If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25449 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.673882876,"lon":-81.98686843,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: Franklin Township | |
Operator Name: CAPSTONE OIL PRODUCING LLC | |
Well Pad ID: | |
Farm/Lease Name: HOSTLETLER ELI | |
License Status: Producing | |
License Date: 2002-06-20 | |
Spud Date: 2003-05-19 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 2003-06-26 | |
Well Total Depth: 3350 ft | |
Configuration: Vertical | |
Latitude: 40.673882876 | |
Longitude: -81.98686843 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-06-20 | Proposed Formations:CLINTON, Issued Date:6/20/2002, Expired Date:6/20/2003 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2003-01-24 | CHANGE IN CASING PROGRAM AND TOOL . |
Original Spud | 2003-05-19 | RBDMS Rec |
Construction Permit Expires | 2003-06-20 | RBDMS Rec |
Completed | 2003-06-26 | RBDMS Rec |
Reached Total Depth | 2003-06-26 | RBDMS Rec |
Completion Report Received | 2003-11-13 | RBDMS Rec |
Change of Owner | 2018-12-18 | Operator changed from 627, KENOIL LLC to 9349, CAPSTONE OIL PRODUCING LLC |
Record Last Modified | 2018-12-18 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2004-01-02 | 3174 | 3232 | 47 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | KENOIL LLC | 410 | 529 | 0 |
2004 | KENOIL LLC | 1438 | 519 | 365 |
2005 | KENOIL LLC | 700 | 208 | 365 |
2006 | KENOIL LLC | 428 | 144 | 365 |
2007 | KENOIL LLC | 355 | 72 | 365 |
2008 | KENOIL LLC | 292 | 125 | 365 |
2009 | KENOIL LLC | 210 | 78 | 365 |
2010 | KENOIL LLC | 201 | 112 | 365 |
2011 | KENOIL LLC | 169 | 47 | 0 |
2012 | KENOIL LLC | 143 | 55 | 366 |
2013 | KENOIL LLC | 91 | 46 | 365 |
2014 | KENOIL LLC | 74 | 49 | 365 |
2015 | KENOIL LLC | 74 | 41 | 365 |
2016 | KENOIL LLC | 70 | 63 | 365 |
2017 | KENOIL LLC | 40 | 42 | 365 |
2018 | KENOIL LLC | 5 | 37 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | KENOIL LLC | Brine | 144 | |
2004 | KENOIL LLC | Brine | 80 | 365 |
2005 | KENOIL LLC | Brine | 0 | 365 |
2006 | KENOIL LLC | Brine | 35 | 365 |
2007 | KENOIL LLC | Brine | 0 | 365 |
2008 | KENOIL LLC | Brine | 20 | 365 |
2009 | KENOIL LLC | Brine | 0 | 365 |
2010 | KENOIL LLC | Brine | 32 | 365 |
2011 | KENOIL LLC | Brine | 40 | |
2012 | KENOIL LLC | Brine | 0 | 366 |
2013 | KENOIL LLC | Brine | 35 | 365 |
2014 | KENOIL LLC | Brine | 0 | 365 |
2015 | KENOIL LLC | Brine | 0 | 365 |
2016 | KENOIL LLC | Brine | 0 | 365 |
2017 | KENOIL LLC | Brine | 0 | 365 |
2018 | KENOIL LLC | Brine | 30 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0563886217 | 2017-07-19 | Production Wells | No Violations | Inspected production well on 07/19/2017. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-drip, 1-meter, 1-meter box, and 1-underground brine vault, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
0602529535 | 2015-07-27 | Production Wells | No Violations | This pump jack well appears to have no problems nor compliance issues at time of inspection. |
1291811209 | 2003-06-03 | Drill / Deepen / Reopen | No Violations | Nobody around again today . |
1598631217 | 2003-09-11 | Preliminary Restoration | No Violations | Pits are closed and area needs graded and seeded before P restoration can be passed. |
1599371953 | 2013-01-28 | Production Wells | No Violations | This is a producing pump jack well. There well was pumping at the time of the inspection. There were no problems noted at the time of the inspection. |
1715921271 | 2003-05-27 | Drill / Deepen / Reopen | No Violations | Arrive on site and found nobody around today .Dannacer Drilling set 397 ft. of 7 inch casing c/w 65 sks . Not witnessed by Inspector - on vacation . Petroset Wooster .Cement returns not indicated on ticket . |
1790567384 | 2014-01-27 | Production Wells | No Violations | This producing pumping unit well has no apparent problems at time of inspection. |
1834014924 | 2003-06-06 | Drill / Deepen / Reopen | No Violations | Dannager Drilling is 1985 ft. deep on 6 1/4 hole on fluid rotary with a Cable tool rig . The rig has a power swivle and 3.5 drill pipe with collars in the well . |
1928540265 | 2003-07-02 | Completion Testing | No Violations | Set up to Frac today , talk to Ron Grosjean on area wells. |
2021721622 | 2017-07-19 | Preliminary Restoration | No Violations | Inspected production well on 07/19/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
For data sources see[9]