Well ID: 34-059-24409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.084670806,"lon":-81.26501271,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001087 | |
Farm/Lease Name: ABE TROYER | |
License Status: Producing | |
License Date: 2014-08-08 | |
Spud Date: 2014-09-26 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-11-28 | |
Well Total Depth: 14344 ft | |
Configuration: Horizontal | |
Latitude: <Latitude> | |
Longitude: -81.26501271 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-08 | Proposed Formations:POINT PLEASANT, Issued Date:8/8/2014, Expired Date:8/7/2016 12:00:00 PM, Drilling unit acres:698.607, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-11-28 | |
Construction Permit Expires | 2016-08-07 | |
Completion Report Received | 2017-05-23 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-05-30 | 7924 | 7993 | 36 |
2017-05-30 | 14033 | 14204 | 48 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/05/2016 | 10/15/2016 | 7898 | 14,729,600.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide | 68527-49-1 | 30 | 0.000139954 | 192 | |||
Ethylene oxide | 75-21-8 | 0.01 | 0.00000073 | 1 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0384757 | 52784 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000161822 | 222 | ||||
Acetic acid | 64-19-7 | 60 | 0.00134924 | 1851 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00224728 | 3083 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000139954 | 192 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00002697 | 37 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00004665 | 64 | ||||
Olefins | Proprietary | 5 | 0.00005686 | 78 | ||||
Methanol | 67-56-1 | 60 | 0.000279179 | 383 | ||||
Glycerine | 56-81-5 | 5 | 0.00002697 | 37 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000139954 | 192 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.3028 | 14,134,200.0 | ||||
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.257042 | 352630 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 89.4374 | 122,697,000.0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1225-15 | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-10-05 | H2O | 15 | 365172 Gal | 363870 | Halliburton | STAGE 1/42
STAGES 2-41 SEE IMAGES |
2016-10-15 | H2O | 15 | 923950 Gal | 313580 | Halliburton | STAGE 42/42
STAGES 2-41 SEE IMAGES |
2016-10-14 | H2O | 0 | 271352 Gal | 249260 | Halliburton | 36 total perforations from 8893 feet to 8791 feet |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 899103 | 119481 | 347 |
2018 | ECLIPSE RESOURCES I LP | 484346 | 25917 | 362 |
2019 | ECLIPSE RESOURCES I LP | 79305 | 3198 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 21774 | 347 |
2018 | ECLIPSE RESOURCES I LP | Brine | 8229 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1246 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0282888398 | 2015-04-09 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
0298964525 | 2016-10-11 | Completion Testing | No Violations | On the day of my inspection I witnessed Nine Wireline trip in the wellbore and perforate the casing with 32 shots from 11293 feet to 11191 feet in preparation for Halliburton to frac stage 20 of 46. Due to the lack of water Eclipse is stack fracing the pad at this time. |
0481823764 | 2018-07-10 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one flare. Identification was located on the well. |
0496772645 | 2014-11-14 | Casing String Witnessed | No Violations | When I arrived onsite for the surface casing cement job the rig crew was still running the casing. Once the pipe was set Halliburton used 1325sks of HALCEM SYSTEM CEMENT. We had 30bbls of cement returns to the surface during the job. |
0587144844 | 2019-04-25 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well. Upon entering the access road, a slip was noticed developing on the left side of the access road at the point of entry and an additional slip had developed on the stack pile. I made ODNR Engineer Mark Atkinson aware of my findings. |
0946201034 | 2018-10-04 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well. |
1191163300 | 2016-10-14 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton Services frac stage 36 of 42 with a breakdown pressure of 7027 pounds per square inch, an average treating pressure of 8277 pounds per square inch, an average rate of 82.1 barrels per minute and a total of 249260 pounds of proppant pumped. I completed walk around with Consultant Dustin Moore revealing proper secondary containment was in place. |
1356295963 | 2016-11-10 | Completion Testing | No Violations | On the day of my inspection I witnessed the drill out operations were completed as Deep Well Services Rig #4 was rigging down preparing to move off location. I completed walk around with Consultant Cristo Giannareas revealing that secondary containment was being repaired and replaced by Grady Rentals along with cleaning of location. Halliburton Services are scheduled to move back in to complete the frac operations of the 8H and 10H next week. |
1367184962 | 2017-01-10 | Completion Testing | No Violations | The well was equipped with a plunger lift system with valves in the closed position with annular pressure monitoring in place. Tetra Technologies was onsite setting flowback equipment with flowback to begin on Friday. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H. I met with Consultant Cristo Giannareas and completed walk around revealing installation of production equipment was on going. |
1406214526 | 2019-05-20 | Production Wells | No Violations | The purpose of my inspection was a status check. On 4/25/2019 inspection found two slips have developed along the access road and on the topsoil stockpile. I contacted ODNR horizontal well pad Engineer Mark Atkinson and made him aware of the problem areas. During my inspection today the slips remain but have not increased in severability. The current slips will not effect pad stability and performance. |
1566725484 | 2017-02-07 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 3100 pounds per square inch on the casing and 2940 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H. |
1605700428 | 2017-06-06 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1825 pounds per square inch on the casing and 2090 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H. |
1863946706 | 2017-09-11 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1320 pounds per square inch on the casing and 1015 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H. |
For data sources see[10]