If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-23197 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.013637028,"lon":-80.53634475,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000748 | |
Farm/Lease Name: POLAND-CLL2 | |
License Status: Producing | |
License Date: 2013-07-17 | |
Spud Date: 2013-08-14 | |
Spud Drilling Contractor: FALCON DRLG | |
Final Drill Date: 2014-01-01 | |
Well Total Depth: 14390 ft | |
Configuration: Horizontal | |
Latitude: 41.013637028 | |
Longitude: -80.53634475 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-17 | Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-01-01 | |
Construction Permit Expires | 2014-07-17 | |
Correction to Well | 2015-02-13 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-06-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-26 | 12110 | 14270 | 330 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-03-08 | H2O | 8 | 9535 Bbl | 505500 | Universal Well Services Inc. | STAGE 6
30 SHOTS |
2014-03-08 | H2O | 8 | 9623 Bbl | 502900 | Universal Well Services Inc. | STAGE 5
30 SHOTS |
2014-03-07 | H2O | 8 | 9554 Bbl | 496000 | Universal Well Services Inc. | STAGE 3
30 SHOTS |
2014-03-10 | H2O | 8 | 9543 Bbl | 505100 | Universal Well Services Inc. | STAGE 11
30 SHOTS |
2014-03-09 | H2O | 8 | 6705 Bbl | 505800 | Universal Well Services Inc. | STAGE 8
30 SHOTS |
2014-03-09 | H2O | 8 | 9621 Bbl | 500200 | Universal Well Services Inc. | STAGE 10
30 SHOTS |
2014-03-09 | H2O | 8 | 9628 Bbl | 500300 | Universal Well Services Inc. | STAGE 9
30 SHOTS |
2014-03-07 | H2O | 8 | 9600 Bbl | 503100 | Universal Well Services Inc. | STAGE 4
30 SHOTS |
2014-03-07 | H2O | 8 | 9898 Bbl | 500300 | Universal Well Services Inc. | STAGE 2
30 SHOTS |
2014-03-08 | H2O | 8 | 9556 Bbl | 497400 | Universal Well Services Inc. | STAGE 7
30 SHOTS |
2014-03-06 | H2O | 8 | 10480 Bbl | 499800 | Universal Well Services Inc. | STAGE 1
30 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | 633808 | 0 | 205 |
2015 | HILCORP ENERGY COMPANY | 602577 | 0 | 330 |
2016 | HILCORP ENERGY COMPANY | 364315 | 0 | 351 |
2017 | HILCORP ENERGY COMPANY | 249249 | 0 | 363 |
2018 | HILCORP ENERGY COMPANY | 146833 | 0 | 358 |
2019 | HILCORP ENERGY COMPANY | 30714 | 0 | 87 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | Brine | 14240 | 205 |
2015 | HILCORP ENERGY COMPANY | Brine | 29409 | 330 |
2016 | HILCORP ENERGY COMPANY | Brine | 12965 | 351 |
2017 | HILCORP ENERGY COMPANY | Brine | 4693 | 363 |
2018 | HILCORP ENERGY COMPANY | Brine | 2893 | 358 |
2019 | HILCORP ENERGY COMPANY | Brine | 245 | 87 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0143660252 | 2013-10-15 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. H&P Rig 225 is drilling out from under the 9.625 casing to their kick off point. |
0167105584 | 2016-09-09 | Production Wells | No Violations | Northeast Region Supervisor Tom Hill and my self met with Hilcorps Production personnel to discuss the annuals pressure 600 psi on this well. They removed the gage and bled the pressure off. There was no noticeable pressure coming out of the needle valve They installed a new gage and will monitor the pressures. |
0198518075 | 2015-09-28 | Production Wells | No Violations | I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time. |
0256627924 | 2013-08-24 | Drill / Deepen / Reopen | No Violations | I received a phone call from Tex the consultant for Hilcorp Energy that Falcone Drilling Rig #18 tripped out of the hole to change out there 12.250 hammer bit. Once out of the hole they discovered that the bottom and some of the inside of the bit was still in the well bore. Hilcorp engineers decision was to place a two hundred ( 200 ) foot plug on top of bit debris through drill pipe. Wait 8 hours and go back and side track the plug. I called Deputy Chief Bob Worstall and talked with him he gave me the go head. There will be a plug back report on file. |
0258726695 | 2016-01-20 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
0278929259 | 2013-09-20 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig #18 drilled a 12.25 well bore to a total depth of 2584 and ran 2584 of 9.625 36# CSG J-55 intermediate casing. Baker Hughes pumped 237 barrels ahead followed by 35 barrels of Bentonit Pill w/Flake & Fed Seal and 10 barrels of fresh water spacer that was followed by 872 sacks of PNE-1+.05% Static Free + 1% cacl2 + .5% BA-10A cement. There was good circulation through out the job. There was 24 barrels of cement returned to surface. Plug bumped floats held. Shut cement head in. |
0347065818 | 2014-01-31 | Drill / Deepen / Reopen | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time. |
0491205845 | 2013-07-20 | Drill / Deepen / Reopen | No Violations | Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. Kevin Perry covered this job. |
0499619948 | 2015-11-02 | Production Wells | No Violations | I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time. |
0634661428 | 2017-01-13 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0753980958 | 2014-06-09 | Production Wells | No Violations | On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs. |
0799047177 | 2013-07-20 | Drill / Deepen / Reopen | No Violations | I was on location for the cementing of the conductor pipe. The 20 casing was set at 90. Express Energy was the company on location for drilling the conductor and cementing it. Circulation was established and Class A cement with 2 % calcium and 8 oz. of flake was used. The cement scaled at approximatly 15.6 ppg. 173 sacks of cement was used at approximatly 50% excess. I witnessed cement return to surface and the casing was shut in for the cement to set. |
1123097856 | 2016-10-14 | Production Wells | No Violations | I performed a follow up inspection. Hilcorp has installed the gage and also installed 3/8 tubing on the 13-3/8 annuals into the flowline at present there is 50 psi. ID signs are posted no noted violation at this time. |
1203133780 | 2013-10-17 | Drill / Deepen / Reopen | No Violations | I was on location to perform a status check. Bill Mitchell Drilling Consultaion for Hilcorp explained what they were doing. On 8/24/2013 Falcone Rig 18 was drilling with there 12.25 with a air hammer bit when they tripped out of the hole they discovered that the bottom of the bit and some parts were still in the well bore. There was two cement plugs set in the well bore. H&P 225 drilling rig was drilling the offset to go around the fish but the cement was too soft. They had to drill out the plug and set a new cement plug through drill pipe. |
1377631042 | 2013-08-26 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of drilling the wells on this pad location. Currently a top hole rig is on location drilling the surface holes for the wells so that the completions rig can come onto location. Currently the rig is around 4200 feet and sidetracking the well due to the fact that an air hammer was lost down hole. A plug was set and the rig is going to drill out the plug. |
1379959507 | 2013-08-26 | Drill / Deepen / Reopen | No Violations | Falcone Rig #18 ran back in the hole to tag there 200 cement plug at 4070 but tagged at 4280 the plug had dropped. The decision was made by Hilcorp Energy to set a new plug through drill pipe from 4280 to 3580 ( 700 plug ) and wait 4 hours and set another plug from 3580 to 2900 ( 680 plug ). Cap well until the horizontal rig moves on location to drill the off set. |
1380718930 | 2013-08-16 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig #18 drilled a 17.5 hole to a total depth of 950 and ran 950 of 13- 3/8 61# J-55 casing. Baker Hughes pumped 140 barrels ahead and 35 barrels of Gel with Fed Seal and Cello flake followed by 10 barrels of fresh water spacer. They pumped 821 sacks of PRE-NE-1+.05S-FREE=2CACL2 cement. There was good circulation through out the job. Dropped plug displaced with 138 barrels of water, plug held with 605 psi. shut cement head in. There was 15 barrels of cement returned to surface. |
1419877793 | 2014-12-26 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. A motor value was sand cut and released sand and some stain on the gravel between the GPU units. I contacted Hilcorps Operations Manager, Tom Havanek and spoke to him about the clean up of the stained gravel, there were no noted fluids on the gravel. He stated that they would be a crew there on Tuesday 12/30/2014 to vacuume it up. |
1438358983 | 2017-06-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1477064393 | 2016-09-30 | Production Wells | No Violations | I performed a follow up inspection to check the pressure between the annuls 13-3/8 and the 9-5/8 casing there was 660 psi. I called Tom Havanek and instructed him to install a relieve valve or to plumb the annuals into the flowline (50 psi). He instructed that he would have his contractor to perform the job. |
1586171175 | 2015-08-21 | Production Wells | No Violations | I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
1612717525 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
1629604409 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in. |
1700577609 | 2018-11-06 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1786922027 | 2014-06-11 | Administrative Inspection | No Violations | I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected. |
1841720970 | 2015-06-17 | Preliminary Restoration | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1893303000 | 2013-08-15 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At present Falcone Drilling Rig 18 is drilling at a depth of 630. Area is clean of debri and spills. Permits are posted. No noted violations noted at this time. |
1904753787 | 2016-08-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. I noticed that the annuals had 800 psi between the 13-3/8 and the 9-5/8. I called Tom Havanek Operation Manager and told him about the pressure. He set up a meeting for 9/9/2016 at 1:00 PM with his production personnel. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There are also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1911300154 | 2014-05-06 | Production Wells | No Violations | I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time. |
1927381017 | 2014-12-30 | Preliminary Restoration | No Violations | Northeast Region Supervisor Tom Hill and my self were at the location to witness the clean up of a 10x15 area of gravel that was stained. This was caused from a motor value at the separator sand cut which allowed the release of sand and causing the stain. There was no pools of oil/condensate were notice on the location. IPC Energy Services was the contractor on cleaning the location. The material that was removed will be disposed of at an approved facility. Job was completed. |
2044642078 | 2018-06-27 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
For data sources see[9]