If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-22505 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.468358726,"lon":-81.35870744,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Goshen Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: RAY RUTH ANN | |
License Status: Producing | |
License Date: 1975-11-20 | |
Spud Date: 1976-01-17 | |
Spud Drilling Contractor: | |
Final Drill Date: 1976-02-23 | |
Well Total Depth: 5312 ft | |
Configuration: Vertical | |
Latitude: 40.468358726 | |
Longitude: -81.35870744 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1975-11-20 | 2050 ORION PETRO CORP GeoDate 11/20/75 |
Original Spud | 1976-01-17 | |
Completed | 1976-02-23 | |
Reached Total Depth | 1976-02-23 | |
CO | 1995-02-28 | 4468 DIETZ OIL FIELD SUPPLY GeoDate 11/20/75 |
Change of Owner | 1997-09-09 | Operator changed from 4468, DIETZ OIL FIELD SUPPLY to 2543, TIPKA ENERGY DEVLOP CO |
Change of Owner | 2016-04-04 | Operator changed from 2543, TIPKA ENERGY DEVLOP CO to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5146 | 5182 | 6 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1595 Bbl | 26000 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0095507978 | 2018-09-20 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Domestic gas was being supplied off the 4.5 inch casing. Production equipment included a steel 100 barrel tank, a horizonal separator, and a chart recorder. The 100 barrel tank was within an earthen dike. The production report was up to date and proper identification was present. |
For data sources see[9]