Well Details

Well ID: 34-013-20746
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Smith Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001042
Farm/Lease Name: GOLD DIGGER
License Status: Producing
License Date: 2014-07-23
Spud Date: 2014-07-04
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-08-04
Well Total Depth: 18767 ft
Configuration: Horizontal
Latitude: 40.015018415
Longitude: -80.94600829

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-01-31 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/31/2014, Expired Date:1/31/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-07-23 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/23/2014, Expired Date:7/22/2016 12:00:00 PM, Drilling unit acres:386.592, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-08-04
Completion Report Received 2015-05-22
Correction to Well 2015-06-05 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2016-07-22
Record Last Modified 2018-04-06

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-05-28 9705 18752 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/22/2014 12/27/2014 9528 17,254,200.0 23,286,700.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bio- WFT Bactericide Sodium Bromide 7647-15-6 1.5 0.000346921 597.9
2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.0011564 1993
Polyethylene Glycol 25322-68-3 65 0.0150332 25909
Dibromoacetonitrile 3252-43-5 0.5 0.00011564 199.3
WAI-251LC WFT Inhibitor Triethylphosphate 78-40-0 5 0.00002624 45.22
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005248 90.45
1-Octanol 111-87-5 5 0.00002624 45.22
1-Decanol 112-30-1 5 0.00002624 45.22
Isopropyl Alcohol 67-63-0 5 0.00002624 45.22
Ethylene Glycol 111-76-2 40 0.000209924 361.79
Ethoxylated Nonylphenol 68412-54-4 5 0.00002624 45.22
N,N-Dimethylformamide 68-12-2 20 0.000104962 180.9
2-Butoxyethanol 111-76-2 10 0.00005248 90.45
40/70 Premium WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 2.60115 4,482,930.0
WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.00184223 3174.98
15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.046334 517107
Water Rice Energy Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 85.8555 147,967,000.0
100 Mesh WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 10.601 17,746,800.0
WSI-685L WFT Inhibitor Monoethanolamine Hydrochloride 2002-24-6 15 0.00405873 6995
Ammonium Chloride 12125-02-9 15 0.00405873 6995
Methyl Alcohol 67-56-1 2.5 0.000676455 1165.83
Friction Reducers WFT Friction Reducers Petroleum distillates, hydrotreated light 64742-47-8 40 0.23185 399581
Ammonium acetate 631-61-8 5 0.00289813 4994.77
Other Chemicals Phosphonic acid ammonium salt Proprietary 0 0.000607403 1064.83
Cinnamaldehyde 104-55-2 0 0.00002624 45.22
Ethylene Oxide 75-21-8 0 0.00000525 9.04
Dioxane 123-91-1 0 0.00000525 9.04
Acetaldehyde 75-07-0 0 0.00000525 9.04

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-11-22 H2O 15 9028 Bbl 504940 Weatherford STAGE 1/45

36 SHOTS STAGES 2-44 SEE IMAGES

2014-12-25 H2O 15 8812 Bbl 500580 Weatherford STAGE 45/45

36 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 RICE DRILLING D LLC 4295595 0 314
2016 RICE DRILLING D LLC 3643170 0 360
2017 RICE DRILLING D LLC 1737855 0 352
2018 RICE DRILLING D LLC 362123 0 138
2019 RICE DRILLING D LLC 326919 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 RICE DRILLING D LLC Brine 29153 314
2016 RICE DRILLING D LLC Brine 35274 360
2017 RICE DRILLING D LLC Brine 14939 352
2018 RICE DRILLING D LLC Brine 11018 138
2019 RICE DRILLING D LLC Brine 10295 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0061079268 2018-04-06 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges were present for monitoring annular pressure 13.375 inch diameter casing read 350 pounds per square inch, 9.625 inch diameter casing read 1950 pounds per square inch. The production equipment included a Gas Processing unit, a line heater and a sand trap. Also present 5- 400 barrel purge tanks shared with 3401320747, 3401321072, 3401321073, 3401321074, 3401321075, 3401321077. Identification tags were present and production was up to date.
0145918564 2018-07-10 Production Wells No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong. The well site entrance point was marked with signage and the lease road was of gravel construction. There is 2 well pads sitting next to one another back the same lease road with the Gold Digger being the rear pad and the Sonuvadigger being the pad closest to State Route 9. There was recently 5 wells newly drilled on the Gold Digger pad and 2 prior producing wells. The said well was equipped with electronic annular pressure monitoring on both the 13.375 and 9.625 well head sections. The 9.625 well head gauge showed 465 psi and the 13.375 showed 450 psi on the manual gauge. The well was selling off the production tubing tree with 2 manually controlled valves in place on the well head followed by an emergency shut down valve with multiple shut down point on the well pad. Also present on location is one gas processing unit present for each well supported by a production fluid facility consisting of 5 steel tanks of 400 barrel construction design situated inside a polymer lined steel containment dike area.
0152914605 2018-08-23 Production Wells No Violations Upon inspection the well was observed to be equipped with a lower A and upper B section with 2 diameter riser pipes attached to the A&B section outlet ports, the riser pipes are equipped with valves and gauges. The A section gauge which monitors the pressure between the 13.375 and 9.625 diameter casing string reads 356 pound pressure. The B section gauge which monitors the pressure between the 5.5 and 9.625 diameter strings reads 344 pounds pressure. The 5.5 diameter production casing reads 1,400 pounds pressure and the production tubing head reads 1,200 pounds pressure. 7 wells total are producing on this pad. The production fluid storage area consists of 5 steel design 400 barrel fluid volume tanks that are situated inside a polymer lined steel containment dike area.
0227755179 2014-11-17 Completion Testing No Violations On this day completions work was to begin. A zipper frac was to be utilized where the two wells on the pad would be completed at the same time. No violations noted.
0296446333 2014-08-04 Drill / Deepen / Reopen No Violations Halliburton cemented the 5.5 casing on 8/3/2014. Patterson 349 is moving to the 3H well this date.
0313000726 2018-04-06 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges were present for monitoring annular pressure 13.375 inch diameter casing read 350 pounds per square inch, 9.625 inch diameter casing read 1950 pounds per square inch. The production equipment included a Gas Processing unit, a line heater and a sand trap. Also present 5- 400 barrel purge tanks shared with 3401320747, 3401321072, 3401321073, 3401321074, 3401321075, 3401321077. Identification tags were present and production was up to date.
1155724587 2014-07-28 Drill / Deepen / Reopen No Violations On the date of inspection I accompanied ODNR Inspector Andrew Corder to check the drilling status of the well. Refer to Andrew Corders report for further details.
1323896946 2014-06-02 Drill / Deepen / Reopen No Violations Onsite with Inspector Andrew Corder. See his inspection report this date.
1408366276 2014-08-13 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson 349 was drilling in the lateral section and would be running casing soon. No violations noted.
1595302668 2014-06-02 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson # 349 was rigging up to begin drilling. No violations noted.
1623693553 2014-07-30 Drill / Deepen / Reopen No Violations On the day of my inspection the company had almost reached total depth. The 5.5 casing would be ran and cemented after reaching T.D and cleaning the hole. No violations noted.
1813658199 2018-07-10 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a four-string casing design with 20-inch diameter surface casing, 13.375-inch diameter intermediate casing, 9.625-inch diameter deep intermediate casing and 5.5-inch diameter production casing, and 2.875-inch diameter tubing, the well was currently under normal production and appeared to be open flowing. Annular pressure monitoring was in place, the 9.625-inch diameter intermediate casing gauge read 2215 pounds per square inch, the 13.375-inch diameter surface casing gauge read 385 pounds per square inch. The 5.5-inch diameter production casing was also at 2215 pounds per square inch and appeared to be communicating with the 9.625-inch diameter deep intermediate casing. Production equipment included an individual Gas Processing unit. Shared production equipment included a dehydrator, 2 phase separators, contact tower, and 3- 400-barrel purge tanks shared with 34013210760000, 34013210750000, 34013210740000, 34013210730000, 34013210720000, 34013207460000. The well pad and all equipment were contained in an earthen dike with secondary containment around the production tanks. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was up to date.
1852527936 2014-07-28 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson 349 was drilling ahead in the lateral section. No violations noted.
1967183186 2014-07-09 Casing String Witnessed No Violations On the day of my inspection the 13.375 casing was ran and cemented. See cement ticket for details. No violations noted.
2042973903 2018-11-21 Production Wells No Violations Status check inspection found the well equipped with a production tree with (2) primary gate valves and an emergency shut down device present in the 3.5 diameter production flow line. The tubing head pressure is 500 pounds per square inch (psi) the 13.375 diameter casing head pressure is 21 psi and the 9.625 diameter casing pressure is 250 psi. The 5.5 diameter casing well head section has 2,000 pounds pressure on the gauge. The production facility consists of (5) 400 barrel capacity steel tanks.

For data sources see[10]