If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37291 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.435056,"lon":-79.127544,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: ST CLAIR 2 | |
License Status: Active | |
Spud Date: 2012-02-09 | |
Permit Date: 2011-12-28 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.435056 | |
Longitude: -79.127544 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | PENN VIEW EXPLORATION CORP | 4,567.00 | 184 | 0.00 | 0 | 0.00 | 0 |
2013 | PENN VIEW EXPLORATION CORP | 6,095.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENN VIEW EXPLORATION CORP | 4,709.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENN VIEW EXPLORATION CORP | 3,738.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENN VIEW EXPLORATION CORP | 2,003.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | PENN VIEW EXPLORATION CORP | 540.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | PENN VIEW EXPLORATION CORP | 404.00 | 242 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENN VIEW EXPLORATION CORP | Produced Fluid (in Barrels) | 295.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid (in Barrels) | 456.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid (in Barrels) | 250.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid (in Barrels) | 91.00 Bbl | ROAD SPREADING | |
2016 | PENN VIEW EXPLORATION CORP | Produced Fluid (in Barrels) RWC 802 | 40.00 Bbl | ROAD SPREADING | |
2017 | PENN VIEW EXPLORATION CORP | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | ROAD SPREADING |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2041291 | Primary Facility | 2012-02-08 | Routine/Complete Inspection | No Violations Noted | Site visit was due to spud notification. |
2042702 | Primary Facility | 2012-02-14 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8¿) was set at 421¿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7¿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet. |
2043974 | Primary Facility | 2012-02-16 | Routine/Complete Inspection | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. |
2043985 | Primary Facility | 2012-02-16 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. |
2048847 | Primary Facility | 2012-03-06 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2151616 | Primary Facility | 2013-03-20 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 “) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8”) was set at 431’. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7”) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet. |
For data sources see[6]