Well Details

Well ID: 34-013-21150
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001476
Farm/Lease Name: BOROVICH W RCH BL
License Status: Producing
License Date: 2017-06-14
Spud Date: 2017-05-30
Spud Drilling Contractor: PI0NEER DRLG
Final Drill Date: 2017-07-19
Well Total Depth: 21650 ft
Configuration: Horizontal
Latitude: 40.015065097
Longitude: -80.89077003

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-21 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/21/2016, Expired Date:12/21/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-06-14 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:6/14/2017, Expired Date:6/14/2019 12:00:00 PM, Drilling unit acres:564.243, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-07-19
Completion Report Received 2017-12-14
Record Last Modified 2017-12-19
Construction Permit Expires 2018-06-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-12-18 9934 10075 30
2017-12-18 21369 21474 18

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/25/2017 10/24/2017 9647 19,318,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator Base Fluid Water 7732-18-5 100 86.6049 160,924,000.0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
MC S-2510T Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 83 0.0701305 130314
Hydrochloric Acid Halliburton Solvent Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
WG-36 GELLING AGENT Halliburton Gelling Agent Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
Formaldehyde 50-00-0 0.09 0.00001349 26
Inorganic salt Proprietary 30 0.018526 34424
Sodium chloride 7647-14-5 5 0.000749354 1393
Phosphonate of a Diamine, Sodium Salt Proprietary 30 0.00449613 8355
Sodium persulfate 7775-27-1 100 0.00001076 20
Methanol 67-56-1 60 0.00496794 9233
Fatty acids, tall oil Proprietary 30 0.000221327 412
Propargyl alcohol 107-19-7 10 0.00007378 138
Ethoxylated alcohols Proprietary 30 0.000221327 412
Acetic acid 64-19-7 60 0.00267045 4963
Hydrotreated light petroleum distillate 64742-47-8 30 0.018526 34424
Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide 68527-49-1 30 0.000221327 412
Neutralized Polyacrylic Emulsion Proprietary 10 0.000633402 1177
Acrylamide acrylate copolymer Proprietary 30 0.018526 34424
Ethylene Glycol 107-21-1 60 0.00380041 7062
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl chlorides 68424-85-1 5 0.00104148 1936
Ethanol 64-17-5 1 0.000208296 388
Acetic anhydride 108-24-7 100 0.00445074 8271
Guar gum 9000-30-0 100 0.000610827 1135
Phosphoric acid 7664-38-2 0.1 0.00002083 39
Crystalline silica, quartz 14808-60-7 100 12.441 23,117,000.0
Olefins Proprietary 5 0.00008853 166
Hydrochloric acid 7647-01-0 15 0.06456 119691
Glutaraldehyde 111-30-8 30 0.00624886 11612
Sodium sulfate 7757-82-6 0.1 0.00000001 1
LP-50 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-24 H2O 8 7551 Bbl 390655 Halliburton STAGE 66/66

STAGES 2-65 SEE IMAGES

2017-09-25 H2O 7 6911 Bbl 351055 Halliburton STAGE 1/66

STAGES 2-65 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC 915098 0 33
2018 ASCENT RESOURCES UTICA LLC 9327809 0 365
2019 ASCENT RESOURCES UTICA LLC 927667 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC Brine 11566 33
2018 ASCENT RESOURCES UTICA LLC Brine 36322 365
2019 ASCENT RESOURCES UTICA LLC Brine 4390 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0080268636 2017-06-14 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1765 feet. Previous casing set and cemented was 18.625 inch diameter mine string to a depth of 360 feet. Wyoming casing ran 1758 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Casing was centralized with 14 centralizers. Shoe track is 44 feet long. O-tex was onsite with 1470 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 257 barrels of fresh water. 35 barrels of gel pumped ahead of cement and 10 barrel of fresh water between gel and cement. 70 barrels of cement returned to surface, and floats held with 1.5 barrels back. Mix water has pH of 7 and 46 ppm chlorides.
0865279395 2018-11-27 UrbanProduction Wells No Violations Status check inspection found (3) wells present on the well pad 2 are in production one does not have the drilling process complete. The said well is producing off the 5.5 diameter production casing through 2 primary 7.0625 diameter master valves. The 5.5 casing pressure is 1,200 pounds per square inch (PSI). There lower well head assembly consists of a lower A section and upper B section, attached to the A&B section outlet ports is 2 riser pipes equipped with valves and gauges for the purpose of annular pressure monitoring. The A section riser pipe gauge reads 350 pounds pressure, this is the pressure on the internal of the 13.375diameter casing string. The B section riser pipe gauge reads 1,500 pounds pressure, this is the internal pressure on the 9.625 diameter casing string. The well head production tree consists of 2 flow lines both of which are equipped with (2) emergency shut down hydraulic valves and electronic choke valves. Each flow line has a vertical separator and one gas processing unit per well. Also present is a glycol heater. There are (2) 500 barrel production tanks present on location, the tanks are situated inside a polymer lined steel containment dike area. The well pad perimeter is protected by an earthen berm that is equipped with an 8 chain link fence. The well pad entrance does have a gate that is equipped with a combination lock.
1496678113 2017-05-31 Casing String Witnessed No Violations On the day of my inspection I witnessed precision rat hole had augured a 36 inch diameter hole to 94 feet. 96 feet of 30 inch diameter conductor casing was ran. O-tex was onsite with 310 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.20. 50 percent excess ran. No returns to surface. Cement came within 20 feet of surface and then fell back down hole. I left location and returned to this pad for top of job on the same evening. The 1H well took the cement that was supposed to go into this well and no cement was pumped into this hole on the evening on 5/31/17. On the morning on 6/1/17, after returning to location for third time, 307 sacks of class H (2%CaCl, 3% gypsum, 15.6 ppm 1.2 yield) cement were pumped down the back side with no returns to surface. I again left location and returned the afternoon of 6/1/17 to witness the pumping of 200 sacks of class H cement down the backside. No returns to surface. These class H blends are referred to as Henderson blend in the OTEX paperwork. Inspector Randy Akins returned to location on 6/2/17 to watch the pumping of an additional 240 sacks of class H with gypsum. Otex paperwork refers to this blend as Dan Ryen and it has a weight of 14.2 ppg and yield of 1.67. 1057 total sacks of cement pumped over 5 separate inspections. Well was spudded on 5/30/2017.
1497297025 2017-06-12 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 24 inch diameter open hole to a depth of 367 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 96 feet. Wyoming Casing ran 361 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot. Shoe track is 24.87 feet long. Cement Baskets were set at 294 feet. O-tex is onsite with 750 sacks of Class A cement with a yield of 1.2. 70% excess ran in open hole. Cement displaced with 103 barrels of fresh water. 30 barrels of gel pumped ahead of cement. Cement weighed 15.6 ppg on pressurized mudscale, truck read 15.9 ppg. 40 barrels of cement returned to surface, and floats held with .5 barrels back. Mix water has pH of 7, 46 ppm chlorides, and 73 degrees Fahrenheit. Coal was encountered at 315-325 feet. All depths, except conductor, are from kelly bushing which is 12 feet above ground level.
2019425800 2018-08-16 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a 4-string casing design with 5.5-inch diameter production casing that appeared to be open flowing. Annular pressure monitoring was in place, the 9.625-inch diameter intermediate casing gauge read 1125 pounds per square inch, the 13.375-inch diameter surface casing gauge read 285 pounds per square inch. Production equipment included a 2 Sand Traps, a line heater, and gas processing unit. There are two 500-barrel production fluid tanks shared with the other well on the pad. There were multiple Emergency Shut Down devices on location, Identification tags were present, and production was up to date. No violations were found at the time of my inspection.

For data sources see[10]