X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28808

Well Details

Well ID: 37-129-28808
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Lower Burrell City
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: SLUSS 9H
License Status: Active
Spud Date: 2012-11-26
Permit Date: 2012-08-31
Unconventional Well: N
Configuration: Deviated Well
Latitude: 40.569689
Longitude: -79.709522

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2013 PENNECO OIL CO INC 13,179.00 275 6,061.97 275 0.00 0
2014 PENNECO OIL CO INC 11,995.00 365 2,552.26 365 0.00 0
2015 PENNECO OIL CO INC 7,853.17 365 1,816.37 304 0.00 0
2016 PENNECO OIL CO INC 5,899.29 366 1,266.30 211 0.00 0
2017 PENNECO OIL CO INC 2,894.00 365 504.28 365 0.00 0
2018 PENNECO OIL CO INC 6,443.06 365 717.78 152 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 PENNECO OIL CO INC Fracing Fluid Waste (in Barrels) 95.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Drilling Fluid Waste (in Barrels) 170.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Produced Fluid (in Barrels) 992.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid (in Barrels) 71.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 57.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2017 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 15.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 18.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 PENNECO OIL CO INC Produced Fluid (in Barrels) RWC 802 29.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2116544 Primary Facility 2012-11-19 Routine/Complete Inspection No Violations Noted At the time of inspection well not drilled. Drill rig on site. No violations.
2119006 Primary Facility 2012-11-27 Drilling/Alteration No Violations Noted Rigging up Falcon rig#27 at time of inspection. Temporary pit for containing dry cuttings lined and freeboard maintained.
2119990 Primary Facility 2012-11-30 Routine/Complete Inspection Violation(s) Noted
2121467 Primary Facility 2012-12-05 Drilling/Alteration No Violations Noted Falcon rig#27 circulating hole in preparation to begin drilling on mud (1823’ – depth of hole) at time of inspection. Temporary pit for containing dry cuttings lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe and OGI J. Branan.
2124169 Primary Facility 2012-12-17 Compliance Evaluation No Violations Noted At the time of inspection the drill rig was on site. The Operator indicated that this well has not been started. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The issue resulting in a violation written on 11/30/2012 have been corrected. The Operator has also applied for an OG 71 for this site. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained
2128508 Primary Facility 2012-12-26 Drilling/Alteration No Violations Noted Waiting on frac. Temporary pits for containing dry cuttings lined, tarped, and freeboard maintained. Inspection conducted w/WQS S. Steingrabe.
2152342 Primary Facility 2013-04-01 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks well apparatus and pump jack appear to be in sound condition. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2380327 Primary Facility 2015-06-18 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The brine tank, pump jack and well apparatus appear to be in sound condition. The site appeared to be restored. No observation of accelerated erosion or sedimentation in relation to the well site or access road.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2119990 654898 11/30/2012 2012-11-30 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. Administrative
2119990 654900 11/30/2012 2012-11-30 78.61A - Improper pit disposal of drill cuttings from above the casing seat Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
654898 294998 NOV - Notice of Violation Comply/Closed 2012-12-17
654900 294998 NOV - Notice of Violation Comply/Closed 2012-12-17

For data sources see[6]

References