If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-075-21870 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.458915018,"lon":-82.17533156,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Richland Township | |
Operator Name: WHEELER MICHAEL D | |
Well Pad ID: | |
Farm/Lease Name: A CARTWRIGHT | |
License Status: Producing | |
License Date: 2012-01-18 | |
Spud Date: 1975-12-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 1976-01-29 | |
Well Total Depth: 3063 ft | |
Configuration: Vertical | |
Latitude: 40.458915018 | |
Longitude: -82.17533156 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1975-12-01 | 1453 GREEN ENERGY INC GeoDate 12/1/75 |
Original Spud | 1975-12-05 | |
Completed | 1976-01-29 | |
Reached Total Depth | 1976-01-29 | |
Change of Owner | 2003-12-26 | Operator changed from 1084, KILLBUCK OILFIELD SERVICE to 1811, BYERS DONALD D |
Change of Owner | 2007-02-01 | Operator changed from 1811, BYERS DONALD OIL & GAS to 5476, WHEELER MICHAEL D |
APP | 2012-01-18 | Proposed Formations:CLINTON, Issued Date:1/18/2012, Expired Date:1/17/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Record Last Modified | 2013-10-03 | |
Construction Permit Expires | 2014-01-17 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 96410 Gal | 14000 |
For data sources see[3]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | SIMPSON B T JR | Brine | 0 | 0 |
1986 | SIMPSON B T JR | Brine | 0 | 100 |
1987 | MELANIE OIL DRIL USA INC | Brine | 85 | 245 |
1988 | MELANIE OIL DRIL USA INC | Brine | 32 | 365 |
1989 | MELANIE OIL DRIL USA INC | Brine | 82 | 365 |
1990 | GREEN ENERGY INC | Brine | 9 | 153 |
1991 | GREEN ENERGY INC | Brine | 100 | 365 |
1992 | GREEN ENERGY INC | Brine | 69 | 365 |
1993 | GREEN ENERGY INC | Brine | 81 | 365 |
1994 | GREEN ENERGY INC | Brine | 42 | 365 |
1995 | GREEN ENERGY INC | Brine | 41 | 365 |
1996 | GREEN ENERGY INC | Brine | 26 | 365 |
1997 | GREEN ENERGY INC | Brine | 13 | 90 |
1998 | KILLBUCK OILFIELD SERVICE | Brine | 0 | 365 |
1999 | KILLBUCK OILFIELD SERVICE | Brine | 0 | 365 |
2000 | KILLBUCK OILFIELD SERVICE | Brine | 0 | 365 |
2001 | KILLBUCK OILFIELD SERVICE | Brine | 0 | 365 |
2002 | KILLBUCK OILFIELD SERVICE | Brine | 0 | 365 |
2003 | KILLBUCK OILFIELD SERVICE | Brine | 2 | 275 |
2004 | DONALD BYERS OIL & GAS LLC | Brine | 25 | 365 |
2005 | DONALD BYERS OIL & GAS LLC | Brine | 34 | 365 |
2006 | DONALD BYERS OIL & GAS LLC | Brine | 20 | 365 |
2007 | DONALD BYERS OIL & GAS LLC | Brine | 14 | 30 |
2008 | WHEELER MICHAEL D | Brine | 0 | 365 |
2009 | WHEELER MICHAEL D | Brine | 0 | 365 |
2010 | WHEELER MICHAEL D | Brine | 0 | 365 |
2011 | WHEELER MICHAEL D | Brine | 10 | 365 |
2012 | WHEELER MICHAEL D | Brine | 50 | 366 |
2014 | WHEELER MICHAEL D | Brine | 0 | 365 |
2015 | WHEELER MICHAEL D | Brine | 0 | 365 |
2016 | WHEELER MICHAEL D | Brine | 40 | 365 |
2017 | WHEELER MICHAEL D | Brine | 0 | 365 |
2018 | WHEELER MICHAEL D | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0198915092 | 2012-06-25 | Plug / Plug Back | No Violations | They have pulled the rods and are pulling the tubing. The pump was full of mill shellac. The tubing indicated a high fluid level. The operator has decided to rerun both the tubing and rods and see if he can make a well out of it. |
0285496279 | 2012-04-09 | Production Wells | No Violations | This well is producing and is equipped with a pumping unit. There were no problems noted. |
0878230102 | 2018-10-24 | Production Wells | No Violations | On the day of my inspection I found an 8 5/8-inch diameter casing, 4 1/2-inch diameter casing, and 2 3/8-inch diameter tubing and rods, operated by a pumping unit with a gas motor. The production equipment is made up of one 100 bbl. steel tank, one 50 bbl. steel tank, a vertical separator, and a small gas compressor. The tanks are properly identified, and the production reporting is up to date. |
0948101531 | 2017-03-23 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
2138144711 | 2014-05-28 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
For data sources see[8]