34-129-20239

Well Details

Well ID: 34-129-20239
Loading map...
Country: United States
State: Ohio
County: Pickaway
Municipality: Jackson Township
Operator Name: MARKSMEN ENERGY USA INC
Well Pad ID:
Farm/Lease Name: STRITTMATTER
License Status: Producing
License Date: 2014-04-23
Spud Date: 2014-04-30
Spud Drilling Contractor: G & L DRILLING
Final Drill Date: 2014-05-06
Well Total Depth: 2550 ft
Configuration: Vertical
Latitude: 39.607634633
Longitude: -83.04600250

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-04-23 Proposed Formations:TRENTON-BLACK RIVER-TREMPEALEAU, Issued Date:4/23/2014, Expired Date:4/22/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-05-06
Completion Report Received 2014-07-10
Construction Permit Expires 2016-04-22
Change of Owner 2017-01-04 Operator changed from 6227, HOUGHTON INVESTMENTS LLC to 9491, MARKSMEN ENERGY USA INC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-07-11 2420 2426 19

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-13 ACID 15 1100 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 HOUGHTON INVESTMENTS LLC 0 3547 229
2015 HOUGHTON INVESTMENTS LLC 0 1999 229
2016 HOUGHTON INVESTMENTS LLC 0 1267 229
2017 MARKSMEN ENERGY USA INC 0 487 365
2018 MARKSMEN ENERGY USA INC 0 142 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 HOUGHTON INVESTMENTS LLC Brine 15726 229
2015 HOUGHTON INVESTMENTS LLC Brine 6856 229
2016 HOUGHTON INVESTMENTS LLC Brine 18 229
2017 MARKSMEN ENERGY USA INC Brine 33234 365
2018 MARKSMEN ENERGY USA INC Brine 38672 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0171141257 2014-12-04 Production Wells No Violations - On site for inspection, ID on tank, three 210 barrel tanks, two steel tanks and one fiberglass. One 100 barrel fiberglass tank in dike area. Dike area free of debris and water.

- Pump unit operation while on site. -

0235466344 2019-02-06 Production Wells No Violations My inspection revealed this well had legible and accurate identification. This satisfies the compliance notice.
1199741965 2017-12-07 Production Wells No Violations My inspection revealed the well is owned by Marksman Energy. The well consists of a pumping unit, 3-210 barrel tanks and 1-100 barrel tank. Legible identification was posted.
1398859560 2014-04-30 Drill / Deepen / Reopen No Violations - On site for progress update, G & L Drilling Rig 3 on site.

- Contacted by Bob Atha on 4/26/2014 that drilling equipment was being moved on location. Contacted on Monday the 28 the pits were being excavated, contacted on Tuesday the 29 by Lee Atha that they had plan to start drilling late that night. - Wednesday the 30 on location, no drilling has started, mud pump has been broke, repairs have been made will start mixing mud and spud in about 3 hours. - New 9 ? inch 17Lbs and 7 inch 27Lbs on location. - Operator is keeping the road clean of mud. -

1398944284 2014-05-01 Drill / Deepen / Reopen No Violations - On site for drilling progress, Drilling Rig broken down rotary head locked up. Head has been removed for repairs. Driller plans to have head repaired and install late tonight or early morning.

- Hole depth at time of inspection 64 feet. - Continuing to keep road free of debris.

1399177377 2014-05-03 Drill / Deepen / Reopen No Violations - On site for surface casing cement. Formation Cementing Inc, cement contractor.

- Spud date 4/30/2014 - - 721 feet of 7 inch surface casing set 5/3/2014 hole diameter 8? hole depth 750 feet. - 130 sacks of class cement used - Good circulation, wiper plug used, 3 centralizer used.

1401806524 2014-06-03 Preliminary Restoration No Violations - On site for preliminary restoration inspection.

- All pits have been filled and graded - Lease road to tank battery and pump unit construct and cover with crushed aggregate. - Well was put into production 5/8/2014 - Pump unit operating while on site. - Two steel 210 barrel and one fiberglass 100 barrel tanks contained in dike area. - ID on tank - Water line trenched to UIC well 34-129-2-0105 - Weather condition Cloudy Temp 77 Damp to Wet ground conditions

1408375142 2014-08-18 Production Wells No Violations - On site for inspection, ID on Tank three 210 barrel steel tanks and one 100 barrel fiberglass tank in dike area. Dike area free of debris and water.

- Pump unit operation while on site. -

1545659396 2018-12-24 Production Wells No Violations My inspection revealed this well consisted of a pumping unit. The casing valves and the tubing valves were in the open position. The well was in operation during my inspection. The tank battery consisted of 3-210 barrel tanks and 1-100 barrel tank. The well lacked a legible identification. The owner of the well shall place a legible identification at the wellhead or the tank battery.
2051780960 2018-02-06 Production Wells No Violations My inspection revealed the well was in production during my inspection. The well consists of a pumping unit, 3-210 barrel tanks and 1-100 barrel tank. Legible identification was posted.

For data sources see[9]

References