If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-21752 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.16560652,"lon":-81.30894904,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: LATHAM LEWIS W | |
License Status: Producing | |
License Date: 1975-05-06 | |
Spud Date: 1975-06-04 | |
Spud Drilling Contractor: | |
Final Drill Date: 1975-06-21 | |
Well Total Depth: 5963 ft | |
Configuration: Vertical | |
Latitude: <Latitude> | |
Longitude: -81.30894904 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1975-05-06 | 2543 TIPKA ENERGY DEVLOP CO GeoDate 5/6/75 |
Original Spud | 1975-06-04 | R.I. 5-7-75 I. P. NONE RPT. |
Completed | 1975-06-21 | R.I. 5-7-75 I. P. NONE RPT. |
Reached Total Depth | 1975-06-21 | R.I. 5-7-75 I. P. NONE RPT. |
Change of Owner | 2002-06-10 | Operator changed from 2543, TIPKA ENERGY DEVLOP CO to 7219, DIMPLE ROCK DEVELOPMENT |
Change of Owner | 2006-12-29 | Operator changed from 7219, DIMPLE ROCK DEVELOPMENT to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2019-06-04 | R.I. 5-7-75 I. P. NONE RPT. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5858 | 5952 | 18 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0032233759 | 2007-06-07 | Production Wells | No Violations | STATUS CHECK |
0099636411 | 2004-01-29 | Production Wells | No Violations | STATUS CHECK |
0382547326 | 2016-12-14 | Production Wells | No Violations | On the day of my inspection with the ground snow covered, I witnessed that the production equipment included a 100 barrel tank, a 50 barrel polymer brine tank, a horizontal separator, a 2 inch sales meter with a .75 inch orifice and a chart recorder. The well was equipped with 8.625 inch diameter casing; 4.5 inch diameter casing, 1.5 inch diameter tubing and a plunger lift system with all valves in the closed position. Identification was present and production records were current. |
1233964981 | 2006-01-10 | Production Wells | No Violations | WELL PRODUCING |
1326700003 | 2016-03-31 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a 100bbl tank, a horizontal separator, a 2 inch sales meter with a .75 inch orifice and a chart recorder. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing and a plunger lift system with all valves in the closed position. Identification was present and production records were current. |
1401643671 | 2014-07-15 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a 100bbl tank, a horizontal separator, a 2 inch sales meter with a 1 inch orifice and a chart recorder. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, a plunger lift system with all valves open on the tubing and 1 of 2 valves open on the casing supplying the motor valve. Casing pressure was at 600psi. Identification was present and production records were current. |
1406725308 | 2014-07-30 | Production Wells | No Violations | On the date of inspection I witnessed that the well is equipped with a gas plunger lift, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch surface casing. One 100bbl steel tank, one 50bbl plastic tank, and a horizontal separator are located within the earthen dike. Production records are up to date. |
1638005398 | 2018-05-18 | Production Wells | No Violations | The purpose of my inspection was a status check. The well was equipped with 8.625 inch diameter surface casing with a casing head, 4.5 inch diameter production casing with a tubing head, 1.5 inch diameter tubing, and a plunger lift system. Production valves appeared to be in the closed position. The production equipment consisted of one 100 barrel tank, one 2100 gallon poly tank, one horizontal separator, and a sales meter. The sales meter had a 2 inch diameter sales line, a .75 inch orifice plate, and a chart recorder. Identification was present and production records were current. |
1922575755 | 2005-11-09 | Production Wells | No Violations | STATUS CHECK |
For data sources see[8]