X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28964

Well Details

Well ID: 37-129-28964
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 147584
Farm/Lease Name: SHAW 1HHSU
License Status: Active
Spud Date: 2018-05-08
Permit Date: 2017-12-06
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.503825
Longitude: -79.572472

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 679.61 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 141.47 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 167.78 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 1,361.41 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Synthetic Liner Materials (in Tons) RWC 806 2.26 Tons LANDFILL 100280
2018 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 1,227.64 Tons LANDFILL 100277
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 71.66 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 215.35 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 16.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 1,122.71 Tons LANDFILL 06-08438
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 133.88 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 41.03 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 1,238.06 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 18.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 577.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Synthetic Liner Materials (in Tons) RWC 806 0.98 Tons LANDFILL 100663
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 225.40 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 353.98 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 56.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 153.03 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 282.44 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 93.58 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 12.86 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 21.65 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 14.16 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 19.29 Tons LANDFILL 100172
2018 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 77.93 Tons LANDFILL 100280
2018 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 12.14 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 19.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Filter Socks (in Tons) RWC 812 1.42 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 17.86 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Drilling Fluid Waste (in Tons) RWC 803 26.32 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 15.71 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 137.43 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 17.14 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 164.42 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 152.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 33.84 Tons LANDFILL 06-08438
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 186.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid (in Tons) RWC 802 2.68 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 125.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 14.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 49.57 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid (in Tons) RWC 802 6.34 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 122.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 32.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Synthetic Liner Materials (in Tons) RWC 806 6.56 Tons LANDFILL 100663
2019 CNX GAS CO LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 1.55 Tons LANDFILL 100280
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 14.29 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Synthetic Liner Materials (in Tons) RWC 806 0.82 Tons LANDFILL 100280
2019 CNX GAS CO LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.84 Tons LANDFILL CID: 29084
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 22.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 212.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 113.42 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 28.57 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 140.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 27.86 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2726994 Primary Facility 2018-05-07 Drilling/Alteration No Violations Noted This Utica well was spudded on 5/4/2018. The Spud Rig drilled a 36" hole to a depth of 100' and had not yet set or cemented the 26" conductor pipe in at the time of this inspection. The permit copy, drilling information and all equipment on site looked ok.
2734522 Primary Facility 2018-05-24 Routine/Complete Inspection No Violations Noted Inspection in response to receipt of spud notification. At the time of inspection drill rig on site, setting up to commence drilling operations. All material equipment associated with drilling activity located within secondary containment.
2766420 Primary Facility 2018-08-23 Drilling/Alteration No Violations Noted Well drilled to TD 20,538 but not stimulated.
2771651 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted At the time of inspection drill rig on site and drilling activity ongoing. All materials and equipment located within secondary containment. No E&S issues.
2780050 Primary Facility 2018-09-20 Drilling/Alteration No Violations Noted 9/20/18 - well drilled not stimulated.
2838323 Primary Facility 2019-02-04 Incident- Response to Accident or Event Pending Oversight well
2838345 Primary Facility 2019-02-11 Incident- Response to Accident or Event Pending Oversight wells
2838349 Primary Facility 2019-02-05 Incident- Response to Accident or Event No Violations Noted Oversight well
2838353 Primary Facility 2019-02-06 Incident- Response to Accident or Event Pending Oversight wells
2838376 Primary Facility 2019-02-07 Incident- Response to Accident or Event Pending Oversight well
2844205 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Operator rep on site during inspection.

According to operator rep, well is shut in and a USIT log was run on this well earlier in the week. Well cellar does not appear to contain fluids at this time. Well head is covered by plastic tarp. Liner is installed on pad. This liner appears structurally sound. Three brine tanks on site. Roll off boxes on site.

For data sources see[6]

References