If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21097 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.258322288,"lon":-81.21463229,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Nottingham Township | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: US-OH-000449 | |
Farm/Lease Name: BOY SCOUT | |
License Status: Producing | |
License Date: 2012-09-21 | |
Spud Date: 2012-09-28 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2012-10-23 | |
Well Total Depth: 13631 ft | |
Configuration: Horizontal | |
Latitude: 40.258322288 | |
Longitude: -81.21463229 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-21 | Proposed Formations:POINT PLEASANT, Issued Date:9/21/2012, Expired Date:9/21/2014 12:00:00 PM, Drilling unit acres:1164, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-10-23 | |
Correction to Well | 2013-04-05 | CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 1163.983 ACRES. |
Completion Report Received | 2013-05-21 | |
Construction Permit Expires | 2014-09-21 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/06/2012 | 11/22/2012 | 7860 | 6,748,510.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BioClear 5000 | Weatherford | Biocide | 2,2-dibromo-3-nitril oprop ionam ide | 10222-01-2 | 5 | 0.00118 | 0 |
Water | 7732-18-5 | 95 | 0.0271445 | 0 | ||||
IC-250 | Stingray | Corossion Inhibitor | Proprietary plycarboxylic acid mixture | NA | 20 | 0.00095 | 0 | |
Water | 7732-18-5 | 80 | 0.00378 | 0 | ||||
Entegrate SC8060 WB | U.S. Water | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 20 | 0.00124 | 0 | |
Phosphoric Acid | 7664-38-2 | 1 | 0.00006000 | 0 | ||||
Water | 7732-18-5 | 59 | 0.00366 | 0 | ||||
Aminotrimethylene Phosphonic Acid | 6419-19-8 | 10 | 0.00062 | 0 | ||||
2-propenoic acid, sodium salt, polymer | 37350-42-8 | 10 | 0.00062 | 0 | ||||
X-Linker | Stingray | Guar Gel | Water | 7732-18-5 | 70 | 0.02221 | 0 | |
Ethylene Glycol | NA | 30 | 0.00952 | 0 | ||||
30/50 White | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 15.1838 | 0 | |
Clean Gel | Stingray | Guar Gel | Solvent naphtha, (petroleum) | 64742-96-7 | 65 | 0.09908 | 0 | |
heavy aliphatic | NA | 35 | 0.05335 | 0 | ||||
Citric Acid 50% | Pace International | Acid | water | 7732-18-5 | 50 | 0.29412 | 0 | |
citric acid | 77-92-9 | 50 | 0.29412 | 0 | ||||
Entegrate FR 7170 | U.S. Water | Friction Reducer | Water | 7732-18-5 | 48 | 0.01857 | 0 | |
Alcohols (C10-16), ethoxylated | 68002-97-1 | 3.1 | 0.0012 | 0 | ||||
C12-C14 Alcohol ethoxylated | 68439-50-9 | 3.1 | 0.0012 | 0 | ||||
Petroleum distillate hydrotreated light | 64742-47-8 | 28 | 0.01083 | 0 | ||||
Ammonium chloride | 12125-02-9 | 15 | 0.0058 | 0 | ||||
Alcohols (C12-16), ethoxylated | 68551-12-2 | 3.1 | 0.0012 | 0 | ||||
100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 1.5151 | 0 | |
PROCLEAN 200 | U.S. Water | Corossion Inhibitor | Water | 7732-18-5 | 48 | 0.00045 | 0 | |
Citric Acid, Food Grade | 77-92-9 | 52 | 0.00049 | 0 | ||||
40/70 White | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0 | 0 | |
Per Break | Stingray | Breaker | Ammonium Persulfate | 7727-54-0 | 99 | 0.01343 | 0 | |
Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 82.3893 | 0 | |
Entecide QG40 | U.S. Water | Breaker | n-ALKYL DIMETHYL BENZYL AMMONIUM CHLORIDE | 68424-85-1 | 5.5 | 0.00074 | 0 | |
ETHANOL | 64-17-5 | 2.8 | 0.00038 | 0 | ||||
GLUTARALDEHYDE | 111-30-8 | 27 | 0.00364 | 0 | ||||
DIDECYL DIMETHYL AMMONIUM CHLORIDE | 7173-51-5 | 8.3 | 0.00112 | 0 | ||||
Water | 7732-18-5 | 56.4 | 0.00761 | 0 | ||||
Entegrate NE 1100 | U.S. Water | Demulsifier | Water | 7732-18-5 | 60 | 0.02298 | 0 | |
Ethylene/Propylene Oxide Polymer | NA | 40 | 0.01532 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-19 | H2O | 15 | 323652 Gal | 537560 | STAGE 14
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-16 | H2O | 15 | 312900 Gal | 545770 | STAGE 8
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-17 | H2O | 15 | 261954 Gal | 454500 | STAGE 12
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-19 | H2O | 15 | 321468 Gal | 543830 | STAGE 13
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-21 | H2O | 15 | 7244 Gal | 548240 | STAGE 21
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-16 | H2O | 15 | 321678 Gal | 539850 | STAGE 7
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2013-11-15 | H2O | 15 | 290808 Gal | 558000 | STAGE 3
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-21 | H2O | 15 | 299922 Gal | 534480 | STAGE 17
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-21 | H2O | 15 | 365400 Gal | 534590 | STAGE 18
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2013-11-16 | H2O | 15 | 307860 Gal | 550390 | STAGE 5
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-19 | H2O | 15 | 296142 Gal | 530840 | STAGE 15
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-14 | H2O | 15 | 320208 Gal | 482800 | STAGE 1
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-21 | H2O | 15 | 322098 Gal | 543880 | STAGE 20
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2013-11-17 | H2O | 15 | 341964 Gal | 562050 | STAGE 9
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-17 | H2O | 15 | 299796 Gal | 544480 | STAGE 11
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-22 | H2O | 15 | 268002 Gal | 518040 | STAGE 22
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-20 | H2O | 15 | 195090 Gal | 134140 | STAGE 16
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2013-11-15 | H2O | 15 | 308858 Gal | 550000 | STAGE 4
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-15 | H2O | 15 | 332136 Gal | 546100 | STAGE 2
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-21 | H2O | 15 | 305130 Gal | 555870 | STAGE 19
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2012-11-16 | H2O | 15 | 304836 Gal | 550060 | STAGE 6
STINGRAY PRESSURE PUMPING LLC 36 SHOTS | |
2013-11-17 | H2O | 15 | 335790 Gal | 551860 | STAGE 10
STINGRAY PRESSURE PUMPING LLC 36 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | GULFPORT ENERGY CORPORATION | 262181 | 43081 | 281 |
2014 | GULFPORT ENERGY CORPORATION | 125167 | 20125 | 342 |
2015 | GULFPORT ENERGY CORPORATION | 122555 | 17922 | 346 |
2016 | GULFPORT ENERGY CORPORATION | 129249 | 10149 | 327 |
2017 | GULFPORT ENERGY CORPORATION | 89995 | 7830 | 357 |
2018 | GULFPORT ENERGY CORPORATION | 66610 | 7016 | 360 |
2019 | GULFPORT ENERGY CORPORATION | 14243 | 1465 | 88 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | GULFPORT ENERGY CORPORATION | Brine | 24222 | 281 |
2014 | GULFPORT ENERGY CORPORATION | Brine | 12173 | 342 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 4342 | 346 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 3049 | 327 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 2008 | 357 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 1666 | 360 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 338 | 88 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0194103776 | 2016-03-07 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells on site are producing off of natural reservoir pressure. Permitted wells 34067211040000 and 34067211050000 have not been drilled. RBDMS indicated that the wells on site are in producing order.
The production equipment on the pad consists of the following: 14 400 bbl. Production tanks 4 Producing wells 4 Sand separators 4 Line heaters 1 compressor 1 Vapor recovery tower 1 combustor 1 30bbl. drip tank The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1086620611 | 2018-12-13 | Production Wells | No Violations | On the day of my inspection I was accompanied by Deputy Chief Bob Worstall and Inspector John Fleming. This pad contains four properly labeled producing wellheads. Production equipment includes five 400 barrel steel tanks in their own polymer lined steel containment, four GPUs, four sand seperators, four vertical seperators, and a vapor recovery unit. Surface annular pressure is 0 and intermediate annular pressure is 0. Production records are current in RBDMS. |
1349145170 | 2012-10-01 | Drill / Deepen / Reopen | No Violations | UDI # 121 is running 18 5/8 inch casing to 606 ft. While going to bottom with the casing the rig had problems with fill up. They were able to get casing on bottom but while circulating bottoms up, the hole began to cave. About 15 ft of hole was lost. After trying to work casing and get back on bottom. It was determined that it would be better to cement it where it was rather than loose more hole. Nabors Well Service cemented the casing. See cement ticket for more cement info. |
1358280030 | 2013-01-15 | Production Wells | Violations Noted | I received a call from Gulfport Energy field agent to inform me of an oil spill at the Boy Scout production pad. I was informed that there was believed to be 14 to 20 barrels of oil on the ground near the production tanks. I next contacted the Uniontown Office and advised that I would be responding to the above spill. I contacted Inspector Grimm to assist me with the clean up of the spill and any problems which may occur. When I arrived I found that there was a spill but much smaller than advised. I found 2 to 3 barrels of oil next to the loading lines at the base of the dike surrounding the production tanks. There are 14 four hundred barrel tanks inside a dike which is 65 ft x 150 ft x 5 ft high. Peatsorb has been used to cover the loose or free oil in combination with oil booms to make a containment area. The size of the contained oil is a 20 ft x 20 ft x 2 inches thick area.Vacuum trucks are on site to vacuum up the contaminated combination of peatsorb and oil. I also advised that a roll off container be used to hold the rock and crushed limestone which will need to be removed to an approved landfill. |
1358361675 | 2013-01-16 | Production Wells | No Violations | I am returning to this site to check on the clean up of the oil spill which occurred Tueday 01/15/2013. The spill was contained to a 20 ft x 20 ft x 2 inch thick area in front of the dike where the load lines are located. The oil along with the peatsorb used to contain the oil has been vacuumed up an removed. The contaminated rock and crushed limestone has also been cleaned up and removed to an approved landfill. If you were to arrive today you would not know that a spill had occurred. Very nice clean up. No further inspection is required, this violation has been corrected. |
1380552021 | 2013-09-30 | Preliminary Restoration | No Violations | On the day of my inspection the well was in production and the site passed preliminary restoration according to 1509.072A. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1358280030 | US-OH-110392 | 2013-01-15 | Well operation causing pollution and contamination |
For data sources see[9]