Well Details

Well ID: 37-019-22683
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Winfield Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 153870
Farm/Lease Name: PER W45 6H
License Status: Active
Spud Date: 2018-09-14
Permit Date: 2017-10-17
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.776122
Longitude: -79.729564

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 476.84 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drill Cuttings (in Tons) RWC 810 56.12 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 104.00 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Drill Cuttings (in Tons) RWC 810 508.00 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 470.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 230.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 15.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2793311 Primary Facility 2018-10-22 Routine/Partial Inspection No Violations Noted At the time of inspection, this well has been spud and the top hole drilled. There is surface casing and intermediate casing cement in the well. Both have been cemented to surface. The reports were emailed to the Oil & Gas Inspector Supervisor.

Currently, Highland rig 8 is over the 7H well.

2794582 Primary Facility 2018-10-24 Routine/Partial Inspection No Violations Noted On 10/24/2018, WQS Brian MacQuarrie onsite. Meet with Ken Silvis -onsite drill manager. Highlands Rig #8 onsite drilling top portion (approximately 2,800 feet), of 6 wells; 2H-019-22566, 3H-019-22681, 4H-019-22682, 6H-019-22683, 7H-019-22684 and 8H-019-22685. Well site secondary containment setup on pad. Frac tanks installed within secondary containment. Freshwater impoundment fenced in and lined. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established.
2801805 Primary Facility 2018-11-13 Routine/Partial Inspection No Violations Noted On 11/13/2018, WQS Brian MacQuarrie onsite. Highlands drill rig #8 no longer onsite. Six wells top hole drilled, 2H-019-22566, 3H-019-22681, 4H-019-22682, 6H-019-22683, 7H-019-22684 and 8H-019-22685. No current activity onsite. Well containment setup. Frac tanks staged on tank pad. Well development impoundment fenced in and maintained. Erosion and Sedimentation best management practices maintained. Vegetation well established.
2827778 Primary Facility 2019-01-15 Routine/Partial Inspection No Violations Noted On 1/15/19, WQS Brian MacQuarrie onsite. Patterson Rig # 259 onsite completing the drilling of six wells; 2H-019-22566, 3H-019-22681, 4H-019-22682, 6H-019-22683, 7H-019-22684 and 8H-019-22685. Well site secondary containment maintained. Snow on ground during inspection.
2832689 Primary Facility 2019-01-28 Routine/Partial Inspection No Violations Noted On 1/28/2019, WQS Brian MacQuarrie onsite. Patterson Rig #259 onsite. Drilling completed at the 6H-019-22683, 7H-019-22684 and 8H-019-22685. Drilling at the 2H-019-22566, 3H-019-22681 and 4H-019-22682 still in process. Well site secondary containment maintained. Freshwater impoundment fenced in and lined. Snow on ground during inspection.