If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24486 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.347545697,"lon":-82.41756045,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pleasant Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: SMITH | |
License Status: Producing | |
License Date: 2010-05-27 | |
Spud Date: 2010-06-08 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2010-06-15 | |
Well Total Depth: 4715 ft | |
Configuration: Vertical | |
Latitude: 40.347545697 | |
Longitude: -82.41756045 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-05-27 | Proposed Formations:BEREA THRU TREMPEALEAU, Issued Date:5/27/2010, Expired Date:5/27/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2010-06-15 | |
Completion Report Received | 2010-10-12 | |
Construction Permit Expires | 2011-05-27 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-12-10 | 2558 | 2576 | 38 |
2010-12-10 | 4554 | 4610 | 28 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 3000 Gal | 0 | STAGE 1 OF 2 | ||
H2O | 0 | 31951 Gal | 23300 | STAGE 2 OF 2…PLUG SET @ 2630' |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2010 | BI JOE DEVELOPMENT INC | 1861 | 0 | 122 |
2011 | BI JOE DEVELOPMENT INC | 5882 | 0 | 365 |
2012 | BI JOE DEVELOPMENT INC | 3312 | 0 | 366 |
2013 | BI JOE DEVELOPMENT INC | 2872 | 0 | 365 |
2014 | BI JOE DEVELOPMENT INC | 2753 | 16 | 365 |
2015 | BI JOE DEVELOPMENT INC | 1866 | 0 | 365 |
2016 | BI JOE DEVELOPMENT INC | 1244 | 0 | 365 |
2017 | BI JOE DEVELOPMENT INC | 986 | 0 | 365 |
2018 | BI JOE DEVELOPMENT INC | 927 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | BI JOE DEVELOPMENT INC | Brine | 225 | 122 |
2011 | BI JOE DEVELOPMENT INC | Brine | 50 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 0 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 30 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0096694742 | 2010-06-10 | Drill / Deepen / Reopen | No Violations | I witnessed drilling procedures today. There were no violations noted this date. |
0350593633 | 2010-06-09 | Drill / Deepen / Reopen | No Violations | I witnessed this surface cement job today. |
0530702701 | 2010-06-11 | Drill / Deepen / Reopen | No Violations | I witnessed drilling procedures today. There were no violations noted this date. |
1085831994 | 2010-06-16 | Drill / Deepen / Reopen | No Violations | I witnessed this longstring cement job today. |
1278678059 | 2010-06-15 | Drill / Deepen / Reopen | No Violations | I witnessed drilling operations today. G&H Drilling are drilling in to TD on fluid. There were no violations noted this date. |
1313071469 | 2011-08-08 | Preliminary Restoration | No Violations | There is an active pumping unit on the well. There is one 100 barrel tank and separator contained within an earthen dike. The lease road and well location have been properly graded and the farmer is growing beans successfully at site. There is proper identification displayed. No violations noted this date. Preliminary Restoration passed. |
1958765137 | 2010-06-14 | Drill / Deepen / Reopen | No Violations | I witnessed drilling procedures today. A straight hole test was conducted and the rig will be switching over from drilling on air to drilling on fluid at 4,280 feet. There were no violations noted this date. |
For data sources see[9]