If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24998 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.902838948,"lon":-81.94271268,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: Canaan Township | |
Operator Name: PETRO EVALUATION SERV INC | |
Well Pad ID: | |
Farm/Lease Name: ERDOS | |
License Status: Producing | |
License Date: 1994-09-01 | |
Spud Date: 1994-08-30 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1994-09-05 | |
Well Total Depth: 5680 ft | |
Configuration: Vertical | |
Latitude: 40.902838948 | |
Longitude: -81.94271268 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1994-08-30 | CHG ACREAGE 9-24-94 |
Oil and Gas | 1994-09-01 | Issued Date 9/1/94 Expired Date 9/1/95 Acres 0145060 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 05680 Proposed Drill Depth 05680 |
Completed | 1994-09-05 | CHG ACREAGE 9-24-94 |
Reached Total Depth | 1994-09-05 | CHG ACREAGE 9-24-94 |
CO | 1994-11-01 | 164 PETRO EVALUATION SERV INC GeoDate 9/1/94 |
Completion Report Received | 1995-03-21 | CHG ACREAGE 9-24-94 |
Construction Permit Expires | 1995-09-01 | CHG ACREAGE 9-24-94 |
Record Last Modified | 2017-02-15 | CHG ACREAGE 9-24-94 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5566 | 5559 | 6 |
1997-06-29 | 5558 | 0 | |
2006-09-11 | 5580 | 5590 | 2 |
2006-09-11 | 5610 | 5616 | 12 |
2006-09-11 | 5595 | 5598 | 6 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 2000 Gal | 0 | TREATED W/2000 GAL HCL AND 600 BBL | ||
H2O | 0 | 600 Bbl | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0242217787 | 2015-12-08 | Production Wells | No Violations | Inspected production well on 12/08/2015. The tank battery consists of 3-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0246792394 | 2014-04-23 | Production Wells | No Violations | This producing pumping unit well has no apparent problems at this time. |
0979281416 | 2017-01-18 | Production Wells | No Violations | Inspected production well on 01/18/2017. The tank battery consists of 3-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1049475466 | 2018-02-28 | Production Wells | No Violations | Inspected production well on 02/28/2018. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank (shared), 1-vertical separator (shared), and 1-meter box (shared), located within an earthen dike; the diked area and noted equipment are shared with the Erdos #2 well (PN: 169-25003). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, with the wellhead located within a small earthen dike. The well was pumping at the time of the inspection. No problems were noted at the time of the inspection. |
1432429009 | 2016-09-14 | Production Wells | No Violations | Inspected production well on 09/14/2016. The tank battery consists of 3-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1439384926 | 2015-08-12 | Production Wells | No Violations | This is a pump jack well that appears to have no problems at time of inspection. There are no apparent compliance issues at this time. |
1513201815 | 2017-01-18 | Preliminary Restoration | No Violations | Inspected production well on 01/18/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
For data sources see[9]