X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-105-21860

Well Details

Well ID: 37-105-21860
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Ulysses Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153232
Farm/Lease Name: HEADWATERS 143 4HU
License Status: Active
Spud Date: 2016-06-18
Permit Date: 2016-01-28
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.842512
Longitude: -77.740401

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-07 2017-01-17 11283 15,615,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (5%) Keane Acidizing Water 7732-18-5 95 0.049761 74111
Hydrochloric Acid (5%) 7647-01-0 5 0.002619 3900.58
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 0.601745 896202
Water 7732-18-5 95 0.049761 74111
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0018255 2718.78
copolymer of 2-propenamide Proprietary 10 0.00912749 13593.9
Ethoxylated alcohol 68131-39-5 10 0.000150512 224.163
propan-2-ol 67-63-0 5 0.00007526 112.082
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000150512 224.163
formic acid 64-18-6 10 0.000150512 224.163
Polyurethane Resin (Nuisance Dust) 57029-46-6 2 0.0242607 36132.4
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000301024 448.327
Citric acid 77-92-9 40 0.001797 2676.34
oleic acid diethanolamide 93-83-4 2 0.0018255 2718.78
Cinnamaldehyde 104-55-2 10 0.000150512 224.163
Hydrochloric Acid (7.5%) Keane Acidizing Hydrochloric Acid (7.5%) 7647-01-0 7.5 0.0487901 72665
Water 7732-18-5 92.5 0.601745 896202
KFR-23 Keane Friction Reducer Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0018255 2718.78
copolymer of 2-propenamide Proprietary 10 0.00912749 13593.9
oleic acid diethanolamide 93-83-4 2 0.0018255 2718.78
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0410737 61172.6
KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.001797 2676.34
acetic acid 64-19-7 60 0.0026955 4014.51
Resin Coated Sand Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 99 1.20091 1,788,550.0
Polyurethane Resin (Nuisance Dust) 57029-46-6 2 0.0242607 36132.4
Water JKLM Carrier/Base Fluid Water 7732-18-5 100 87.496 130,311,000.0
KAI-13 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.000150512 224.163
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000150512 224.163
propan-2-ol 67-63-0 5 0.00007526 112.082
ethanediol 107-21-1 40 0.000602048 896.654
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000301024 448.327
formic acid 64-18-6 10 0.000150512 224.163
Ethoxylated alcohol 68131-39-5 10 0.000150512 224.163
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 10.4907 15,624,300.0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 JKLM ENERGY LLC 1,537,722.00 153 0.00 0 0.00 0
2018 JKLM ENERGY LLC 2,443,475.00 361 0.00 0 0.00 0
2019 JKLM ENERGY LLC 332,563.00 88 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 160.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 269.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 JKLM ENERGY LLC Drill Cuttings (in Tons) RWC 810 2,402.50 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Drilling Fluid Waste (in Barrels) RWC 803 1,860.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 627.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Synthetic Liner Materials (in Tons) RWC 806 9.50 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 13,862.50 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 63.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 3,889.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 722.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Synthetic Liner Materials (in Tons) RWC 806 39.00 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 185.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 17,700.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 1,238.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 454.00 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 22,119.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Drill Cuttings (in Tons) RWC 810 34.00 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Waste Water Treatment Sludge (in Tons) RWC 804 84.00 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 163.00 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 2,080.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 10,906.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 7,345.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 749.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 JKLM ENERGY LLC Waste Water Treatment Sludge (in Tons) RWC 804 139.90 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 261.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 245.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 27,349.15 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 611.70 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid (in Tons) RWC 802 18.42 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 10,015.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 435.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 21,155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Synthetic Liner Materials (in Tons) RWC 806 9.45 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 495.00 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Other Oil & Gas Wastes (in Barrels) RWC 899 45.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 1,360.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 965.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 JKLM ENERGY LLC Produced Fluid (in Barrels) RWC 802 3,047.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Synthetic Liner Materials (in Tons) RWC 806 0.43 Tons LANDFILL 301358

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2493540 Primary Facility 2016-06-16 Preoperation Inspection No Violations Noted The Department of Environmental Protection (DEP) performed a pre-operational inspection of the JKLM Energy, LLC – Headwater 143 Well Pad located in Ulysses Twp., Potter Co. on 6/16/2016 @ 1100 hours. Present for the meeting were Jeff Long, VP Best Mananement; John Manuel, JKLM; Matt Barch, Env. Scientist JKLM; and Ronnie Burdick, Drill Supervisor JKLM. The weather was 66° overcast/rain. The well pad is located in the Cushing Hollow/Genesee Forks watershed, HQ/CWF, MF. The total project area is 19.69 acres, with 12.80 total disturbed acres.

As of today’s inspection the access road and pad surface have been final graded and soil cemented. Silt sock was observed around the perimeter of the pad area and along the access road. Contractors were in the process of hydro-seeding the cut and fill slopes of the pad, in addition to areas along the access road. Cap rock is scheduled to be laid on the pad surface and the access road tomorrow. Confusion over the need for township meeting approval of the scheduled road imp

2497753 Primary Facility 2016-06-30 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) inspected the JKLM – Headwater 143 well site in Ulysses Twp., Potter Co. on 6/30/2016 @ 1100 hours. The weather was 70° sunny, winds WNW 9mph. Present for the inspection were Lester Taylor, DEP OGI and Ron Burdick, JKLM Drilling Supervisor. An adequate site ID was observed at the entrance to the access road. A copy of the E&S plan, PPC plan and copies of the well permit were observed in the mailbox onsite. Please ensure E&S inspections of the permit area are being conducted weekly and after a rain event. Documentation of E&S inspection findings should be made available onsite.

The HAD 200 rig was observed onsite during the inspection. Mr. Burdick stated the HAD rig is drilling a portion of the 5HU vertical well bore to a depth of ~2650’. The larger H&P 500 rig will then be brought in to drill to the TD. The rig matting and containment appeared to be in good shape. All regulated substances appeared to be on secondary containment. No staining or puddles were o

2509742 Primary Facility 2016-08-09 Routine/Complete Inspection No Violations Noted
2509842 Primary Facility 2016-08-11 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) inspected the JKLM Energy – Headwaters Pad 143 located in Ulysses Twp., Potter Co. on 8/1/2016 @ 1100 hours. The weather was 80° sun/clouds, humidity 78% and winds WSW 4mph. Jon Manuel, JKLM’s onsite coordinator, stated the site had received >0.5 “ rain in the past 24 hours. Mr. Manuel stated a post-rain E&S inspection was conducted. Notes from the post-rain inspection state “Sediment pond work correctly. About 10% vegetation on location. All containment is good. No leaks observed.”

Ron Hall, JKLM Drilling Supervisor, was on location during the inspection. JKLM is currently at a depth of 6531’ drilling the 4HU well. After completing drill of the 4HU well the rig will slide over and drill the 5HU well before leaving the site. As of today’s inspection puddles were observed surrounding containment on the pad surface. Puddles were screened for field conductivity and found to be <1000 µS/cm. Field conductivity of standing water in containment surrounding chemical

2519086 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted
2535585 Primary Facility 2016-11-04 Routine/Complete Inspection No Violations Noted he Department of Environmental Protection (DEP) inspected the JKLM Energy – Headwaters Pad 143 located in Ulysses Twp., Potter Co. on 11/4/2016 @ 1200 hours. The weather was 50° sun/clouds.

Puddles were observed on the pad surface and screened for field conductivity. Puddles ranged from ~195-200 µS/cm. Containment and rig matting is still in place post drilling of the 4HU and 5 HU wells. 2 rolloff containers containing drill cuttings were observed onsite. A number of strad tanks were also staged on containment, but were empty. A shark tank was located in the corner of the pad, off containment, for freshwater storage. A puddle located on containment was screened for field conductivity and measured at 236 µS/cm. All E&S controls appeared to be functioning properly. Cut/fill slopes and topsoil stockpiles appeared well stabilized with vegetation. JKLM rep stated fracing of the wells will commence after construction of the water pad has been completed. The access road and pad surface will also be soil cemented.

2547449 Primary Facility 2016-12-27 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) inspected the JKLM Energy – Headwaters Pad 143 located in Ulysses Twp., Potter Co. on 12/27/2016 @ 1300 hours. The weather was 35° sun/clouds, snow and ice on the ground melting rapidly.

No activity was observed onsite. The well pad appears covered by ice around the containment and rig matting still in place. Frac-heads were observed on the 4HU and 5HU well heads. No electronic notification for stimulation of either well has been received at this time. An orange roll-off container labeled reuse water is sitting on the well pad, off of containment. Operator is reminded under 25 Pa Code § 78a.57 if new, refurbished or replaced tanks are used to store fluids, these tanks must be equipped with secondary containment. Only wastes generated at a well site or entirely for beneficial reuse at the well site may be stored at that well site without a SWMA permit.

The Sediment trap appears to be holding water that is frozen over. RLD’s appeared stable and functional. N

2553563 Primary Facility 2017-01-19 Routine/Complete Inspection No Violations Noted
2555465 Primary Facility 2017-01-25 Routine/Complete Inspection No Violations Noted
2561946 Primary Facility 2017-02-15 Routine/Complete Inspection No Violations Noted
2564737 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted
2568433 Primary Facility 2017-03-06 Administrative/File Review No Violations Noted
2573417 Primary Facility 2017-03-20 Routine/Complete Inspection No Violations Noted The DEP inspected the JKLM Headwaters 143 well site located in Ulysses Twp., Potter Co. on 3/20/2017. The weather was 34 degrees and cloudy. The frac has recently been completed on the 4HU and the 5HU. The wells are currently shut in. Primary containment has been lifted and stockpiled onsite. Welding and installation of production equipment was taking place at the time of this inspection. An area cordoned off by orange snow fence appears to be the site of recent spill cleanup activities. Excavated material is stockpiled in adjacent waste containers awaiting transport. Violations related to this spill are outstanding and are being tracked by waste inspector, Sean VanFleet. No new violations are noted at this time. Please contact me with any questions.
2575843 Primary Facility 2017-03-16 Follow-up Inspection No Violations Noted
2590689 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted
2642386 Primary Facility 2017-10-02 Routine/Complete Inspection No Violations Noted On 10/2/17 at 0930 hrs I conducted a routine inspection at the Headwaters 143 well site. It was sunny and 45 degrees F. No one was present during my inspection.

The 4HU and 5HU wells have been drilled and are in production; the wells were tagged. The 2HU, 3HU and 6HU wells were permitted, however, reported as "Proposed But Never Materialized". The production equipment has built-in containment, which appeared to be in good condition. No staining or evidence of spills was noted on the pad surface.

Four tank farms are staged at the site:

(6) 500 barrel (bbl) tanks in containment at the north pad corner. A minimal amount of fluid was in containment along the back edge; field measured specific conductance was 3.31 mS/cm.

(12) 500 bbl tanks in containment along the east side of the pad. Fluid was in containment along the back edge; field measured specific conductance showed as "Or" on my meter (>19.99 mS/cm). (Photo #1)

(10) 500 bbl tanks in containment near south pad corner. Fluid was in containment along t

2658512 Primary Facility 2017-11-07 Routine/Complete Inspection No Violations Noted A routine inspection of the of the JKLM Headwaters 143 well pad was conducted on 11/7/2017 @ 1230 hours. The weather was 32 degrees and snowing. The pad surface was very muddy with many large puddles. Dump trucks were observed bringing in crushed stone to help raise the pad surface and mitigate the muddy conditions.

There are 2 wells drilled and in production onsite. The 4HU and the 5HU. The 2HU, 3HU and 6HU wells were permitted but are in "proposed but never materialized" Status. Production fluids are being stored in 3 upright tanks surrounded by metal containment. All other production equipment was staged on containment which appeared to be functioning.

Multiple tank farms were observed in containment on the pad surface. 6-500 bbl tanks at the north corner of the pad. Fluid in containment had field measured conductance of 193 micro siemens/cm. 12-500 bbl tanks along the south side of the pad. Fluid in containment had field measured conductance of 188 micro siemens/cm. 10-500 bbl tanks closest to the SW c

2663202 Primary Facility 2017-11-21 Routine/Complete Inspection No Violations Noted There were no company reps present at this inspection. This well is in production with a production/tubing pressure of approx. 3800 psi.(gauge reading). Wellhead assembly area and pad are neat and orderly.
2667366 Primary Facility 2017-12-05 Routine/Complete Inspection No Violations Noted Weather is 41 Deg. F., rainy and cloudy at time of inspection. Routine inspection of JKLM LLC, Headwaters Pad on December, 5 2017.

There are two producing wells on location. All annulus are open and vented at time of inspection ( 20"x13"; 13"x9"; 9"x5"). 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Mechanical gauge on the production tubing shows 3700 psi. The pad was looking neat and well organized.

DEP representatives - Ulyana Trynovich and Lester Taylor. JKLM representative - Robb Bowens Production Superintended.

2715542 Primary Facility 2018-04-04 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection completed a routine inspection of the JKLM Headwaters 143 well pad with Sean VanFleet, DEP Env. Protection Specialist on 4/4/2018 @1220 hours. The weather was 38 degrees, strong wind gusts with snow squalls in the area.

An AST was observed in the NW corner of the pad. The AST was used to hold waste water during the frack on the HW 145 well pad. An oily sheen was observed on the ground surface adjacent to the AST and appeared to be emanating from a “duck pond” containment nearby. No areas of elevated conductivity were found. Mr. Harrick, JKLM was informed of the sheen via email and stated it was being handled. No other areas of concern were observed onsite. The company last inspected the site on 4/4/2018 with the following comments “E&S inspection performed, controls good, no issues, see report” -KLF. A tank inspection was last completed on 3/29/18 with “no issues”. We departed the site @1245.

2736535 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production
2748828 Primary Facility 2018-07-02 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production.
2794066 Primary Facility 2018-10-19 Routine/Complete Inspection Violation(s) Noted The DEP conducted a ROUTINE inspection of the JKLM Headwaters 143 located in Ulysses Twp, Potter Co on 10/19/2019 @1120 hours. The weather was 45 degrees, cloudy. Present for the inspection were myself; Matt Nuss, DEP WQS Supervisor; and John Ryder, DEP Oil and Gas Bureau Chief.

The well site appeared very wet with puddles located on the surface. Two wells were observed in production on the site. The AST onsite appeared to contain impaired water. Evidence of truck traffic driving over the duck pond containment in front of the tanks located at the site entrance was observed.

Muddy tire tracks were also observed backing over the duck pond containment in front of the production tanks. Two puddles were observed on the pad surface in front of the containment that had a field measured conductivity of "Over Range" or >20.00mS/cm. This constitutes violations of 25 Pa Code 78a.56(a), SWMA 301, and CSL 402(b).

An apparent leak of production fluid was observed on the 5HU well head (see photo #2). This issue should

2803622 Primary Facility 2018-11-15 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. Annulus vent intermediate 2 x production (9 5/8" x 5 1/2") was venting 100% LEL (lower explosion limit) and 26% METHANE combustible gas. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2806280 Primary Facility 2018-11-26 Administrative/File Review No Violations Noted An ADMINISTRATIVE inspection of the JKLM Headwaters 143 well site located in Ulysses Twp., Potter Co. was conducted in response to the receipt of a NOV response by JKLM, dated 11/12/2018. The violations cited in inspection report#2794066 dated 10/19/2018 are CORRECTED at this time. Please contact me with any questions.
2838403 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. A gauge on the production/ flow line indicated a psi (pounds per square inch) of 2626. The 9" x 5" (intermediate x production) casing string is connected by a flexible approximate 2" vent line that is connected to the same size annulus on the other 5 wells on this well pad on all 6 vent into a poly vent tank at the end of the row of wells. No violations were noted at this inspection.
2840157 Primary Facility 2019-02-14 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the JKLM Headwaters Pad 143 located in Ulysses Twp, Potter Co. on 2/14/2019 @1045 hours. The weather was mostly sunny, 29 degrees, winds SW 9mph, humidity 52%. The well site in addition to the surrounding area appears frozen over and snow covered. Activity onsite consists of water trucks loading/offloading fluid from an Above-ground Storage Tank (AST).

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2794066 831555 2018-10-19 2018-11-26 CSL 402(b) Environmental Health & Safety Puddles on the pad surface, outside of containment, in front of the production tank loading area had a field measured conductivity of "Over Range" or >20.00mS/cm.
2794066 831556 2018-10-19 2018-11-26 SWMA 301 Environmental Health & Safety Puddles on the pad surface, outside of containment, in front of the production tank load area had a field measured conductivity of "Over Range" or >20.00mS/cm.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
831555 368804 NOV - Notice of Violation 2018-11-26
831556 368804 NOV - Notice of Violation 2018-11-26

For data sources see[7]

References