If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-129-20239 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.607634633,"lon":-83.0460025,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Pickaway | |
Municipality: Jackson Township | |
Operator Name: MARKSMEN ENERGY USA INC | |
Well Pad ID: | |
Farm/Lease Name: STRITTMATTER | |
License Status: Producing | |
License Date: 2014-04-23 | |
Spud Date: 2014-04-30 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2014-05-06 | |
Well Total Depth: 2550 ft | |
Configuration: Vertical | |
Latitude: 39.607634633 | |
Longitude: -83.04600250 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-23 | Proposed Formations:TRENTON-BLACK RIVER-TREMPEALEAU, Issued Date:4/23/2014, Expired Date:4/22/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-05-06 | |
Completion Report Received | 2014-07-10 | |
Construction Permit Expires | 2016-04-22 | |
Change of Owner | 2017-01-04 | Operator changed from 6227, HOUGHTON INVESTMENTS LLC to 9491, MARKSMEN ENERGY USA INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-07-11 | 2420 | 2426 | 19 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-13 | ACID | 15 | 1100 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HOUGHTON INVESTMENTS LLC | 0 | 3547 | 229 |
2015 | HOUGHTON INVESTMENTS LLC | 0 | 1999 | 229 |
2016 | HOUGHTON INVESTMENTS LLC | 0 | 1267 | 229 |
2017 | MARKSMEN ENERGY USA INC | 0 | 487 | 365 |
2018 | MARKSMEN ENERGY USA INC | 0 | 142 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HOUGHTON INVESTMENTS LLC | Brine | 15726 | 229 |
2015 | HOUGHTON INVESTMENTS LLC | Brine | 6856 | 229 |
2016 | HOUGHTON INVESTMENTS LLC | Brine | 18 | 229 |
2017 | MARKSMEN ENERGY USA INC | Brine | 33234 | 365 |
2018 | MARKSMEN ENERGY USA INC | Brine | 38672 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0171141257 | 2014-12-04 | Production Wells | No Violations | - On site for inspection, ID on tank, three 210 barrel tanks, two steel tanks and one fiberglass. One 100 barrel fiberglass tank in dike area. Dike area free of debris and water.
- Pump unit operation while on site. - |
0235466344 | 2019-02-06 | Production Wells | No Violations | My inspection revealed this well had legible and accurate identification. This satisfies the compliance notice. |
1199741965 | 2017-12-07 | Production Wells | No Violations | My inspection revealed the well is owned by Marksman Energy. The well consists of a pumping unit, 3-210 barrel tanks and 1-100 barrel tank. Legible identification was posted. |
1398859560 | 2014-04-30 | Drill / Deepen / Reopen | No Violations | - On site for progress update, G & L Drilling Rig 3 on site.
- Contacted by Bob Atha on 4/26/2014 that drilling equipment was being moved on location. Contacted on Monday the 28 the pits were being excavated, contacted on Tuesday the 29 by Lee Atha that they had plan to start drilling late that night. - Wednesday the 30 on location, no drilling has started, mud pump has been broke, repairs have been made will start mixing mud and spud in about 3 hours. - New 9 ? inch 17Lbs and 7 inch 27Lbs on location. - Operator is keeping the road clean of mud. - |
1398944284 | 2014-05-01 | Drill / Deepen / Reopen | No Violations | - On site for drilling progress, Drilling Rig broken down rotary head locked up. Head has been removed for repairs. Driller plans to have head repaired and install late tonight or early morning.
- Hole depth at time of inspection 64 feet. - Continuing to keep road free of debris. |
1399177377 | 2014-05-03 | Drill / Deepen / Reopen | No Violations | - On site for surface casing cement. Formation Cementing Inc, cement contractor.
- Spud date 4/30/2014 - - 721 feet of 7 inch surface casing set 5/3/2014 hole diameter 8? hole depth 750 feet. - 130 sacks of class cement used - Good circulation, wiper plug used, 3 centralizer used. |
1401806524 | 2014-06-03 | Preliminary Restoration | No Violations | - On site for preliminary restoration inspection.
- All pits have been filled and graded - Lease road to tank battery and pump unit construct and cover with crushed aggregate. - Well was put into production 5/8/2014 - Pump unit operating while on site. - Two steel 210 barrel and one fiberglass 100 barrel tanks contained in dike area. - ID on tank - Water line trenched to UIC well 34-129-2-0105 - Weather condition Cloudy Temp 77 Damp to Wet ground conditions |
1408375142 | 2014-08-18 | Production Wells | No Violations | - On site for inspection, ID on Tank three 210 barrel steel tanks and one 100 barrel fiberglass tank in dike area. Dike area free of debris and water.
- Pump unit operation while on site. - |
1545659396 | 2018-12-24 | Production Wells | No Violations | My inspection revealed this well consisted of a pumping unit. The casing valves and the tubing valves were in the open position. The well was in operation during my inspection. The tank battery consisted of 3-210 barrel tanks and 1-100 barrel tank. The well lacked a legible identification. The owner of the well shall place a legible identification at the wellhead or the tank battery. |
2051780960 | 2018-02-06 | Production Wells | No Violations | My inspection revealed the well was in production during my inspection. The well consists of a pumping unit, 3-210 barrel tanks and 1-100 barrel tank. Legible identification was posted. |
For data sources see[9]