If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24455 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.351248698,"lon":-82.41396823,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pleasant Township | |
Operator Name: MARAM ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: LAHMON | |
License Status: Producing | |
License Date: 2009-09-09 | |
Spud Date: 2009-10-27 | |
Spud Drilling Contractor: CAMPHIRE DRILLING | |
Final Drill Date: 2010-01-28 | |
Well Total Depth: 2619 ft | |
Configuration: Vertical | |
Latitude: 40.351248698 | |
Longitude: -82.41396823 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-09-09 | Proposed Formations:CLINTON, Issued Date:9/9/2009, Expired Date:9/9/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-01-28 | |
Completion Report Received | 2010-07-06 | |
Construction Permit Expires | 2010-09-09 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-09-02 | 2556 | 2574 | 38 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1000 Bbl | 4000 | 23 BPM |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | MARAM ENERGY INC | 1341 | 0 | 180 |
2011 | MARAM ENERGY INC | 2759 | 0 | 365 |
2012 | MARAM ENERGY INC | 1863 | 0 | 366 |
2013 | MARAM ENERGY INC | 1694 | 0 | 365 |
2014 | MARAM ENERGY INC | 1560 | 0 | 365 |
2015 | MARAM ENERGY INC | 1120 | 0 | 365 |
2016 | MARAM ENERGY INC | 1067 | 0 | 365 |
2017 | MARAM ENERGY INC | 954 | 0 | 365 |
2018 | MARAM ENERGY INC | 766 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | MARAM ENERGY INC | Brine | 145 | 180 |
2011 | MARAM ENERGY INC | Brine | 45 | 365 |
2012 | MARAM ENERGY INC | Brine | 0 | 366 |
2013 | MARAM ENERGY INC | Brine | 0 | 365 |
2014 | MARAM ENERGY INC | Brine | 0 | 365 |
2015 | MARAM ENERGY INC | Brine | 0 | 365 |
2016 | MARAM ENERGY INC | Brine | 0 | 365 |
2017 | MARAM ENERGY INC | Brine | 0 | 365 |
2018 | MARAM ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0284818566 | 2010-04-30 | Preliminary Restoration | No Violations | I inspected the location to follow up on a NOV from inspection date 4-14-10. There is still drilling equipment on location. There is still an open pit holding fluids. There still has not been any grading or closing of location. NOV not passed. |
1271252727 | 2010-04-14 | Preliminary Restoration | Violations Noted | The inspection revealed that George Camphires rig is still on location. There is an open 4 inch longstring in the hole. The pit is open and contains fluid. The location has not been graded and seeded. This wells spud date was 10-27-09, which makes Maram Energy in violation of the 5 month pit closure and the removal of all drilling equipment. By April 26, 2010 the well owner will properly close this pit. All drilling equipment shall be removed from the location. The location will be properly graded, seeded, and mulched to prevent erosion. |
1375027278 | 2013-03-27 | Preliminary Restoration | Violations Noted | I inspected this well today the well is producing the area is reclaimed pits are closed CA is resolved. |
1828164759 | 2010-04-14 | Preliminary Restoration | Violations Noted | FOLLOW UP TO NOV # 1271252727 The inspection revealed that George Camphires rig is still on location. There is an open 4 inch longstring in the hole. The pit is open and contains fluid. The location has not been graded and seeded. This wells spud date was 10-27-09, which makes Maram Energy in violation of the 5 month pit closure and the removal of all drilling equipment. By April 26, 2010 the well owner will properly close this pit. All drilling equipment shall be removed from the location. The location will be properly graded, seeded, and mulched to prevent erosion. |
1954258805 | 2009-11-03 | Drill / Deepen / Reopen | No Violations | I witnessed this surface job today. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1271252727 | US-OH-107552 | 2010-04-14 | Failure to fill pits within 5 mos. (CHANGE) (REPLACE) | |
1271252727 | US-OH-107553 | 2010-04-14 | Failure to remove drilling equip. within 5 mos. | |
1375027278 | US-OH-111122 | 2014-01-27 | Failure to close drilling pits within two months | |
1828164759 | US-OH-118252 | 2014-04-23 | Failure to close drilling pits within two months |
For data sources see[9]