X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-117-24137

Well Details

Well ID: 34-117-24137
Loading map...
Country: United States
State: Ohio
County: Morrow
Municipality: Congress Township
Operator Name: WOODCOCK III GEORGE W DBA WEST
Well Pad ID:
Farm/Lease Name: LOGAN
License Status: Active Injection
License Date: 2003-10-17
Spud Date: 1996-09-03
Spud Drilling Contractor: OHIO ENERGY ASSETS
Final Drill Date: 1996-09-08
Well Total Depth: 3705 ft
Configuration: Vertical
Latitude: 40.586922688
Longitude: -82.76761532

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1996-08-07 Issued Date 8/7/96 Expired Date 8/7/97 Acres 0020000 Tool Type RTA Proposed Formation TREMPEALEAU Proposed Depth 03705 Proposed Drill Depth 03705
Original Spud 1996-09-03 LOG TYPE=FORMATION EVALUATION LOG
Completed 1996-09-08 LOG TYPE=FORMATION EVALUATION LOG
Reached Total Depth 1996-09-08 LOG TYPE=FORMATION EVALUATION LOG
Completion Report Received 1996-09-17 LOG TYPE=FORMATION EVALUATION LOG
CO 1996-09-18 3069 MURNANE JOSEPH M GeoDate 8/7/96
APP 2003-10-17 Proposed Formations:TREMPEALEAU, Issued Date:10/17/2003, Expired Date:10/16/2004 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:EOR, Proposed Well Class:ERP
Construction Permit Expires 2004-10-16 LOG TYPE=FORMATION EVALUATION LOG
Change of Owner 2005-12-13 Operator changed from 3069, COLUMBUS OILFIELD EXPL. CO. to 7966, WARPATH ENERGY INC
Change of Owner 2008-03-18 Operator changed from 7966, WARPATH ENERGY INC to 4260, CORTLAND ENERGY CO INC
Last Compliance Report 2013-01-10 LOG TYPE=FORMATION EVALUATION LOG
Change of Owner 2014-04-04 Operator changed from 4260, CORTLAND ENERGY CO INC to 9247, WOODCOCK III GEORGE W
Record Last Modified 2017-02-15 LOG TYPE=FORMATION EVALUATION LOG

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3629 0
2006-09-11 3630 3642 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 2500 Gal 0 TREATED W/2500 GAL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1996 COLUMBUS OILFIELD EXPL. CO. 949 364 61
1997 COLUMBUS OILFIELD EXPL. CO. 2596 1091 314
1998 COLUMBUS OILFIELD EXPL. CO. 1008 970 200
1999 COLUMBUS OILFIELD EXPL. CO. 0 304 336
2000 COLUMBUS OILFIELD EXPL. CO. 0 51 220
2001 COLUMBUS OILFIELD EXPL. CO. 0 0 0
2008 CORTLAND ENERGY CO INC 0 0 24

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1996 COLUMBUS OILFIELD EXPL. CO. Brine 397 61
1997 COLUMBUS OILFIELD EXPL. CO. Brine 3145 314
1998 COLUMBUS OILFIELD EXPL. CO. Brine 245 200
1999 COLUMBUS OILFIELD EXPL. CO. Brine 0 336
2000 COLUMBUS OILFIELD EXPL. CO. Brine 0 220
2001 COLUMBUS OILFIELD EXPL. CO. Brine 0 0
2008 CORTLAND ENERGY CO INC Brine 877 24

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0009966979 2014-07-21 Surface Facility Construction No Violations Inspect well location. Concrete unloading pad has been poured and is in place. Drain vault is in place and has been buried. Three fiberglass tanks have been set and piping has been installed.
0012246566 2016-03-17 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. REPORTS RECEIVED
0075775385 2008-09-03 Enhanced Recovery Project No Violations Chk well and storage, No identification posted. Has positive pressure on annulus but not enough to measure.
0092761941 2018-05-07 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0096023023 2013-09-30 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Check well, storage and identification. No change in status from previous inspection: the identification and emergency contact information is not posted and the dike needs emptied of excess water. Status: contacted operator . Will continue to monitor.
00CENT2172 1997-10-20 Production Wells Violations Noted 1501:9-1-07
00CENT2174 1997-10-20 Production Wells Violations Noted 1501:9-9-05
0134831530 2014-04-02 Enhanced Recovery Project No Violations Change of operator noted with new well identification and emergency contact information posted to West Drilling (Mr. George W. Woodcock) (618) 262-3788.
0167240608 2014-01-17 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Check well, pressures, storage and identification. The operator has added the identification and emergency contact information to the storage. The storage dike is currently ice covered.
0182309009 2016-08-02 Enhanced Recovery Project No Violations Contacted by Gary VanDike representing the operator to report the well was to be shut in for an undetermined duration of time or untill the well was sold.
0191892232 2010-09-22 Enhanced Recovery Project No Violations Check well and storage, tank appears to have run over at some time. Need to post Id.
0209008957 2012-10-25 Enhanced Recovery Project No Violations Inspected the Logan #1 (#4137) (ERP #12) as part of a standard injection well status check. Injection: zero Annulus: 350 psi. Replacement of the dike liner has not occurred.
0226402083 2015-08-07 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0240384081 2013-05-23 Enhanced Recovery Project No Violations Inspect enhanced recovery well, storage and identification. Status: identification needs posted at storage and well, contacted operator.
0253493051 2010-03-29 Enhanced Recovery Project No Violations Chk well and storage, ok.
0277846138 2006-09-29 Enhanced Recovery Project Violations Noted Chk well and storage, diked area has fluid in it and needs to be empied. No identification, no quarter inch tap for annualr space.
0278740206 2015-11-09 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0281524073 2017-12-13 Salt Water Injection Well No Violations Inspect surface storage facility.
0292912549 2017-10-11 Salt Water Injection Well No Violations Injection well status check. Status: ok.
0327688528 2016-07-26 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Well tubing was on vacuum during inspection.
0341828692 2017-05-15 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017. Reports received 6/12/2017.
0370136286 2014-01-23 Enhanced Recovery Project No Violations Location Information. ENTRANCE: Lat. 40.59207 Long. -82.76642 / WELL HEAD: Lat. 40.52150 Long. -82.81357 / CENTER-OF-STORAGE: Lat. 40.58797 Long. -82.76673.
0380187884 2012-06-21 Enhanced Recovery Project No Violations Preformed a follow up inspection on the Logan (ERP #12) regarding the pit liner as requested by Inspector Tom Benko. Cortland has repaired the liner by relining as an overlay three sides of the dike. The liner has been folder over to create double thickness. The sides relined are the south/west/north sides. The outer edges of the liner are secured by boards and fine limestone. 55% of the new liner is exposed to the elements on the dike walls. The liner is holding fresh rain water as seen by pooling around the tank. Pictures of the liner where sent to Inspector Benko 6/28/2012.
0383014237 2008-03-06 Enhanced Recovery Project No Violations Wwell head is ice covered. Dyke is full of fluid and forzen.
0406070744 2014-07-24 Enhanced Recovery Project No Violations Inspector Eric Daugstrup and myself witnessed an injection line test for Tom Benko. Test passed with no loss. We met new well owner George Woodcock. See Erics report for this date on details.
0426658598 2010-05-10 Enhanced Recovery Project No Violations Chk well and storage ok.
0456216630 2009-06-24 Enhanced Recovery Project No Violations Ok except that I could not open the valves on the annulus. Need bigger wrench. No fluid in the diked area at this time.
0464733866 2007-05-16 Enhanced Recovery Project No Violations No quarter inch tap on annulus.
0481640901 2007-10-31 Enhanced Recovery Project No Violations Chk well and storage, Ok.
0493487045 2017-01-25 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0603394488 2013-11-18 Enhanced Recovery Project No Violations Inspected the Logan #1 (ERP #12) as part of a standard injection well status check. Check well, pressures, storage and identification. Status: No change in status from previous inspection, contacted operator.
0625176249 2016-10-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0641714269 2014-07-16 Surface Facility Construction No Violations On-site with UIC inspector Tom Benko as the operator modifies the storage facility according to the approved plan (6/27/2014). Three all fiberglass tanks (210 barrels) have been added as well as a new concrete, fully lined vault.
0652221388 2006-02-23 Enhanced Recovery Project No Violations Chk well and storage, Ok.
0692892257 2008-12-11 Enhanced Recovery Project No Violations Chk well and storage, Ok.
0792757478 2018-10-11 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The pump was in operation during the inspection.
0822026639 2015-07-17 Production Wells No Violations Check dike water for chloride content: 1813 ppm.
0832747139 2017-08-02 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0860449212 2013-02-14 Enhanced Recovery Project No Violations Cortland is preparing to put the well back into injection. Pressure testing of the flow line is schedule for 2/19/2013.
0880782253 2005-12-14 Enhanced Recovery Project No Violations Chk well and storage,ok.
0891107211 2014-10-03 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, storage and identification. Status: ok.
0909557677 2012-08-30 Administrative Inspection No Violations Contacted operator by phone to report that the temporary fixes for the liner were not adequate and that the liner would need to be replaced.
0962903515 2011-05-09 Enhanced Recovery Project No Violations Need to repair the liner in the diked area it has some holes in it close to the top of the dike. Also need to post identification.

2:00pm called and talked to Bob Masters and told him of the problems. He told me that he would get the liner repaired or replaced and post the identification.

0970721939 2012-02-23 Salt Water Injection Well No Violations Inspect Well.
0981880016 2015-07-01 Salt Water Injection Well No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
0983763390 2018-08-24 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1036523338 2002-11-05 Production Wells No Violations Service rig removed. Well still has tubing and rods in it. Not capable of production or injection. Operator in past has proposed to convert this well to an injection well.
1040701911 2014-10-10 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The Operators Injection gauge indicates -30 in-Hg.
1044992223 2015-08-11 Salt Water Injection Well No Violations Inspect well and tanks. Collect brine sample TSB083 from well head for chemical analysis.
1073923234 2004-01-12 Enhanced Recovery Project No Violations Well was to be converted to an injection well. Tubing and rods still in well . Valves closed. No activity.

One digital photo. Need to pursue further enforcement action.

1074311875 2014-07-08 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
1095082378 2004-09-13 Enhanced Recovery Project No Violations On site for mechanical integrity test. Ran a new Parmaco HW packer to 3640 pressured up on the annulus would not hold. Shut down for the day.
1100875720 2004-11-19 Enhanced Recovery Project No Violations Liner put down, and storage tank set. Using well at this time.
1104262170 2004-12-28 Enhanced Recovery Project No Violations Chk well and storage, Ok. Site is snow covered. Shut down.
1105689791 2017-10-25 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1106463957 2013-02-20 Enhanced Recovery Project No Violations Enhanced recovery well status check: Identification posted, well site clean and storage ok.
1121824979 2015-01-14 Salt Water Injection Well No Violations With Inspector Eric Daugstrup. See Erics report for details on this date.
1168008662 2007-01-05 Enhanced Recovery Project No Violations Warpath Energy Inc has done nothing to address the violations. No identification posted, no quarter inch tap on the annulus and the diked area is full of fluid at this time.
1210i55555 2002-01-31 Production Wells No Violations Service rig over hole. Part of rods were out. Well is not capable of production.Need to continue with injection well permit . Submit public notice or within 30 days P&A.
1226153129 2014-07-24 Brine Hauler No Violations Inspect Mullins Energy Services brine truck on-site for pressure test. Ohio license number PHW-8499. Brine, UIC number and other identification clearly and properly displayed. Status: ok.
1253075010 2013-02-19 Surface Facility Construction No Violations Conduct line pressure test with air. Pressue line up to 25 psi; the pressure held for 15 minutes. The operaor was given authorization to utilize the well for brine disposal.
1255023396 2009-10-08 Enhanced Recovery Project No Violations Chk well and storage, Ok. No fluid in diked area at this time.
1261058906 2009-12-17 Enhanced Recovery Project No Violations Check well and storage, Id posted at the storage site.
1266305957 2005-10-06 Enhanced Recovery Project No Violations No quarter inch tap on annulus, can not chk annulus pressure.
1280759002 2010-08-02 Enhanced Recovery Project No Violations Check well and storage, Ok.
1294079650 2011-01-03 Enhanced Recovery Project No Violations Can not open valve on annulus. Tank has run over at some point and has a small amount of oil in the diked area.
1295738592 2016-04-12 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The injection tubing has -23 inches of mercury on the operators gauge.
1297266610 2011-02-09 Enhanced Recovery Project No Violations Check well and storage. Could not open valve on annulus due to the cold weather the valve is frozen. Approx temp 12 degrees F. Need to post new Id.
1313905919 2007-09-27 Enhanced Recovery Project No Violations Follow up on NOV, Resolved 1/4 inch tap installed on annulus. Ok at this time.
1334258075 2009-02-23 Enhanced Recovery Project No Violations Chk well and storage, ok.
1345577223 2012-08-21 Enhanced Recovery Project No Violations Inspected the Logan (ERP #12) with Mr. Jeff Fry as part of a standard status check. Backside pressure 375 psi, injection on vacuum. Well identification is displayed at the storage. The dike contains one silver 210 barrel tank in a lined dike.
1354527777 2018-02-01 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1357759326 2013-01-09 Enhanced Recovery Project No Violations Operator began reconstruction of surface facility and removal of tank and old dike liner for replacement dike and liner. New dike area is anticipated to be 30 feet by 30 feet with 48 inch high dike. This construction design will be sufficient to hold two 210 bbl. Tanks. Construction activity included removal of pipe run, emptying tank, removal of tank from dike area, and removal ice and removal of water by vacuum truck. The old pit liner was tore by excavator and was subsequently removed. Construction activity conducted by Ken Pryor.
1359048681 2013-01-24 Enhanced Recovery Project No Violations The liner replacement has begun. The old liner and tank have been removed and the dike has been rebuilt. Currently waiting on weather to set the liner and tank.
1359484701 2013-01-29 Salt Water Injection Well No Violations On site with Inspector Jeff Fry to witness replacement of the dike liner.
1363129344 2014-03-17 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: unable to check pressures, pressure gauge malfunctioning.
1369711855 2014-07-28 Enhanced Recovery Project No Violations Inspect well and surface facility. The tanks have been placed. The unloading pad has been constructed and the drain is connected to a concrete lined vault. The lines have been pressure tested. Checked the annulus of the well and the pressure is 410 psi. The well is on a strong vacuum.
1376070267 2013-08-09 Enhanced Recovery Project No Violations Inspected the Logan #1 (#4137/ERP #12) as part of a standard injection well status check. Check well, storage and identification. No change in status from previous inspection, except the dike needs rain water pumped back into the storage. Status: Identification has not been posted (from last inspection 5-23-13), tested dike water: high chloride content contacted operator to evaluate. Will continue to monitor.
1376711230 2015-03-13 Enhanced Recovery Project No Violations Inspected the Logan #1 (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
1379860129 2013-02-19 Enhanced Recovery Project No Violations On-site for flow line mechanical integrity test. Passed: Well can be placed into injection. Inspector Benko has details and forms.
1399562755 2014-05-08 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage and identification.
1405686594 2014-07-17 Surface Facility Construction No Violations Inspect location. Operator has removed the steel 210 bbl tank and is replacing with three fiberglass tanks. Installed a concrete spray plastic lined vault.
1405699998 2017-04-11 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1405703361 2014-07-18 Surface Facility Construction No Violations On-site to witness construction of the concrete unload pad. Canaan Concrete built the forms (rebar reinforced) and Lexington Concrete poured the concrete. Built to plan specs with the addition of curbs parallel to the drain. Photo documented construction. Status: ok.
1406229478 2014-07-24 Enhanced Recovery Project No Violations On-site accompanied by Inspector Jeff Fry, as a request from the operator for a flow line pressure test. Pressure tested flow line at 110 pounds for 15 minutes with zero loss. Status: passed and the operator is cleared to reconvene operations.
1406635436 2014-07-09 Surface Facility Construction No Violations Inspect surface facility. The existing steel tank has been removed from the dike area in preparation of new tanks. Three 210 bbl fiberglass tanks were delivered to the site for installation. The manufacture is RPX Composites of Commodore, PA. The serial numbers are 200705-13571, 200706-13572, and 200707-13573.
1421415247 2015-01-14 Enhanced Recovery Project No Violations Inspected the Logan #1 (ERP #12) as part of a standard injection well status check, accompanied by Inspector Mr. Jeff Fry.
1460965208 2015-02-13 Salt Water Injection Well No Violations Inspect location. Identification is posted.
1474113756 2004-08-25 Production Wells No Violations Follow up on NOV. The well has not been plugged or converted to Enhanced Production.
1489307147 2012-10-03 Enhanced Recovery Project No Violations Replacement of the dike liner has not started as of 10/03/2012.
1612520205 2018-03-13 Enhanced Recovery Project No Violations Inspect surface facility.
1625203867 2011-10-11 Salt Water Injection Well No Violations Inspect well.
1678169762 2016-01-19 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. This report was resubmitted due to error in data entry of GPS coordinates.
1733307955 2014-09-11 Enhanced Recovery Project No Violations Inspect well.
1747299995 2014-07-18 Administrative Inspection No Violations Operator has a contractor scheduled to install and construct a new concrete unloading pad.
1807824025 2014-04-24 Enhanced Recovery Project No Violations Inspect well and tank battery. Location is ok.
1826057688 2012-09-10 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as a follow-up for Inspector Tom Benko. Cortland has verbally agreed to replace the entire dike liner. No work has started as of 9/10/2012.
1832569712 2007-01-10 Administrative Inspection No Violations Talked w/Bob Wells (Pumper) and told him he needs to install a quarter inch tap on the annular space so that I can monitor the pressuers on the well. Advised him that I have already issued an NOV to Warpath Energy and that the tap needs to be installed ASAP or I may need to take further leagal action.
1833371042 2003-07-07 Production Wells Violations Noted Follow up on notice issued by Jeff Fry. The well has not been plugged or converted to salt water injection as of this date. I would recommend issuing a Chiefs Order.
1844094257 2014-04-17 Enhanced Recovery Project No Violations Change of operator noted: George Woodcock dba West Drilling. New identification and emergency contact information has been posted.
1861112040 2018-05-04 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the 2017 Enhanced Recovery Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. Reports received 6/5/2018
1896740206 2013-02-14 Surface Facility Construction No Violations Inspect re-constructed dike area. Dike are measures 43 feet by 40 feet by 48 inches deep. One(1) new 210 bbl tank has been set on timbers. Identification is taped onto tank. Requested a line test to well head.
1924847737 2014-08-25 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #4137) as part of a standard injection well status check. Inspect well, pressures, storage and identification. The operator has added a storage shed. Status: ok.
1947276178 2014-07-24 Enhanced Recovery Project No Violations Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage, vault and identification. Status: ok.
1957961847 2012-05-23 Enhanced Recovery Project No Violations Inspect Well. Pit Liner has failed. Previous repair of line is substandard and inadequate. Fix and replace liner.
1959975824 2013-05-23 Preliminary Restoration No Violations The well has been converted to ERP. Preliminary restoration complete.
2028362201 2013-12-12 Enhanced Recovery Project No Violations Inspected the Logan (ERP #12) as part of a standard injection well status check. Check well, pressures, storage and identification. No change in status from previous inspection. The operator has not made corrective actions.
2059832166 2014-07-28 Brine Hauler No Violations Inspect Mullins Energy Services Truck #3 UIC 25-538. Collect Brine sample from truck at unloading pad. Brine source is 3411722340 The Hohl #1.
2086455480 2005-06-08 Enhanced Recovery Project No Violations Chk well and storage, Ok. Did not chk annulus no quarter inch tap.
2121696734 2012-12-05 Salt Water Injection Well No Violations Inspect well for integrity and pressure. There has been no change or reconstruction of dike area as discussed and agreed upon.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0012246566 US-OH-106049 2016-05-06 Failure to monitor pressures or volumes/failure to file
00CENT2172 US-OH-131523 Well operation causing pollution and contamination
00CENT2174 US-OH-131524 Failure to legibly identify well
0277846138 US-OH-122884 2006-09-29 Violation of injection tubing/fitting requirements
0277846138 US-OH-122885 2006-09-29 Insufficient/No identification
0341828692 US-OH-123575 2018-08-03 9-5-10E Failure to file enhanced recovery annual report
1833371042 US-OH-118296 2001-09-21 Failure to legibly identify well
1833371042 US-OH-118297 2001-09-21 Well shall be plugged
1861112040 US-OH-118635 2018-08-03 Failure to file enhanced recovery annual report

For data sources see[9]

References