34-155-24056

Well Details

Well ID: 34-155-24056
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Vienna Township
Operator Name: CNX GAS COMPANY LLC
Well Pad ID: US-OH-000359
Farm/Lease Name: WOLLMAN
License Status: Not Drilled
License Date: 2012-04-16
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 41.232457414
Longitude: -80.62584065

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-04-16 Proposed Formations:TRENTON, Issued Date:4/16/2012, Expired Date:4/16/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Construction Permit Expires 2014-04-16
Record Last Modified 2018-11-01

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0743881214 2012-07-12 Not Drilled No Violations On 7/12/12, I conducted a site visit on the new CNX shale well site. The construction of the well pad was still in progress.
0836619485 2012-10-09 Not Drilled No Violations I conducted a site visit and found CNX was in the process of reclamation of the well pad. I will conduct a follow-up inspection by 10/19/2012.
1342529973 2012-07-17 Not Drilled No Violations On 7/17/12, I checked the progress on the construction of the CNX shale well site. The shale pad looks complete, there was no construction activity.
1654066547 2013-07-29 Not Drilled No Violations My inspection found all of the stone from the well pad removed, graded, and seeded. All of the stone on the lease road was removed. The identification sign at the lease road entrance has been removed. The two impoundment pond were filled in, graded, and seeded.
1686137620 2013-06-20 Not Drilled No Violations My inspection found CNX reclaiming the site. The two in-ground impoundments had been filled in. Construction equipment were grading the site and removing stone from the lease road. I will re-inspect once the reclamation is complete.