If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24417 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.352035989,"lon":-82.40307857,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pleasant Township | |
Operator Name: MARAM ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: KNOX WOODS | |
License Status: Producing | |
License Date: 2008-11-10 | |
Spud Date: 2009-02-10 | |
Spud Drilling Contractor: CAMPHIRE DRILLING | |
Final Drill Date: 2009-04-10 | |
Well Total Depth: 2650 ft | |
Configuration: Vertical | |
Latitude: 40.352035989 | |
Longitude: -82.40307857 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-11-10 | Proposed Formations:CLINTON, Issued Date:11/10/2008, Expired Date:11/10/2009 6:00:00 AM, Drilling unit acres:35, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-04-10 | |
Construction Permit Expires | 2009-11-10 | |
Completion Report Received | 2010-07-06 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-09-02 | 2576 | 2608 | 62 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1000 Bbl | 4000 | 23 BPM |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | MARAM ENERGY INC | 89 | 0 | 90 |
2010 | MARAM ENERGY INC | 2063 | 0 | 365 |
2011 | MARAM ENERGY INC | 1979 | 0 | 365 |
2012 | MARAM ENERGY INC | 1083 | 0 | 366 |
2013 | MARAM ENERGY INC | 1050 | 0 | 365 |
2014 | MARAM ENERGY INC | 908 | 0 | 365 |
2015 | MARAM ENERGY INC | 530 | 0 | 365 |
2016 | MARAM ENERGY INC | 435 | 0 | 365 |
2017 | MARAM ENERGY INC | 354 | 0 | 365 |
2018 | MARAM ENERGY INC | 243 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | MARAM ENERGY INC | Brine | 0 | 90 |
2010 | MARAM ENERGY INC | Brine | 80 | 365 |
2011 | MARAM ENERGY INC | Brine | 0 | 365 |
2012 | MARAM ENERGY INC | Brine | 0 | 366 |
2013 | MARAM ENERGY INC | Brine | 45 | 365 |
2014 | MARAM ENERGY INC | Brine | 0 | 365 |
2015 | MARAM ENERGY INC | Brine | 0 | 365 |
2016 | MARAM ENERGY INC | Brine | 0 | 365 |
2017 | MARAM ENERGY INC | Brine | 0 | 365 |
2018 | MARAM ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0211488753 | 2009-02-17 | Drill / Deepen / Reopen | No Violations | I witnessed this power mud job on the surface string today. |
1323711042 | 2011-12-12 | Preliminary Restoration | No Violations | Well location inspected for compliance for perlimintary restoration,well is in production,with active pumping unit. Tank battery consistis of one 30 barrel tank,drip and filter system for gas delivery.Good ID posted at tank , pits are filled, ground cover is present to prevent substanial erosion. Perliminary restoration passed. |
1335886151 | 2010-04-30 | Preliminary Restoration | No Violations | The inspection revealed that there is an open pit on location. There is still a significant amount of grading that need to be done to close up the location. Preliminary Restoration not passed. |
1963665353 | 2009-02-13 | Drill / Deepen / Reopen | No Violations | I inspected the well location with Jeff Fry. George Campfires cable tool rig is on location and he has begun drilling this well. There were no violations noted this date. |
2102364571 | 2011-12-12 | Preliminary Restoration | No Violations | New well, pumping unit in production,lease road in good condition,diesel fuel tank on site near pump jack,pits filled,rough grading done, |
For data sources see[9]