If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24505 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.065564,"lon":-79.824775,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Jefferson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148756 | |
Farm/Lease Name: LESTER UNIT 5H | |
License Status: Active | |
Spud Date: 2012-04-28 | |
Permit Date: 2012-04-11 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.065564 | |
Longitude: -79.824775 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-28 | 2013-03-28 | 7820.0 | 7060259.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Proppant (lbs) | Proppant | 5.03 | 5.34154 | ||||
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30.0 | None | ||
CMHPG (lbs) | Ashland | Water Viscosifier | Carboxymethylhydroxyporoyl guar blend | Mixture | 100.0 | 0.0014 | ||
EC 6116a | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5.0 | 0.00117 | ||
1,1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.0 | 0.00704 | |||||
Polyethylene Glycol | 25322-68-3 | 60.0 | 0.01408 | |||||
GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60.0 | 0.00002000 | ||
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30.0 | 0.03444 | ||
Clean Volume (gals) | Carrier/Base Fluid | 94.97 | 100.0 | |||||
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30.0 | 0.00701 | ||
7.5 Hcl Acid | Reagent/PP G | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.19955 | ||
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30.0 | 0.00685 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 664,990.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 1,201,807.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 853,358.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 620,191.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 509,784.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 432,754.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 57,990.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste (in Barrels) | 995.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste (in Barrels) | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 1,418.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings (in Tons) | 930.56 Tons | LANDFILL | 100419 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste (in Tons) | 87.59 Tons | LANDFILL | 100592 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 1,850.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste (in Barrels) | 18.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 2,575.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 12,355.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) | 6,239.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) | 2,553.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste (in Tons) | 7.08 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 9.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) | 1,007.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 362.02 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 609.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 145.40 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 155.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 24.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 1,033.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 68.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 22.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 196.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 260.20 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid (in Barrels) RWC 802 | 92.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2079807 | Primary Facility | 2012-06-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 670' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TONIGHT. |
2079808 | Primary Facility | 2012-06-18 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 253' (TD). RUNNING COAL PROTECTION CASING AND CEMENTING TONIGHT. SET BASKET @ 164'. |
2090006 | Primary Facility | 2012-06-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 2380' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TONIGHT. |
2090007 | Primary Facility | 2012-07-02 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 6800' (TD). RUNNING BRIDGE PLUG AND LOADING HOLE WITH OIL BASE MUD.CAPPING AND MOVING TO NEXT WELL. |
2092030 | Primary Facility | 2012-08-15 | Complaint Inspection | No Violations Noted | 5 verticals and no horizontals drilled. Crew cleaning frac tank. |
2113721 | Primary Facility | 2012-09-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 MOVING ON TO LESTER 5 - H (9/26/2012). DRILLING ON FLUID @ 8589'. |
2113724 | Primary Facility | 2012-10-04 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 9087' TODAY. |
2113742 | Primary Facility | 2012-10-10 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 13,431' (TD). RUNNIG 51/2" CASING AND CEMENTING TONIGHT.DURING CEMENTING PROCEDURES OF PROD. CASING (I/R OF CEMENT TO SURFASE TO SOON).THEY FLUSH CEMENT OUT OF HOLE WITH WATER THAN OIL BASE MUD AT THIS TIME.CHEVRON EXSPECTED PROD. CASING HAS SEPERATED .STARTED PULLING PROD. CASING AND FINDING OUT PROD. CASING SEPERATED @ 5051' DOWN HOLE. LEAVING 8000' OF 51/2"CASING IN WELL BORE. CHEVRON GOING TO RETRIEVE PIPE WITH A SPEAR. |
2113746 | Primary Facility | 2012-10-17 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 FISHING OUT LAST 20 - JOINTS OF PROD. CASING TODAY. GOING IN TO MAKE SURE NO CENTRALIZERS LEFT IN WELL BORE. RUNNING NEW PROD. CASING AS SOON AS WELL BORE IS CLEAN. |
2113749 | Primary Facility | 2012-10-22 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 13,341' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT (10/20/2012). |
2121521 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | E&S, PPC, Permits in box, site ID sign up. Some erosion issues at back of water impoundment being addressed by operator. Will monitor further. |
2137229 | Primary Facility | 2013-02-06 | Routine/Complete Inspection | No Violations Noted | Site ID sign up, Plans and permits in box, Site stable. Impoundment reaching 2 foot freeboard, operator told and will pump level down. |
2160791 | Primary Facility | 2013-04-24 | Administrative/File Review | In Compliance with Policy | Operator self reported a spill of 10 barrels of brine water and a snall amount of friction reducer(1gal),nto containment. Operator reported and performed clean up in compliance with current Department spill policy. |
2184515 | Primary Facility | 2013-07-18 | Site Restoration | No Violations Noted | Restoration extension request until 1/28/15. Site stable and wells being hooked up. Extension approved. |
2264213 | Primary Facility | 2014-04-21 | Routine/Complete Inspection | No Violations Noted | 5 wells drilled and equipped. 4 tanks onsite. no open pits. Site graded and mulched. |
2330205 | Primary Facility | 2014-12-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tanks and heater units appear to be in sound condition. Site appeared to be in sound stable condition. The Departments suggests the Operator continue to monitor the site weekly and after significant precipitation events. |
2356017 | Primary Facility | 2015-03-26 | Routine/Complete Inspection | No Violations Noted | 5 wells onsite and equipped for production. 4 tanks onsite. Id sign ok. Site reclaimed. |
2374000 | Primary Facility | 2015-05-28 | Routine/Complete Inspection | No Violations Noted | |
2492873 | Primary Facility | 2016-05-17 | Routine/Complete Inspection | No Violations Noted | On 05/17/16 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by Chevron Appalachia LLC. The Act 9 sign was in place and all required documents were present in the mailbox. The site meets the standards required for permit termination. The NOT is approved. |
2523507 | Primary Facility | 2016-09-20 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Well appears to be producing natural gas. |
2585008 | Primary Facility | 2017-04-20 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection |
2734992 | Primary Facility | 2018-05-29 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. |
2792972 | Primary Facility | 2018-10-11 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. |
For data sources see[7]