X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23966

Well Details

Well ID: 34-133-23966
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Ravenna Township
Operator Name: RENT A HOME INC
Well Pad ID:
Farm/Lease Name: HUBBARD UNIT
License Status: Producing
License Date: 2008-10-03
Spud Date: 2008-12-10
Spud Drilling Contractor: H A D INC
Final Drill Date: 2008-12-14
Well Total Depth: 4507 ft
Configuration: Vertical
Latitude: 41.154123728
Longitude: -81.21836355

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1993-06-15 3940 RENT-A-HOME INC GeoDate 6/15/93
Oil and Gas 1993-06-15 Issued Date 6/15/93 Expired Date 6/15/94 Acres 0041383 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth
APP 2008-10-03 Proposed Formations:CLINTON, Issued Date:10/3/2008, Expired Date:10/3/2009 6:00:00 AM, Drilling unit acres:46.663, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-12-14
Completion Report Received 2009-02-09
Construction Permit Expires 2009-10-03
Correction to Well 2010-10-29 UNIT SIZE INCREASED TO 46.663 ACRES.
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-03-25 4279 4372 29

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 20 59373 Gal 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 RENT A HOME INC 1781 272 365
2010 RENT A HOME INC 6827 537 365
2013 RENT A HOME INC 15000 222 365
2014 RENT A HOME INC 8783 314 365
2015 RENT A HOME INC 3957 40 365
2016 RENT A HOME INC 7613 100 365
2017 RENT A HOME INC 7827 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 RENT A HOME INC Brine 20 365
2010 RENT A HOME INC Brine 100 365
2013 RENT A HOME INC Brine 60 365
2014 RENT A HOME INC Brine 30 365
2015 RENT A HOME INC Brine 0 365
2016 RENT A HOME INC Brine 0 365
2017 RENT A HOME INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0126331941 2008-12-22 Drill / Deepen / Reopen No Violations One load of cement dust has been delivered and blown into the working pit. The dust will be transferred to the blow pit by the track hoe. I suggested that they leave the pits open over night to see how well they solidify before covering over.
0258367416 2009-02-24 Drill / Deepen / Reopen No Violations The well has been fraced and rods have been run. Preliminary restoration should be completed by late spring.
0322045758 2012-08-01 Production Wells No Violations FOLLOW UP TO NOV # 1342545908. This status check found that the site had been remediated to pass preliminary restoration. The wellhead and tank battery are fenced and locked and ID signs are are up on both. Charcoal filters are missing from the tank stacks and are not necessary at this location. The well is running on a plunger lift system with 220 psi on the tubing and 240 psi on the 4.5 casing. The tank battery consists of 1-210 barrel tank, 1-140 barrel tank, a 50 barrel poly tank, and a separator. There is a domestic hook up on the well with 15 psi. The equipment has been freshly painted. No violations.
0751575305 2009-12-22 Production Wells No Violations The required identification is posted and the security locks are in place, for partial compliance. The vapor control system required by HB278 is still missing and preliminary restoration is still due.
0919603140 2008-12-17 Drill / Deepen / Reopen No Violations HAD Drilling has moved off site. The pits are lined and in good condition but need to be fenced off completely. I called Bob Lindsey and told him to fence the pits immediately. He agreed. The pits are scheduled to be solidified later this week.
1031449125 2008-12-15 Drill / Deepen / Reopen No Violations HAD Drilling has completed the hole and is running 4-1/2 casing. The pits are lined and partially fenced. The fencing will be completed after the rig has moved off location.
1111669111 2009-12-01 Production Wells Violations Noted This status check inspection for preliminary restoration, which was due mid September found numerous violations. 1) failure to restore the land surface within 9 months, the affected area needs to be graded, seeded and mulched. 2) the required identification needs to be posted on either the wellhead or the tank battery. 3) the gates on the fences around the wellhead and the tank battery need to be locked and secured at all times. 4) the production system does not have the required filters and safety equipment. The well is in production and violations 2 through 4 need to be addressed immediately.
1254303874 2010-03-16 Production Wells No Violations The required ID has been posted and the fence was installed temporarily. A second production tank has since been installed and the fence has been partially removed. The well must be shut in until the fence is replaced. The required filtration and safety equipment has not been installed and the preliminary restoration is still a long way from being approved. Restoration will be completed as soon as the weather permits.
1342545908 2009-12-01 Production Wells No Violations FOLLOW UP TO NOV # 1111669111 This status check inspection for preliminary restoration, which was due mid September found numerous violations. 1) failure to restore the land surface within 9 months, the affected area needs to be graded, seeded and mulched. 2) the required identification needs to be posted on either the wellhead or the tank battery. 3) the gates on the fences around the wellhead and the tank battery need to be locked and secured at all times. 4) the production system does not have the required filters and safety equipment. The well is in production and violations 2 through 4 need to be addressed immediately.
1783018399 2009-03-17 Drill / Deepen / Reopen No Violations The well has been fraced and tubing run in the hole. The tank battery is in position but has not been hooked up nor has the Dominion tap been made. Preliminary restoration is not due until September 2009.
1896365163 2008-12-09 Drill / Deepen / Reopen No Violations HAD Drilling is starting to move on the location. Still need to dig pits but should spud the well tomorrow.
2004056716 2008-12-23 Drill / Deepen / Reopen No Violations The drilling pits have been covered over.
2005221168 2008-12-10 Drill / Deepen / Reopen No Violations HAD Drilling is rigging up and the pits are being dug. Should be ready to spud later today.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1111669111 US-OH-102796 2009-12-03 General Safety
1111669111 US-OH-102797 2009-12-03 Failure to legibly identify well
1111669111 US-OH-102798 2009-12-03 Failure to have required locks, bull plugs

For data sources see[9]

References