X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-21088

Well Details

Well ID: 34-157-21088
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Clay Township
Operator Name: ECHO DRILLING INC
Well Pad ID:
Farm/Lease Name: ZIMMERMAN JOHN
License Status: Producing
License Date: 1968-06-13
Spud Date: 1968-07-15
Spud Drilling Contractor:
Final Drill Date: 1968-08-23
Well Total Depth: 1263 ft
Configuration: Vertical
Latitude: 40.321633640
Longitude: -81.45948156

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1968-07-15
Completed 1968-08-23
Reached Total Depth 1968-08-23
CO 1993-08-12 3214 ECHO DRILLING INC
Record Last Modified 2013-10-03

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 CLAY OIL & GAS CO 0 176 365
1987 CLAY OIL & GAS CO 0 170 365
1988 CLAY OIL & GAS CO 0 169 365
1990 CLAY OIL & GAS CO 0 146 365
1991 EUREKA NATURAL G&PET CORP 0 158 365
1992 ECHO DRILLING INC 0 159 365
1993 ECHO DRILLING INC 0 139 365
1994 ECHO DRILLING INC 0 136 365
1995 ECHO DRILLING INC 0 137 365
1996 ECHO DRILLING INC 0 125 365
1997 ECHO DRILLING INC 0 121 365
1998 ECHO DRILLING INC 0 123 365
1999 ECHO DRILLING INC 0 115 365
2000 ECHO DRILLING INC 0 109 354
2001 ECHO DRILLING INC 0 97 363
2002 ECHO DRILLING INC 0 96 365
2003 ECHO DRILLING INC 0 95 365
2004 ECHO DRILLING INC 0 79 365
2005 ECHO DRILLING INC 0 85 365
2006 ECHO DRILLING INC 0 70 365
2007 ECHO DRILLING INC 0 75 365
2008 ECHO DRILLING INC 0 69 365
2009 ECHO DRILLING INC 0 61 365
2010 ECHO DRILLING INC 0 60 357
2011 ECHO DRILLING INC 0 60 357
2012 ECHO DRILLING INC 0 54 366
2013 ECHO DRILLING INC 0 46 353
2014 ECHO DRILLING INC 0 34 312
2015 ECHO DRILLING INC 0 44 319
2016 ECHO DRILLING INC 0 39 353
2017 ECHO DRILLING INC 0 36 347
2018 ECHO DRILLING INC 0 33 350

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 CLAY OIL & GAS CO Brine 506 365
1987 CLAY OIL & GAS CO Brine 444 365
1988 CLAY OIL & GAS CO Brine 416 365
1990 CLAY OIL & GAS CO Brine 406 365
1991 EUREKA NATURAL G&PET CORP Brine 408 365
1992 ECHO DRILLING INC Brine 420 365
1993 ECHO DRILLING INC Brine 408 365
1994 ECHO DRILLING INC Brine 364 365
1995 ECHO DRILLING INC Brine 364 365
1996 ECHO DRILLING INC Brine 376 365
1997 ECHO DRILLING INC Brine 376 365
1998 ECHO DRILLING INC Brine 408 365
1999 ECHO DRILLING INC Brine 386 365
2000 ECHO DRILLING INC Brine 386 354
2001 ECHO DRILLING INC Brine 391 363
2002 ECHO DRILLING INC Brine 365 365
2003 ECHO DRILLING INC Brine 357 365
2004 ECHO DRILLING INC Brine 330 365
2005 ECHO DRILLING INC Brine 356 365
2006 ECHO DRILLING INC Brine 362 365
2007 ECHO DRILLING INC Brine 348 365
2008 ECHO DRILLING INC Brine 361 365
2009 ECHO DRILLING INC Brine 357 365
2010 ECHO DRILLING INC Brine 714 357
2011 ECHO DRILLING INC Brine 714 357
2012 ECHO DRILLING INC Brine 732 366
2013 ECHO DRILLING INC Brine 707 353
2014 ECHO DRILLING INC Brine 624 312
2015 ECHO DRILLING INC Brine 638 319
2016 ECHO DRILLING INC Brine 706 353
2017 ECHO DRILLING INC Brine 694 347
2018 ECHO DRILLING INC Brine 700 350

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0928910928 2017-01-17 Production Wells No Violations On the day of my inspection I found well equipped with 5 1/2 X 2 3/8 inch wellhead with tubing and rods, being operated with a pumping unit with an electric motor. The valves are in the open position. The tank battery is shared with the wells on the Zimmerman lease. The production reporting is up to date, and there are no violations at this time.
1504203308 2017-08-31 Production Wells No Violations At the request of Junior with Echo Drilling an inspection was completed. Junior voiced concerns over the new electric lines that are being installed. The proposed pole location is 29 feet from the well. I informed Junior that there is nothing in our regulations that prohibits the encroachment There are several safety concerns that will come about if a settlement is not reach between AEP and Echo Drilling .

For data sources see[7]

References