If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24877 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.641592842,"lon":-80.92740128,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Lee Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000803 | |
Farm/Lease Name: RICHARD STALDER F-M | |
License Status: Drilling | |
License Date: 2019-03-18 | |
Spud Date: 2019-03-30 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Horizontal | |
Latitude: 39.641592842 | |
Longitude: -80.92740128 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2019-03-18 | Proposed Formations:MARCELLUS, Issued Date:3/18/2019, Expired Date:3/17/2021 12:00:00 PM, Drilling unit acres:524.509, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-04-06 | |
Construction Permit Expires | 2021-03-17 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0469924202 | 2019-03-31 | Casing String Witnessed | No Violations | Spud date 3/30/19 and precision Drilling was conductor hole contractor they have two drilling machines on site and they drilled a 30 hole to120and ran 120 of 24 casing and Petroset cemented it in place with 295 sacks of Class A cement hole circulated good and cement stayed up good in cellar there is approximately 12 cement in bottom of cellar for a good seal around pipe. |
For data sources see[3]