If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27842 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.140419,"lon":-80.045044,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153105 | |
Farm/Lease Name: LOHR 4H | |
License Status: Active | |
Spud Date: 2016-04-18 | |
Permit Date: 2016-01-28 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.140419 | |
Longitude: -80.045044 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,779,405.92 | 222 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 3,136,964.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 531,706.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 240.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 39.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 502.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 472.74 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials (in Tons) RWC 806 | 5.21 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 77.45 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 91.63 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 396.20 Tons | LANDFILL | 100620 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 38.33 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Servicing Fluid (in Tons) RWC 808 | 0.43 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 191.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 155.30 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 16.02 Tons | LANDFILL | CID # 28726 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 44.67 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 1,579.46 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 40.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 431.83 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 64.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Tons) RWC 802 | 62.06 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 137.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 151.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Tons) RWC 899 | 1.39 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 973.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Tons) RWC 802 | 2.85 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials (in Tons) RWC 806 | 7.02 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 7,004.61 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge (in Tons) RWC 804 | 8.64 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Filter Socks (in Tons) RWC 812 | 0.18 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 2,596.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 74.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 38.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 773.91 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 21.25 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
2018 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 1,488.86 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 126.67 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid (in Barrels) RWC 808 | 20.76 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid (in Barrels) RWC 808 | 309.58 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 1,133.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Servicing Fluid (in Barrels) RWC 808 | 41.53 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 42.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 1,381.05 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 64.16 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2476368 | Primary Facility | 2016-04-19 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Service auger rig
Drilled a 36” wellbore and set 26” conductor casing at 42 ft. on 4/18/16. |
2489724 | Primary Facility | 2016-06-02 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29
Moved onto this well on 5/29/16 and resumed drilling at 52 ft. KB. The 20” casing was set at 273 ft. on 5/29/16 and cemented to surface with 13 bbls returned. The 13 3/8” casing was set at 526 ft. on 5/30/16 and grouted to surface above a basket. Coal was found from 482 ft. to 487 ft. A basket was set at 454 ft. The 9 5/8” casing was set at 1887 ft. on 6/1/16 and cemented to surface with 16.5 bbls returned. KOP was at 2500 ft. Currently at 2486 ft. and drilling ahead. |
2511400 | Primary Facility | 2016-08-16 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 8/16/16. Currently rigging up to resume drilling. |
2514697 | Primary Facility | 2016-08-25 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 8/16/16 and resumed drilling at 6868 ft. MD. KOP was at 7060 ft. MD (6975 ft. TVD) from tangent. EOB on the curve was at 8268 ft. MD (7627 ft. TVD). TD was at 16,321 ft. MD (7740.85 ft. TVD) on 8/19/16. The 5 ½” casing was set at 16,312 ft. and cemented to surface with 8 bbls returned. |
For data sources see[6]