34-153-23143

Well Details

Well ID: 34-153-23143
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Akron City
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: BRIARWOOD PROPERTIES
License Status: Producing
License Date: 2011-09-20
Spud Date: 2011-11-17
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2011-11-22
Well Total Depth: 4261 ft
Configuration: Vertical
Latitude: 41.026728290
Longitude: -81.48119439

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-09-20 Proposed Formations:CLINTON, Issued Date:9/20/2011, Expired Date:9/19/2013 12:00:00 PM, Drilling unit acres:43.46, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-11-22
Completion Report Received 2011-11-28
Construction Permit Expires 2012-09-19
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-01-12 4004 4064 47

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-12-08 H2O 15 100166 Gal 60000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 EVERFLOW EASTERN PTNS L P 22687 696 341
2013 EVERFLOW EASTERN PTNS L P 13548 450 337
2014 EVERFLOW EASTERN PTNS L P 12270 369 365
2015 EVERFLOW EASTERN PTNS L P 6713 120 365
2016 EVERFLOW EASTERN PTNS L P 2585 162 365
2017 EVERFLOW EASTERN PTNS L P 3173 139 365
2018 EVERFLOW EASTERN PTNS L P 2537 139 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 EVERFLOW EASTERN PTNS L P Brine 4343 341
2013 EVERFLOW EASTERN PTNS L P Brine 2497 337
2014 EVERFLOW EASTERN PTNS L P Brine 2038 365
2015 EVERFLOW EASTERN PTNS L P Brine 1362 365
2016 EVERFLOW EASTERN PTNS L P Brine 1510 365
2017 EVERFLOW EASTERN PTNS L P Brine 1170 365
2018 EVERFLOW EASTERN PTNS L P Brine 945 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0613994909 2011-11-28 Urban Drill / Deepen / Reopen No Violations Poulson Drilling has moved off location. The pits have been pumped down and are fenced, lined and in good condition.
0739779534 2012-01-18 Urban Drill / Deepen / Reopen No Violations The flowline is being installed from the wellhead to the existing tank battery for the AFA #4 well. The safety bollards are in place and pits have been solidified and covered. The affected area will be repaved as soon as the weather permits.
0932822456 2011-11-17 Urban Drill / Deepen / Reopen No Violations Poulson spudded this well early this morning and set but did not cement 62 of 11.75 conductor casing. They are currently drilling an 11 surface hole and should be ready to cement casing late tonight. The drilling pits are fenced, lined and in good condition.
1092869450 2011-12-21 Urban Drill / Deepen / Reopen No Violations The pits have been solidified and backfilled. Everflow will cover this area with asphalt after it has stabilized. The well has been fraced and 1.5 tubing installed.
1129580220 2011-11-21 Urban Drill / Deepen / Reopen No Violations Poulson is drilling on fluid at 3900 and should reach total depth tomorrow morning. They switched from air to fluid drilling at 3550 as required by permit. The pits are fenced, lined and in good condition.
1206000141 2011-11-16 Urban Drill / Deepen / Reopen No Violations Poulson Drilling is starting to move on location. They should be ready to spud the well later tonight or tomorrow.
1268797619 2011-12-01 Urban Drill / Deepen / Reopen No Violations The drilling pits have been solidified and are being covered over. The well is scheduled to be perforated and fraced next week.
1321308308 2011-11-04 Urban Drill / Deepen / Reopen No Violations The location is ready for the drilling rig. The asphalt parking lot will not be cut or disturbed until the rig arrives.
1474388939 2012-07-10 Preliminary Restoration No Violations Preliminary Restoration is approved.