If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-163-20720 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.170063905,"lon":-82.45361818,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Vinton | |
Municipality: Clinton Township | |
Operator Name: ADOBE RESOURCES CORP | |
Well Pad ID: | |
Farm/Lease Name: THE CHURCH FOUNDATION | |
License Status: Final Restoration | |
License Date: 1984-05-31 | |
Spud Date: 1982-06-01 | |
Spud Drilling Contractor: S W JACK DRLG | |
Final Drill Date: 1982-06-05 | |
Well Total Depth: 3229 ft | |
Configuration: Vertical | |
Latitude: 39.170063905 | |
Longitude: -82.45361818 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-03-29 | 538 ADOBE RESOURCES CORP GeoDate 3/29/82 |
Oil and Gas | 1982-03-29 | Issued Date 3/30/82 Expired Date 8/30/82 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03229 Proposed Drill Depth 03229 |
Original Spud | 1982-06-01 | I.P. DRY. |
Completed | 1982-06-05 | I.P. DRY. |
Reached Total Depth | 1982-06-05 | I.P. DRY. |
Completion Report Received | 1982-08-01 | I.P. DRY. |
CO | 1984-05-31 | 538 ADOBE RESOURCES CORP GeoDate 5/31/84 |
DRY HOLE | 1984-05-31 | Issued Date 5/31/84 Expired Date 11/27/84 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date 6/25/84 |
Plugged/Abandoned | 1984-06-25 | I.P. DRY. |
Construction Permit Expires | 1984-11-27 | I.P. DRY. |
Record Last Modified | 2013-03-14 | I.P. DRY. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3037 | 3055 | 9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
CO2 | 0 | 250 Mscf | 0 | |||
H2O | 0 | 35000 Gal | 66000 | FRAC: 35MG FLUID, 66M SAND, 250M CO2 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000DP9439 | Final Restoration | No Violations | Final Restoration done information from Data Point | |
01269i1360 | 2002-09-11 | Preliminary Restoration | No Violations | P. REST MEETS REQUIREMENTS, WELL HAS BEEN PLUGGED. |
For data sources see[5]