If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-29766 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.402842296,"lon":-81.47691325,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Marietta Township | |
Operator Name: DEEPROCK DISPOSAL SOLUTIONS LL | |
Well Pad ID: | |
Farm/Lease Name: AMERICAN GROWERS (SWIW #26) | |
License Status: Active Injection | |
License Date: 2018-12-07 | |
Spud Date: 2018-06-12 | |
Spud Drilling Contractor: MITCHELL DRILLING | |
Final Drill Date: 2018-07-22 | |
Well Total Depth: 6251 ft | |
Configuration: Vertical | |
Latitude: 39.402842296 | |
Longitude: -81.47691325 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-06-04 | Proposed Formations:MEDINA SANDSTONE, Issued Date:6/4/2018, Expired Date:6/3/2020 12:00:00 PM, Drilling unit acres:32, Proposed Well Type:BR, Proposed Well Class: |
Reached Total Depth | 2018-07-22 | |
Completion Report Received | 2018-08-09 | |
APP | 2018-12-07 | Proposed Formations:OHIO SHALE/MARCELLUS/ORISKANY/BASS ISLANDS/MEDINA SANDSTONE (OHIO SHALE-MEDINA), Issued Date:12/7/2018, Expired Date:12/6/2020 12:00:00 PM, Drilling unit acres:32, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Last Compliance Report | 2019-04-25 | |
Record Last Modified | 2019-04-25 | |
Construction Permit Expires | 2020-12-06 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0090469829 | 2018-06-12 | Salt Water Injection Well | No Violations | Inspection today indicated that Express Energy was moving conductor rig on site and should be setting and cementing the same tomorrow. |
0585697874 | 2018-07-23 | Casing String Witnessed | No Violations | On site to witness Baker Hughes log well ad then rig crew rigged up OS power tons and casing crew to start running 7 casing into well.
Total Depth 6251 Loggers total depth 6195 7 casing ran to 6187 and C&J cemented it in place with 650 sacks of cement. 21 centralizers ran and 3 baskets and 1 shoe and 1 float insert |
0637425658 | 2019-03-07 | Salt Water Injection Well | No Violations | On site to witness pressure testing of flowline, today we did not perform test due to fact that flanges on line were not rated for maximum pressure required they will have to change out flanges to a higher pressure rating and they plan on testing line next week. |
0857428646 | 2019-01-18 | Completion Testing | No Violations | Service rig retrieving bridge plug today hope to start packer and tubing in well on1/22/19. |
0903551602 | 2018-06-22 | Drill / Deepen / Reopen | No Violations | Inspection today indicated that welders were still fabricating lines to closed loop system ,driller hopes to be drilling later today.
Note: Northwest side of location has a small slip area developing made well owner aware of it and we will monitor area for any future slippage. |
1190143547 | 2019-02-13 | Salt Water Injection Well | No Violations | Inspection revealed that equipment has been moved in in preparation to start constructing flowline to wellhead. |
1206900657 | 2018-06-18 | Drill / Deepen / Reopen | No Violations | Inspection today revealed that Mitchell Drilling was still rigging up equipment and they hope to be drilling by the end of the week. |
1529362775 | 2018-06-15 | Drill / Deepen / Reopen | No Violations | Inspection today revealed that Mitchell Drilling was moving in on site. |
1530043219 | 2018-06-24 | Casing String Witnessed | No Violations | Mitchell Drilling ran 361 of 13.3/8 casing and hole depth was 400 of 17 1/2 hole and Cemenco cemented pipe in place with 315 sacks of Class A cement and they had 18 bbl of good cement returns and it stayed up good. |
1530458477 | 2018-06-28 | Drill / Deepen / Reopen | No Violations | Inspection today revealed that Mitchell Drilling was at a depth of 936 and they took a deviation survey at 907 which was 1/4* out next survey will be at 1250 according to driller. |
1530823890 | 2018-07-05 | Drill / Deepen / Reopen | No Violations | Drilling Ohio shale section(dusting) 30 minute Kellys. |
1531433608 | 2018-07-09 | Drill / Deepen / Reopen | No Violations | Drilling 8 3/4 hole on fluid at 4741. |
1531513503 | 2018-07-10 | Drill / Deepen / Reopen | No Violations | Drilling at 4917 drilling on fluid. |
1531680164 | 2018-07-12 | Drill / Deepen / Reopen | No Violations | Drilling on fluid at 5400. |
1536703463 | 2018-09-10 | Drill / Deepen / Reopen | No Violations | On site today to witness bond logging of well it was determined that cement top on annulus of casing was verified at 1970 which is tied in to the preceding casing string. |
1547760071 | 2019-01-16 | Completion Testing | No Violations | Producers Services rigging up frack iron preparing for job tomorrow, Canary wellhead group on site to replace frack valve on stack. |
1548443569 | 2019-01-22 | Salt Water Injection Well | No Violations | On site today to witness tubing/packer/centralizers run in well and packer set and witness testing of said well.
Packer at 4184 tested@1070 psi |
1552600312 | 2019-03-14 | Salt Water Injection Well | No Violations | On site today to witness pressure testing of new fiber spar flowline and new manifold plumbing from pumphouse Full Circle pressure recorded testing@11150 psi and we monitored it for one hour with no pressure loss, took photo of chart and forwarded it to supervisor. |
1556306958 | 2019-04-23 | Salt Water Injection Well | No Violations | On site today to witness start up of injection operations of well ,owner recently received approval for injections operations to begin
Note: well had 670 psi of pressure prior to start up and pressure reached 900 psi then began pressure decrease and during pumping operations it fell to 700 and was still falling during testing period. |
1638788934 | 2019-03-04 | Salt Water Injection Well | No Violations | Inspection revealed that contractor was working on flowline to wellhead and they plan on pressure testing it later this week according to company rep. |
1907519052 | 2019-01-17 | Completion Testing | No Violations | Producers Services on site to perform water frack on said well in the shale portion of wellbore, prior to frac they spotted 2000 gallon of 28% HCL type acid and then they began water frac reaching 41 bpm and they treated well with 3500 bbl. of water . |
1985641569 | 2018-08-21 | Preliminary Restoration | No Violations | Still getting pad cleaned up preparing for service rig once convert permit is issued. |
2029905205 | 2019-01-11 | Completion Testing | No Violations | Knox Energy service rig on site running in hole to set mechanical bridge plug in preparation for upcoming acid treatment of Ohio Shale section of wellbore. |
For data sources see[3]