.
1643289503 2007-01-08 Production Wells No Violations The well has been completed and is in production. Preliminary restoration will be approved as soon as the site has been seeded and is growing. Preliminary restoration is not due until June.
1681509902 2006-09-27 Drill / Deepen / Reopen No Violations Drilling of the surface hole is continuing. Should be ready to run and cement casing later today. The pits are lined and in good condition. The location is fenced off and the required identification is posted. No violations at this time.
1689048540 2007-05-23 Preliminary Restoration No Violations Preliminary restoration is approved.

For data sources see[9]

References