X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20202

Well Details

Well ID: 37-131-20202
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Meshoppen Township
Operator Name: BKV OPR LLC
Well Pad ID: 148995
Farm/Lease Name: LASCO UNIT P&G WAREHOUSE 1 LASCO 2H
License Status: Active
Spud Date: 2011-08-10
Permit Date: 2011-07-28
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.600665
Longitude: -76.014675

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-11-29 2011-11-29 7985.00 8,915,802.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI-100 Universal Well Services Scale Inhibitor
Ethylene glycol 107-21-1 60.00 0.01
SuperSurf Universal Well Services Surfactant
Methanol 67-56-1 60.00 0.07
Unislik ST 50 Universal Well Services Friction Reducer
Hydrotreated Light Distillate 30.00 0.07
7.5-15 HCL Universal Well Services Acid Water 7732-18-5 92.50
Hydrochloric acid 7647-01-0 15.00 0.07
Biocide EC 6116A Universal Well Services Biocide Polyethylene glycol 25322-68-3 60.00
Dibromoacetonitrile 3252-43-5 5.00 0.03
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 CITRUS ENERGY CORP 5,414,569.00 333 0.00 0 0.00 0
2013 CITRUS ENERGY CORP 1,972,481.00 295 0.00 0 0.00 0
2014 WARREN E & P INC 1,029,095.92 292 0.00 0 0.00 0
2015 WARREN E & P INC 1,118,633.10 323 0.00 0 0.00 0
2016 WARREN E & P INC 907,754.06 304 0.00 0 0.00 0
2017 WARREN E & P INC 1,177,572.93 365 0.00 0 0.00 0
2018 BKV OPR LLC 972,657.36 363 0.00 0 0.00 0
2019 BKV OPR LLC 111,113.61 48 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CITRUS ENERGY CORP Drill Cuttings (in Tons) 1,250.00 Tons LANDFILL THR029
2011 CITRUS ENERGY CORP Drill Cuttings (in Tons) 784.00 Tons LANDFILL 101247
2013 CITRUS ENERGY CORP Produced Fluid (in Barrels) 1,047.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CITRUS ENERGY CORP Produced Fluid (in Barrels) 330.04 Bbl REUSE OTHER THAN ROAD SPREADING
2014 WARREN E & P INC Produced Fluid (in Barrels) 126.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015 WARREN E & P INC Produced Fluid (in Barrels) 333.20 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015 WARREN E & P INC Produced Fluid (in Barrels) 251.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes (in Tons) RWC 899 5.38 Tons LANDFILL THR029
2016 WARREN E & P INC Other Oil & Gas Wastes (in Barrels) RWC 899 39.33 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes (in Barrels) RWC 899 57.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 4.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 112.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 345.90 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes (in Barrels) RWC 899 27.87 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 150.74 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2017 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 112.16 Bbl REUSE (AT WELL PAD)
2017 WARREN E & P INC Other Oil & Gas Wastes (in Barrels) RWC 899 1.33 Bbl REUSE (AT WELL PAD)
2017 WARREN E & P INC Other Oil & Gas Wastes (in Barrels) RWC 899 73.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 559.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid (in Barrels) RWC 802 42.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 BKV OPR LLC Produced Fluid (in Barrels) RWC 802 74.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 BKV OPR LLC Produced Fluid (in Barrels) RWC 802 262.33 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Produced Fluid (in Barrels) RWC 802 830.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 WARREN E & P INC Other Oil & Gas Wastes (in Barrels) RWC 899 92.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Produced Fluid (in Barrels) RWC 802 143.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Waste Water Treatment Sludge (in Tons) RWC 804 0.47 Tons RESIDUAL WASTE PROCESSING FACILITY 301280

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1995737 Primary Facility 2011-08-15 Drilling/Alteration Pending Ziegenfuss Drilling, Inc on site, just starting.
2013237 Primary Facility 2011-10-25 Drilling/Alteration No Violations Noted Patterson 61 Comp. Man - Joey Catlin
2013376 Primary Facility 2011-10-17 Drilling/Alteration No Violations Noted Patterson 61 Comp. Man - Joey Catlin drilling at 1267'
2017968 Primary Facility 2011-11-03 Drilling/Alteration No Violations Noted Patterson UTI 61 Comp. Man - Dale Barnett
2021735 Primary Facility 2011-11-16 Routine/Complete Inspection No Violations Noted Rig has moved off site. Site has been cleaned up. Crews are putting down plastic and moving in equipment in order to frac.Probably start Monday after Thanksgiving. 3 wells on this pad.
2368510 Primary Facility 2015-05-11 Routine/Partial Inspection No Violations Noted
2429746 Primary Facility 2015-12-03 Routine/Complete Inspection No Violations Noted
2677136 Primary Facility 2017-12-13 Routine/Complete Inspection No Violations Noted Arrived onsite at 14:00. Weather: Clear, Cold, ~ 25 degs. (3) active wells on this location, the P&G Warehouse 1H, Lasco 2H and McCarthy 3H. All (3) wells were producing at time of inspection. All wells prod. pressures are being monitored by wireless sending units, "SCADA" gauges. Sending data to Total Flow Control units "TFCU". All wells had (2) annular vents present. The (9x5) vents were tied into vent piping running to prod. tanks. The (13x9) vents were venting to atmosphere. Gas checks were performed at the (13x9) vent openings, using a Altair 5X gas meter. Gas checks showed ~ 75% LEL, 2% CH4, no measurable flow noted at time of imsp. While on location, Warrens' Field Rep., Scott Moyel arrived onsite. Mr. Moyel informed that the quarterly Mechanical Integrity Assessment "MIA", shut-in tests, had just been completed on these wells annuli. That is why the wells (13x9) vents were venting to atmosphere and that these annuli will be tied back into the common vent line to prod. tanks. This could also account f

For data sources see[7]

References