X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24506

Well Details

Well ID: 37-051-24506
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Jefferson Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148756
Farm/Lease Name: LESTER UNIT 6H
License Status: Active
Spud Date: 2012-04-29
Permit Date: 2012-04-11
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.065569
Longitude: -79.824828

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 520,771.00 275 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 776,428.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 488,845.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 338,653.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 272,739.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 228,993.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 52,722.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) 1,545.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 9,008.20 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings (in Tons) 930.56 Tons LANDFILL 100419
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste (in Tons) 87.59 Tons LANDFILL 100592
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 1,490.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) 18.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 2,575.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 24,431.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 1,677.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 2,553.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste (in Tons) 7.08 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 9.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 1,007.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 362.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 609.40 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 144.80 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) RWC 803 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 1,033.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 68.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 22.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 196.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 260.20 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 92.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2090011 Primary Facility 2012-07-03 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 218' (TD).RUNNING COAL PROTECTION CASING AND CEMENTING TODAY.
2090017 Primary Facility 2012-07-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS. KEANE # 2144 DRILLING ON AIR @ 678' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY.
2090027 Primary Facility 2012-07-09 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,KEANE # 2144 DRILLING ON AIR @ 2352' (TD).RUNNING INTERMEDIATE CASING AND CEMENTING TODAY.
2090031 Primary Facility 2012-07-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 7100' (TD). RUINNING BRIDGE PLUG AND LOADING HOLE WITH OIL BASE MUD. CAPPING THE WELL AND MOVING TO NEXT WELL ON SAME SITE.
2092031 Primary Facility 2012-08-15 Complaint Inspection No Violations Noted 5 verticals and no horizontals drilled. Crew cleaning frac tanks.
2113753 Primary Facility 2012-09-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 11,283' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT (9/25/2012).
2113757 Primary Facility 2012-09-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 MOVING ON THIS WEEK OF (9/21/2012).
2121526 Primary Facility 2012-12-06 Routine/Complete Inspection No Violations Noted E&S, PPC, Permits in box, site ID sign up. Some erosion issues at back of water impoundment being addressed by operator. Will monitor further.
2137231 Primary Facility 2013-02-06 Routine/Complete Inspection No Violations Noted Site ID sign up, Plans and permits in box, Site stable. Impoundment reaching 2 foot freeboard, operator told and will pump level down.
2184516 Primary Facility 2013-07-18 Site Restoration No Violations Noted Restoration extension request until 1/28/15. Site stable and wells being hooked up. Extension approved.
2264214 Primary Facility 2014-04-21 Routine/Complete Inspection No Violations Noted 5 ewells drilled and equipped. 4 tanks onsite. No open pits. Site graded and mulched.
2330207 Primary Facility 2014-12-19 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tanks and heater units appear to be in sound condition. Site appeared to be in sound stable condition. The Departments suggests the Operator continue to monitor the site weekly and after significant precipitation events.
2356018 Primary Facility 2015-03-26 Routine/Complete Inspection No Violations Noted 5 wells onsite and equipped for production. 4 tanks onsite. Id sign ok. Site reclaimed.
2374002 Primary Facility 2015-05-28 Routine/Complete Inspection No Violations Noted
2492874 Primary Facility 2016-05-17 Routine/Complete Inspection No Violations Noted On 05/17/16 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by Chevron Appalachia LLC. The Act 9 sign was in place and all required documents were present in the mailbox. The site meets the standards required for permit termination. The NOT is approved.
2523509 Primary Facility 2016-09-20 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Well appears to be producing natural gas.
2585010 Primary Facility 2017-04-20 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection
2585012 Primary Facility 2017-04-20 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection
2734996 Primary Facility 2018-05-29 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2792979 Primary Facility 2018-10-11 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.

For data sources see[6]

References