X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-21686

Well Details

Well ID: 37-019-21686
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Buffalo Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149696
Farm/Lease Name: THOMAS S PAJER ET AL 2H
License Status: Active
Spud Date: 2010-04-14
Permit Date: 2010-01-22
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.675081
Longitude: -79.751297

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 174,604.00 81 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 936,604.00 362 0.00 0 0.00 0
2012 XTO ENERGY INC 670,884.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 467,614.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 327,709.00 310 0.00 0 0.00 0
2015 XTO ENERGY INC 356,058.00 363 0.00 0 0.00 0
2016 XTO ENERGY INC 290,189.00 366 0.00 0 0.00 0
2017 XTO ENERGY INC 254,380.70 351 0.00 0 0.00 0
2018 XTO ENERGY INC 238,020.00 337 0.00 0 0.00 0
2019 XTO ENERGY INC 53,436.00 82 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 2,290.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 720.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 850.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-20114
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 530.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2012 XTO ENERGY INC Produced Fluid (in Barrels) 161.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid (in Barrels) 117.00 Bbl INJECTION DISPOSAL WELL 34-151-22783
2012 XTO ENERGY INC Produced Fluid (in Barrels) 252.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid (in Barrels) 84.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid (in Barrels) 1,470.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2012 XTO ENERGY INC Produced Fluid (in Barrels) 116.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 XTO ENERGY INC Produced Fluid (in Barrels) 200.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2013 XTO ENERGY INC Produced Fluid (in Barrels) 482.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2013 XTO ENERGY INC Produced Fluid (in Barrels) 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid (in Barrels) 98.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid (in Barrels) 336.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid (in Barrels) 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid (in Barrels) 43.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid (in Barrels) 545.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Basic Sediment (in Barrels) RWC 807 7.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 274.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 255.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 321.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 410.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1877665 Primary Facility 2010-04-16 Drilling/Alteration No Violations Noted
1884272 Primary Facility 2010-05-13 Drilling/Alteration No Violations Noted
1890752 Primary Facility 2010-06-02 Routine/Complete Inspection No Violations Noted
1905864 Primary Facility 2010-08-05 Drilling/Alteration No Violations Noted
1908940 Primary Facility 2010-08-27 Drilling/Alteration No Violations Noted
1988635 Primary Facility 2011-07-14 Routine/Partial Inspection No Violations Noted

For data sources see[6]

References