If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23580 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.257253884,"lon":-80.82559084,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Warren Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: SPAIN F& V ETAL | |
License Status: Producing | |
License Date: 1995-01-11 | |
Spud Date: 1995-05-30 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1995-06-26 | |
Well Total Depth: 4852 ft | |
Configuration: Directional | |
Latitude: 41.257253884 | |
Longitude: -80.82559084 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1995-01-11 | Issued Date 1/11/95 Expired Date 1/11/96 Acres 0057665 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04852 Proposed Drill Depth 04852 |
Original Spud | 1995-05-30 | |
Completed | 1995-06-26 | |
Reached Total Depth | 1995-06-26 | |
CO | 1995-08-16 | 3614 COPPERWELD ENERGY INC GeoDate 1/11/95 |
CO | 1995-09-01 | 2816 P & S ENERGY INC GeoDate 1/11/95 |
Completion Report Received | 1995-09-28 | |
Construction Permit Expires | 1996-01-11 | |
Change of Owner | 2019-02-26 | Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-02-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4686 | 4792 | 0 |
2006-09-11 | 4699 | 4792 | 86 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 165000 Mscf | 0 | |||
0 | 108065 Gal | 65000 | FRAC W/108,865 GAL WATER,65M# SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | P & S ENERGY INC | 13324 | 248 | 138 |
1996 | P & S ENERGY INC | 26652 | 333 | 365 |
1997 | P & S ENERGY INC | 16462 | 150 | 365 |
1998 | P & S ENERGY INC | 13518 | 80 | 365 |
1999 | P & S ENERGY INC | 11262 | 80 | 365 |
2000 | P & S ENERGY INC | 9686 | 56 | 365 |
2001 | P & S ENERGY INC | 8221 | 0 | 365 |
2002 | P & S ENERGY INC | 7121 | 77 | 365 |
2003 | P & S ENERGY INC | 7532 | 0 | 365 |
2004 | P & S ENERGY INC | 6736 | 43 | 365 |
2005 | P & S ENERGY INC | 5813 | 0 | 365 |
2006 | P & S ENERGY INC | 6000 | 0 | 365 |
2007 | P & S ENERGY INC | 6568 | 0 | 365 |
2008 | P & S ENERGY INC | 5864 | 0 | 365 |
2009 | P & S ENERGY INC | 5173 | 52 | 365 |
2010 | P & S ENERGY INC | 6380 | 0 | 365 |
2011 | P & S ENERGY INC | 5315 | 0 | 365 |
2012 | P & S ENERGY INC | 4898 | 0 | 366 |
2013 | P & S ENERGY INC | 4365 | 0 | 365 |
2014 | P & S ENERGY INC | 4492 | 0 | 365 |
2015 | P & S ENERGY INC | 4226 | 0 | 365 |
2016 | P & S ENERGY INC | 4296 | 48 | 365 |
2017 | P & S ENERGY INC | 4605 | 0 | 365 |
2018 | P & S ENERGY INC | 4203 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | P & S ENERGY INC | Brine | 57 | 138 |
1996 | P & S ENERGY INC | Brine | 71 | 365 |
1997 | P & S ENERGY INC | Brine | 35 | 365 |
1998 | P & S ENERGY INC | Brine | 0 | 365 |
1999 | P & S ENERGY INC | Brine | 41 | 365 |
2000 | P & S ENERGY INC | Brine | 0 | 365 |
2001 | P & S ENERGY INC | Brine | 0 | 365 |
2002 | P & S ENERGY INC | Brine | 0 | 365 |
2003 | P & S ENERGY INC | Brine | 0 | 365 |
2004 | P & S ENERGY INC | Brine | 40 | 365 |
2005 | P & S ENERGY INC | Brine | 0 | 365 |
2006 | P & S ENERGY INC | Brine | 0 | 365 |
2007 | P & S ENERGY INC | Brine | 0 | 365 |
2008 | P & S ENERGY INC | Brine | 0 | 365 |
2009 | P & S ENERGY INC | Brine | 30 | 365 |
2010 | P & S ENERGY INC | Brine | 0 | 365 |
2011 | P & S ENERGY INC | Brine | 0 | 365 |
2012 | P & S ENERGY INC | Brine | 0 | 366 |
2013 | P & S ENERGY INC | Brine | 11 | 365 |
2014 | P & S ENERGY INC | Brine | 30 | 365 |
2015 | P & S ENERGY INC | Brine | 0 | 365 |
2016 | P & S ENERGY INC | Brine | 0 | 365 |
2017 | P & S ENERGY INC | Brine | 0 | 365 |
2018 | P & S ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0675718434 | 2014-09-23 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production equipped with a plunger lift unit. The tank battery consisted of two, 210 barrel and a 100 production tanks, a 50 barrel brine tank, and three separators. A dike surrounded the production equipment. Identification signs were posted at the well and tank battery. Bull plugs were installed on the load lines. A locked, chain link fence surrounded the production equipment. The lease road was in stable condition. The well was placed into production prior to House Bill 278. |
0995548727 | 2004-02-25 | Preliminary Restoration | No Violations | Restoration approved . |
1482877608 | 2017-01-23 | UrbanProduction Wells | No Violations
-3487, and 2-3324. The access road is shared with permit 2-3550. The equipment on site consists of:
|
For data sources see[9]