If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31118 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.743139,"lon":-79.646708,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 147130 | |
Farm/Lease Name: BIBLICAL LIFE INSTITUTE 1M | |
License Status: Active | |
Spud Date: 2013-03-18 | |
Permit Date: 2013-01-23 | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Latitude: 40.743139 | |
Longitude: -79.646708 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-21 | 2014-05-22 | 6830 | 170130 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCl Acid (12.5%-18.0%) | Nabors Completion and Production Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 16 | 0.029401 | 0 |
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Glycol Ethers | 111-46-6 | 40 | 0.000364 | 0 | |
Isopropyl Alcohol | 67-63-0 | 40 | 0.000364 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 40 | 0.000364 | 0 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 13 | 0.000118 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00009100 | 0 | ||||
Super TSC-LT | Nabors Completion and Production Services | Paraffin & Scale Additives | Propylene Glycol | 57-55-6 | 0 | 0 | 0 | |
2 Phosphonobutane 1,2,4 tricarboxlyic acid | 37971-36-1 | 0 | 0 | 0 | ||||
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Propylene glycol | 57-55-6 | 50 | 0.005352 | 0 | |
Anionic Copolymer | Proprietary | 50 | 0.005352 | 0 | ||||
KR-153SL | Nabors Completion and Production Services | Biocides | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.002389 | 0 | |
Polyethlyene-Glycol | 25322-68-3 | 50 | 0.005972 | 0 | ||||
Super 100 NE | Nabors Completion and Production Services | Surfactants & Foamers | Methyl Alcohol | 67-56-1 | 15 | 0.018881 | 0 | |
Isopropyl Alcohol | 67-63-0 | 40 | 0.050349 | 0 | ||||
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine |
68139-30-0 | 15 | 0.018881 | 0 | ||||
Glycol Ether | 111-76-2 | 5 | 0.006294 | 0 | ||||
Nitrogen per MSCF | Nabors Completion and Production Services | Nitrogen Materials | Nitrogen | 7727-37-9 | 100 | 28.6003 | 0 | |
Water | MDS Energy Development LLC | Water | Water | 7732-18-5 | 100 | 52.104 | 0 | |
Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 18.6801 | 0 | |
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | Proprietary | Proprietary | 50 | 0.00267246 | 0 | |
Anionic Polyacrylamide | 910644-97-2 | 40 | 0.0393014 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000801631 | 0 | ||||
Dioxane | 123-91-1 | 1 | 0.00000967 | 0 | ||||
Monoethanolamine | Proprietary | 0.99 | 0.00134107 | 0 | ||||
Water | 7732-18-5 | 48 | 0.00045347 | 0 | ||||
Proprietary | Proprietary | 2 | 0.00196539 | 0 | ||||
Water | 7732-18-5 | 40 | 0.0393014 | 0 | ||||
Propylene glycol | 57-55-6 | 15 | 0.0147378 | 0 | ||||
Proprietary | Proprietary | 1 | 0.00135504 | 0 | ||||
Polymer | Proprietary | 10 | 0.013545 | 0 | ||||
ammonium, (2-Hydroxyethyl)trimethyl-, chloride | 67-48-1 | 80 | 0.00055233 | 0 | ||||
Alkyl Phosphate Ether | Proprietary | 1 | 0.00135504 | 0 | ||||
Polymer | Proprietary | 1 | 0.00135504 | 0 | ||||
Solvent | Proprietary | 1 | 0.00135504 | 0 | ||||
Phosphoric Acid | 7664-38-2 | 0.99 | 0.00134107 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 13 | 0.000122501 | 0 | ||||
Water | 7732-18-5 | 50 | 0.0677271 | 0 | ||||
Water | 7732-18-5 | 80 | 0.00930042 | 0 | ||||
Ammonium salts | Proprietary | 30 | 0.040636 | 0 | ||||
Proprietary | Proprietary | 0.99 | 0.00134107 | 0 | ||||
HCL Acid (0%-7.5%) | Nabors Completion and Production Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7 | 0.011362 | 0 | |
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Propylene Glycol | 57-55-6 | 25 | 0.02398 | 0 | |
Hydrotreated light distillates, non-aromatic, BTEX free | 64742-47-8 | 30 | 0.028776 | 0 | ||||
Mineral Spirits | 8052-41-3 | 10 | 0.009592 | 0 | ||||
Ethoxylated Alcohols | 68551-12-2 | 4 | 0.003837 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | MDS ENERGY DEV LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY DEV LLC | 41,807.00 | 150 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 38,936.90 | 360 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 12,725.60 | 159 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 24,448.40 | 327 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 17,867.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 4,303.00 | 89 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | MDS ENERGY LTD | Produced Fluid (in Barrels) | 700.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2014 | MDS ENERGY DEV LLC | Fracing Fluid Waste (in Barrels) | 838.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | MDS ENERGY DEV LLC | Produced Fluid (in Barrels) | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | MDS ENERGY DEV LLC | Fracing Fluid Waste (in Barrels) | 126.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | MDS ENERGY DEV LLC | Fracing Fluid Waste (in Barrels) | 1,053.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2015 | Produced Fluid (in Barrels) | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2136274 | Primary Facility | 2013-02-05 | Routine/Complete Inspection | No Violations Noted | Site was snow covered at time of this pre-operational inspection. Institution of BMPs as outlined in the on-site E&S plan appear adequate to preclude accelerated erosion or off-site transport of sedimentation. All perimeter controls specified in the E&S plan appeared to be properly installed. No erosion or sedimentation issues were noted. |
2149814 | Primary Facility | 2013-03-19 | Drilling/Alteration | No Violations Noted | Moving in on location in preparation to spud in well at time of inspection. First Class Energy rig#11 RD20. Pit lined and freeboard maintained. |
2161285 | Primary Facility | 2013-04-24 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit had been regraded. |
2177158 | Primary Facility | 2013-06-21 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. |
2196973 | Primary Facility | 2013-08-19 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. |
2231746 | Primary Facility | 2013-12-23 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well was not equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2275683 | Primary Facility | 2014-05-30 | Routine/Complete Inspection | No Violations Noted | Well stimulation activities appeared to have been completed, well did not appear to be equipped for production. Seperator and brine tank apparatus located onsite. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. |
2302119 | Primary Facility | 2014-09-09 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly regraded and restored. Vegetation had begun to take hold and appeared to meet 70% uniform vegetative cover. |
2466911 | Primary Facility | 2016-03-21 | Routine/Complete Inspection | No Violations Noted | Well is tagged-in production. Well head casing-production set-equipment-2-100 bbl tanks look ok. |
2595533 | Primary Facility | 2017-05-17 | Routine/Complete Inspection | No Violations Noted | Well tagged-on-annulus shut. Well head casing-equipment-2 100 bbl fiberglass tanks look ok. |
2766365 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and 2 grounded 100 bbl fiberglass fluid collection tanks look ok. |
2821595 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok. |
For data sources see[7]