34-081-20760

Well Details

Well ID: 34-081-20760
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Mount Pleasant Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001541
Farm/Lease Name: MARQUARD W MTP JF
License Status: Producing
License Date: 2018-04-10
Spud Date: 2018-04-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-06-20
Well Total Depth: 22772 ft
Configuration: Horizontal
Latitude: 40.190109649
Longitude: -80.79959365

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-05 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/5/2018, Expired Date:3/4/2020 12:00:00 PM, Drilling unit acres:157.389, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2018-04-10 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/10/2018, Expired Date:4/9/2020 12:00:00 PM, Drilling unit acres:619.41, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-06-20
Correction to Well 2018-09-14 TARGET/TAKE AS-DRILLED
Completion Report Received 2018-11-06
Record Last Modified 2018-11-08
Construction Permit Expires 2020-04-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-11-07 10108 10248 0
2018-11-07 22494 22593 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/16/2018 08/05/2018 9697 15,830,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 1.4787 2,230,920.0
GEL-1100 Mountian Supply and Service Gelling Agent Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG Halliburton Proppant Listed Below Listed Below 0 0 0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.4063 131,870,000.0
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Hydrochloric acid 7647-01-0 7.5 0.10593 159821
Glutaraldehyde 111-30-8 30 0.00641255 9675
Polymer Proprietary 68 0.00006357 96
Acrylic acid 79-10-7 0.01 0.00000229 4
Emulsifier 9002-92-0 10 0.00000935 15
Phosphoric acid 7664-38-2 0.1 0.00002138 33
Crystalline silica, quartz 14808-60-7 100 11.0778 16,713,200.0
Ethoxylated alcohols Proprietary 30 0.000319739 483
Citric acid 77-92-9 60 0.00445736 6725
Sodium sulfate 7757-82-6 0.1 0.00000000 1
Sodium polyacrylate 9003-04-7 1 0.000229462 347
PH Buffer 8055-55-8 15 0.00001402 22
Propargyl alcohol 107-19-7 10 0.00010658 161
Modified thiourea polymer Proprietary 30 0.000319739 483
Sodium persulfate 7775-27-1 100 0.00000318 5
Hydroteated light petroleum distillate 64742-47-8 30 0.015151 22859
Inorganic salt Proprietary 30 0.015151 22859
Olefins Proprietary 5 0.000127895 196
Ethanol 64-17-5 1 0.000213752 323
Ethylene glycol 107-21-1 60 0.0137677 20772
Acrylamide acrylate polymer Proprietary 30 0.015151 22859
Methanol 67-56-1 60 0.000669403 1011
Fatty acids, tall oil Proprietary 30 0.000319739 483
Telmer Proprietary 10 0.00229462 3462
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl chlorides 68424-85-1 5 0.00106876 1613
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-16 H2O 15 230669 Gal 237960 Halliburton
2018-08-05 H2O 15 208146 Gal 236360 Halliburton STAGE 71/71

STAGES 2-70 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 2514472 0 108
2019 ASCENT RESOURCES UTICA LLC 2168813 0 77

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 13676 108
2019 ASCENT RESOURCES UTICA LLC Brine 9071 77

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0468325574 2018-04-24 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Precision Rathole has set a cellar on this well but has not spudded.
0880661050 2018-06-11 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 284 had reached total depth of their 12.25 inch diameter section. They are loading the hole with 12 ppg oil base mud prior to running the 9.625 inch diameter casing. Walk around location revealed no issues with containment.
1184739030 2018-06-22 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 284 tripping out of the hole. They have drilled their 8.5 inch diameter hole to a total depth of 22772. Production cement job will occur on Friday night or Saturday. Walk areound location revealed no issues. Area had significant rains recently and pad does have pooling water.
1522456677 2018-08-15 Completion Testing No Violations On the day of my inspection I found this pad to contain two wells that have been drilled and fracked. Also one well not drilled below the surface casing. Production equipment includes two 500 barrel steel tanks, two GPUs, two line heaters, and 4 sand seperators. ID to Ascent construction inspector Jordy Bernard. Production equipment and well connect construction is occuring. Surface annular pressure is zero and intermediate annular pressure is 1500. Frac plugs have not been drilled out.
1528201217 2018-06-05 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 284 drilled a 17.5 inch diameter open hole to a depth of 1587 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 284 feet. Wyoming Casing ran 1581 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Shoe track is 43 feet long. Schlumberger was onsite with 1553 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. . Cement displaced with 234 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 90 barrels of cement returned to surface, and floats held with 1 barrel back.
1607655317 2018-08-29 Completion Testing No Violations On the day of my inspection I witnessed Deep Well onlocation with a snubbing unit. Identified myself to Company Man James Edwards. This well has had all plugs drilled out and they are tripping out of the well. Manifold has 3850 psi. Surface annular pressure is 0 and intermediate annular is 300 psi.
1630618261 2018-05-03 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 24 inch diameter open hole to a depth of 279 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming Casing ran 273 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with a 3 foot stick up. Casing was not centralized. Shoe track is 23 feet long. Cement Baskets were set at 163 feet. #8A coal encountered from 196-200 feet and #8 coal encountered from 222-229. No loss of returns while drilling. CJ/O-tex was onsite with 515 sacks of class A cement. Additives include3% CaCl and 0.2% X-air. Cement weighed with mudscale at 15.8 ppg and yield of 1.17. 50% excess ran in open hole. Cement displaced with 75 barrels of fresh water. 35 barrels of gel pumped ahead of cement. No cement returned to surface. Cement tagged 18 feet below cellar floor. Pumped 10 barrels of cement through 1 inch tubing and got 2 barrels back to surface.
1638379190 2018-07-18 Completion Testing No Violations On the day of my inspection I found Halliburton frac crew on location. This well is on stage 8. Plug is at 21412, bottom perforation at 21399, and top perforation is at 21259. Surface annular pressure is 0 and intermediate is 315. Just finished stimulating the 1H well.
1753644353 2018-04-25 Casing String Witnessed No Violations Pad address is 640 TOWNSHIP ROAD 107A DILLONVALE 43917. On the day of my inspection I witnessed Precision Rathole had augured a 36 inch diameter hole to a depth of 100 feet. 100 feet of 30 inch diameter conductor casing was run. CJ/Otex was onsite with 310 sacks of class A cement. Additives include 2% CaCl and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% percent excess ran. . Cement was displaced with 75 barrels of fresh water. 15 barrels of cement returned to surface. Company Man Doug Bennett and Cement supervisor Steven Long onsite.
1773988963 2018-08-06 Completion Testing No Violations On the day of my Inspection I witnessed Halliburton frac crew moving off of location. ID to company man Louis. 2 kill plugs were set in this wellbore at 9720 and 9590. Surface and intermediate annular pressures are zero and 450, respectively.
2035272667 2018-07-24 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew on location. This well is on stage 23. Plug is at 18757, bottom perforation at 18744, and top perforation is at 18604. Surface annular pressure is 0 and intermediate is 66. No stimulations occurring while on location.
2108426268 2018-08-01 Completion Testing No Violations On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company man Louis. Halliburton frac crew is onsite and pumping on this well. Intermediate annular pressure is 314 psi. Stage 55 has plug set at 13093, bottom perforation at 13081, and top perforation at 12940. They are pumping 230000 lbs of total sand; 40000 lb 100 mesh and 190000 lbs of 40/70 mesh. Breakdown presure for this stage was 9562 at 30 barrels per minute. 3000 gallons of 7.5 % acid used.