37-115-22298

Well Details

Well ID: 37-115-22298
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154188
Farm/Lease Name: TSOUROUS, A. 2
License Status: Active
Spud Date: 2017-07-28
Permit Date: 2017-05-31
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.781822
Longitude: -75.934378

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-15 2018-03-21 6747 26,986,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00193016 4965.82
Hydrochloric Acid 7647-01-0 15 0.00386031 9931.65
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0169054 43493.6
organic phosphonic salts 15827-60-8 15 0.00266928 6867.41
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.5342 225,204,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.00007603 195.596
formic acid 64-18-6 10 0.00007603 195.596
Ethoxylated alcohol 68131-39-5 10 0.00007603 195.596
Ethylene glycol 107-21-1 40 0.000304103 782.384
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007603 195.596
isoproyl alcohol 67-63-0 5 0.00003801 97.798
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000152052 391.192
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000641709 1650.96
Acetic acid 64-19-7 5 0.000106951 275.16
Biocide, MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.000705475 1815.02
Glutaral 111-30-8 26.7 0.00236338 6080.41
ethonal 64-17-5 2.8 0.000247846 637.646
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000470021 1209.25
Water 7732-18-5 56.7 0.00502064 12916.9
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.3087 31,667,300.0
Friction Reducer, KFR-20 Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00509192 13100.3
oleic acid diethanolamide 93-83-4 1 0.00101838 2620.05
Petroleum distillate 64742-47-8 1 0.00101838 2620.05
Water 7732-18-5 30 0.0305515 78601.6
Copolymer of 2-propenamide 69418-26-4 5 0.00509192 13100.3
ammonium chloride 12125-02-9 30 0.0305515 78601.6
Other Chemical(s) Listed Above See Trade Name(s) List Citric acid 77-92-9 30 0.000641709 1650.96
organic phosphonic salts 15827-60-8 15 0.00266928 6867.41
Copolymer of 2-propenamide 69418-26-4 5 0.00509192 13100.3
ammonium chloride 12125-02-9 30 0.0305515 78601.6
isoproyl alcohol 67-63-0 5 0.00003801 97.798
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000470021 1209.25
Cinnamaldehyde 104-55-2 10 0.00007603 195.596
oleic acid diethanolamide 93-83-4 1 0.00101838 2620.05
Petroleum distillate 64742-47-8 1 0.00101838 2620.05
Ethoxylated alcohol 68131-39-5 10 0.00007603 195.596
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00509192 13100.3
Glutaral 111-30-8 26.7 0.00236338 6080.41
Water 7732-18-5 7.5 0.00193016 4965.82
formic acid 64-18-6 10 0.00007603 195.596
didecyldimethylammonium chloride 7173-51-5 8 0.000705475 1815.02
ethonal 64-17-5 2.8 0.000247846 637.646
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000152052 391.192
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007603 195.596

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,792,765.00 219 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,418,829.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Drill Cuttings (in Tons) RWC 810 1,877.42 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Synthetic Liner Materials (in Tons) RWC 806 9.90 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid (in Barrels) RWC 802 3.33 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes (in Tons) RWC 899 0.11 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid (in Barrels) RWC 802 1,796.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge (in Tons) RWC 804 76.20 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid (in Barrels) RWC 802 52,389.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Synthetic Liner Materials (in Tons) RWC 806 17.17 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid (in Barrels) RWC 802 9,649.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid (in Barrels) RWC 802 3,594.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid (in Barrels) RWC 802 101.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2621149 Primary Facility 2017-07-31 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 11:35a.m. for a new spud inspection.

I met with Brett Wambold of Selman & Associates. United Drilling was on site to drill the holes and run the conductor pipe on the 1H, 2H, 3H, 4H, 6H, and 8H wells. The 3H, 4H and 8H were drilled to TD at 94'. There was a rig on the 1H and the 6H, the rig on the 1H was running 26 pipe to 25' and the rig on the 6H was at TD of 94' and started pulling drill pipe. The 2H was at a depth of 70'. All the conductor pipe will be run to 94' and cemented in. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:20p.m.

2634846 Primary Facility 2017-09-12 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. The surface and intermediate casings were cemented by Schlumberger with CemCrete cement. Proposed depth for the well is 20,164' I took a walk around the location and there were no obvious concerns noticed. No violation noted.

2700619 Primary Facility 2018-02-27 Routine/Complete Inspection No Violations Noted At time of inspection.

I met with company men Steve Barrett and Ken Wilson. Keane was on site to frac the 1H, 2H, 3H, 4H, 6H, and 8H wells. They were just starting stage 22 out of 65 stages on the 2H when I arrived. The 1H and 3H were both completed with 48 stages. There were 21 stages completed out of 69 stages on the 4H. There were 22 stages completed out of 67 stages on the 6H. The 8H wasn't started yet but will have 32 stages when completed. I took a walk around the location there were no obvious concerns noticed. There were no violations noted.

2719974 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Tsourous well site on April 13, 2018 (Photo 1). The site had its last E&S inspection on April 13,2018 (Photo 16). The site had sediment being tracked from the site as well as running from the access road onto Lutz road. Lutz Road and Youngs Road were very muddy from truck traffic to the site and had a considerable amount of sediment pushed off the side (Photos 2, 18). This was in contrast to Lutz road beyond the access road to the well pad where the sediment was not nearly such a preponderance of sediment (Photo 17). The access road leading to the site was beset with problems. The entrance showed evidence of sediment leaving the site (Photo 2). The first culvert up the access road was occluded with sediment on both ends (Photo 4 and 5). There was also an unprotected topsoil pile near the entrance area (Photo 3). The slopes of the access road had sediment running off and accumulating around and beyond the filter sock BMPs (Photos 6,7,8,9,10). The sediment ran arou
2733246 Primary Facility 2018-05-21 Follow-up Inspection No Violations Noted I performed a follow up inspection of the Tsourous well site. The wells associated with this site are as follows: 115-22297, 115-22298, 115-22286, 115-22288, 115-22299, 115-22287. The areas of concern noted in the previous inspection have been addressed and repaired. There did not appear to be any additional erosional issues at the time of inspection. There were no violations noted.
2738771 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. Fluid is going in a 500bbl flow back tank that is on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2765273 Primary Facility 2018-08-02 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:10. The weather conditions are cloudy skies, and breezy with light rain falling, with temperatures in the low to mid 70's as I arrived. Shortly after I arrived, light rain evolved into a moderate, steady rainfall. There was no activity or personnel at the site. All permitted wells listed on the Site ID sign are in production. I observed trash and debris scattered in some areas of the well pad and tank pad surface. The trash was most likely deposited on the ground surface of the site during completions operations, which have concluded in a relatively recent time frame. I departed from the site at 12:53.
2809103 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Tsourous well site. The well site is extensive and has a separate tank pad. The access road is quite long and steep but was plowed. The last E&S inspection was November 27, 2018.
    The weather was overcast and there was light snowfall the previous evening.  The  temperature was about 34 degrees.
    The road (Lutz Road) leading to the site was snowy and slushy.  There didn't appear to be any runoff along the roadside.
     The tank pad surface was snow covered and stable.  The infiltration basin, fill slope and topsoil pile all had good vegetation visible through the snow on them.  There didn't appear to be any erosional problems at the tank pad area.
    The well pad was expansive but had good growth on all slopes, visible through the snowcover.  The pad surface was mostly hard and partially plowed, with a few slushy areas.  The infiltration basin was mostly empty and appeared stable and growth was visible around it.  
    The wells were properly labeled and the
2835866 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty and there was no gas detected. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[7]