If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-21498 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.50605,"lon":-79.806203,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Penn Hills Township | |
Operator Name: BARON GROUP INC | |
Well Pad ID: | |
Farm/Lease Name: T E HAFFEY 1 | |
License Status: Active | |
Spud Date: 2001-12-11 | |
Permit Date: 2001-06-27 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.506050 | |
Longitude: -79.806203 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2001 | BARON GROUP INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2002 | BARON GROUP INC | 7,420.00 | 260 | 0.00 | 0 | 0.00 | 0 |
2003 | BARON GROUP INC | 9,157.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | BARON GROUP INC | 7,516.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2005 | BARON GROUP INC | 7,037.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | BARON GROUP INC | 6,599.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | BARON GROUP INC | 5,517.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | BARON GROUP INC | 5,325.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | BARON GROUP INC | 5,490.63 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | BARON GROUP INC | 4,122.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2011 | BARON GROUP INC | 5,299.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | BARON GROUP INC | 4,403.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | BARON GROUP INC | 3,932.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | BARON GROUP INC | 3,346.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | BARON GROUP INC | 3,035.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | BARON GROUP INC | 2,725.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | BARON GROUP INC | 2,800.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | BARON GROUP INC | 2,048.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2002 | BARON GROUP INC | Fracking Fluid | 460.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2002 | BARON GROUP INC | Brine | 710.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2011 | BARON GROUP INC | Produced Fluid (in Barrels) | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1050171 | Primary Facility | 2001-07-31 | Routine/Complete Inspection | No Violations Noted | Checked loc. for future access reference. Appears upgrade access is planned to/from Indiana Rd. Orchard-hayfield environ at slope stake. Stake seen. |
1073994 | Primary Facility | 2001-11-05 | Routine/Complete Inspection | No Violations Noted | Site awaits rig for drilling. Water barred access ok. Topsoil conserved. Gravel at egress, bench site stony & hard, excavated cutting pit downgrade of staked location. Environ: Old farmstead & apple orchard. |
1085577 | Primary Facility | 2001-12-12 | Routine/Complete Inspection | No Violations Noted | move in and rig up |
1260630 | Primary Facility | 2003-08-12 | Routine/Complete Inspection | No Violations Noted | Gated access, producing well, tanked at bench. Waterbars on access ditched to the side. Field mowed at bench. Locked gate. |
1912824 | Primary Facility | 2010-08-18 | Routine/Complete Inspection | No Violations Noted | On August 18th, 2010 I conducted a routine inspection of the above site. Drilling was completed 12/17/2001. The well was in production. A well tag was present. The access road was in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
For data sources see[6]