X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-103-25010

Well Details

Well ID: 34-103-25010
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Guilford Township
Operator Name: KING DRILLING CO
Well Pad ID:
Farm/Lease Name: ROHRER P
License Status: Producing
License Date: 2006-11-16
Spud Date: 2007-06-19
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2007-06-23
Well Total Depth: 3712 ft
Configuration: Vertical
Latitude: 41.011824096
Longitude: -81.81759414

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-11-16 Proposed Formations:CLINTON, Issued Date:11/16/2006, Expired Date:11/16/2007 6:00:00 AM, Drilling unit acres:74.27, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2007-06-23
Reached Total Depth 2007-06-23
Completion Report Received 2007-08-17
Construction Permit Expires 2007-11-16
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-11-15 3512 3582 19

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 32290 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 KING DRILLING CO 1953 189 365
2008 KING DRILLING CO 4960 209 365
2009 KING DRILLING CO 2693 159 365
2010 KING DRILLING CO 2912 120 365
2011 KING DRILLING CO 2642 47 365
2012 KING DRILLING CO 2632 35 366
2013 KING DRILLING CO 2811 41 365
2014 KING DRILLING CO 2949 0 365
2015 KING DRILLING CO 3460 31 365
2016 KING DRILLING CO 4678 0 365
2017 KING DRILLING CO 5314 35 365
2018 KING DRILLING CO 5047 31 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 KING DRILLING CO Brine 760 365
2008 KING DRILLING CO Brine 0 365
2009 KING DRILLING CO Brine 0 365
2010 KING DRILLING CO Brine 5 365
2011 KING DRILLING CO Brine 0 365
2012 KING DRILLING CO Brine 0 366
2013 KING DRILLING CO Brine 0 365
2014 KING DRILLING CO Brine 0 365
2015 KING DRILLING CO Brine 0 365
2016 KING DRILLING CO Brine 0 365
2017 KING DRILLING CO Brine 0 365
2018 KING DRILLING CO Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0369229478 2007-03-02 Drill / Deepen / Reopen No Violations Location has been made and drilling pits dug but not lined. Medina County refused Capstars drilling rig due to frost laws. Windy, 35 degrees.
0635661172 2009-06-03 Preliminary Restoration No Violations Restoration approved. Well is in production. Equipped with pump jack, rods and tubing. 1-100 barrel tank and separator in battery. Rain, 60 degrees.
1055734361 2015-06-03 Production Wells No Violations Inspected production well on 06/03/2015. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with a gas-powered motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
1182427863 2007-06-21 Drill / Deepen / Reopen No Violations Capstrar Drilling company drilling at 600. Missed surface job. Picked up cement ticket and completed report. Drilling pits are lined and blowout preventor in place. Drilled surface hole on fluid. Cloudy, 70 degrees.
1190728824 2007-09-25 Preliminary Restoration No Violations Well is in production and drilling pits are closed. Top soil being graded on location. Dry, 80 degrees.
1211467798 2008-05-22 Preliminary Restoration No Violations Met with Andrew King to discuss restoration of location. 300 barrel tank will be removed in 2 weeks and top soil spread and seeded. Landowner is contracted to finish reclamation. Spud date 6-19-2007.
1444817629 2014-10-23 Production Wells No Violations Inspected production well on 10/23/2014. The well is equipped with a pump jack with a gas-powered motor. Well identification is posted at the wellhead, but it is too faded to read and needs replaced. Andrew King with King Drilling was notified ot this and will address it directly. No tanks were noted nearby. No other problems were noted at the time of the inspection.

For data sources see[9]

References