If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-045-20463 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.659960055,"lon":-82.37781495,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Fairfield | |
Municipality: Rush Creek Township | |
Operator Name: BARCLAY PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: CUMMANS C E | |
License Status: Final Restoration | |
License Date: 2014-09-05 | |
Spud Date: 1967-06-06 | |
Spud Drilling Contractor: | |
Final Drill Date: 1967-07-13 | |
Well Total Depth: 2715 ft | |
Configuration: Vertical | |
Latitude: <Latitude> | |
Longitude: -82.37781495 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1967-06-06 | |
Completed | 1967-07-13 | |
Reached Total Depth | 1967-07-13 | |
CO | 1981-06-16 | 75 BARCLAY PETROLEUM INC GeoDate 6/16/81 |
APP | 2014-09-05 | Proposed Formations:CLINTON, Issued Date:9/5/2014, Expired Date:9/4/2016 12:00:00 PM, Drilling unit acres:70, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2015-01-26 | |
Construction Permit Expires | 2016-09-04 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 35000 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0068902491 | 2015-11-19 | Final Restoration | No Violations | Final Restoration inspection. Vegetation has been established. The site meets minimum requirements for final restoration. |
0130916823 | 2015-02-09 | Plug / Plug Back | No Violations | MH Well service on site, they have ripped the tubing at 1840. They recovered 1840 of tubing. They will attempt to rip the 5.5 casing on 02/10/2015. |
0199342200 | 2015-02-02 | Plug / Plug Back | No Violations | MH Well service on site removing paraffin from the tubing. The removal of the paraffin will allow the next plug be set. |
0345359563 | 2015-02-20 | Plug / Plug Back | No Violations | MH Well Service on site. Clay has been washed in to surface. The well will remain open for approx. 1 week to allow for clay settlement. |
0477623101 | 2014-03-10 | Administrative Inspection | No Violations | Complaint database inspection. I spoke with Chip Pristsel, landowner. Chip agreed to close out the complaint. |
1308826821 | 2013-04-23 | Production Wells | No Violations | Production well inspection, this well consists of a pumping unit and 1-100 barrel tank. |
1422302625 | 2015-01-26 | Plug / Plug Back | No Violations | Huffman and Bowers on site, circulated on the well thru the mud anchor on the bottom of the tubing. The tubing is hung in the hole. 40 sacks of cement were pumped for the bottom plug. |
1423070012 | 2015-02-04 | Plug / Plug Back | No Violations | MH Well service on site removing paraffin from tubing. The tubing is hung in the 4.5 casing. The paraffin needs to be removed prior to stetting the next plug. |
1426176357 | 2015-03-12 | Plug / Plug Back | No Violations | The well has been topped of with clay. The casing will be cut off and capped at a later date. |
For data sources see[8]