If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28011 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.329385,"lon":-79.661891,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Hempfield Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: G RAIN UNIT 001 | |
License Status: Active | |
Spud Date: 2009-11-17 | |
Permit Date: 2009-08-06 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.329385 | |
Longitude: -79.661891 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | KRIEBEL MINERALS INC | 8,222.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 6,787.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 5,118.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 3,864.00 | 324 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 3,762.00 | 321 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 2,619.00 | 318 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 2,297.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 1,306.00 | 321 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 1,836.00 | 322 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | KRIEBEL MINERALS INC | Produced Fluid (in Barrels) | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | KRIEBEL MINERALS INC | Produced Fluid (in Barrels) | 140.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | KRIEBEL MINERALS INC | Produced Fluid (in Barrels) | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | KRIEBEL MINERALS INC | Produced Fluid (in Barrels) | 140.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2014 | KRIEBEL MINERALS INC | Produced Fluid (in Barrels) | 80.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1845851 | Primary Facility | 2009-11-25 | Complaint Inspection | No Violations Noted | Drill rig was located onsite at the time of the inspection. Below grade pit located onsite at the time of the inspection, and it had more than the two feet of required lined freeboard. Noted that the access road and a portion of the site had been rocked with clean durable rock. Noted that the access road was construected straight up over the hill, thus making it difficult to implement erosion controls to minimize the amount of sediment generated and carried off-site. It was noted that this issue was reported as a complaint and had been addressed by the operator through plowing the mud off the road and a road broom. The mud which had been pushed to the side of the road should be gathered and taken back up to the site during site restoration. The operator should also continue to monitor the site and access road, especially when the rig is moved off-site and during any possible well stimulation activities. The operator shold have a plow and broom truck located onsite during either of those activities. |
1847551 | Primary Facility | 2009-11-19 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLING AHEAD, GEOLOGIST ONSITE EXAMINING CUTTINGS UNDER A MICROSCOPE TO DETERMINE BEST DEPTH TO SET CASING SINCE THIS IS UNCHARTED DRILLING TERRITORY. WATER TRUCKS ARE RUNNING TO KEEP UP WITH THE PIT. |
1884860 | Primary Facility | 2010-05-12 | Routine/Complete Inspection | No Violations Noted | Well is drilled and completed. |
1901913 | Primary Facility | 2010-07-07 | Drilling/Alteration | No Violations Noted | WELL HAS 120 PSI. ANNULUS OPEN, TANK GROUNDED, NO DIKE AROUND TANK FARM, SITE RESTORED APPOXIMATELY 70% VEGETATED. |
2573929 | Primary Facility | 2017-03-22 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tagged. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. |
For data sources see[6]