X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-23726

Well Details

Well ID: 34-121-23726
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Brookfield Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: OHIO POWER CO
License Status: Producing
License Date: 1989-12-05
Spud Date: 1989-11-30
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1989-12-07
Well Total Depth: 5400 ft
Configuration: Vertical
Latitude: 39.768264074
Longitude: -81.65775321

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1989-12-01
CO 1989-12-05 84 EVERFLOW EASTERN PTNS L P GeoDate 12/5/89
Oil and Gas 1989-12-05 Issued Date 12/5/89 Expired Date 12/5/90 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05400 Proposed Drill Depth 05400
Completed 1989-12-07
Reached Total Depth 1989-12-07
Completion Report Received 1990-02-02
Construction Permit Expires 1990-12-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5296 5298 2
2006-09-11 5184 5202 12
1997-06-29 5145 5230 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 100000 Gal 60000 FRAC:WATER/SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 EVERFLOW EASTERN PTNS L P 5828 56 69
1991 EVERFLOW EASTERN PTNS L P 0 0 365
1992 EVERFLOW EASTERN PTNS L P 9524 59 365
1993 EVERFLOW EASTERN PTNS L P 52 0 65
1994 EVERFLOW EASTERN PTNS L P 8868 0 365
1995 EVERFLOW EASTERN PTNS L P 5399 0 365
1996 EVERFLOW EASTERN PTNS L P 3363 0 365
1997 EVERFLOW EASTERN PTNS L P 3118 0 365
1999 EVERFLOW EASTERN PTNS L P 2228 0 365
2000 EVERFLOW EASTERN PTNS L P 2475 0 365
2001 EVERFLOW EASTERN PTNS L P 1300 0 365
2002 EVERFLOW EASTERN PTNS L P 1022 0 365
2003 EVERFLOW EASTERN PTNS L P 1074 0 365
2004 EVERFLOW EASTERN PTNS L P 623 0 365
2005 EVERFLOW EASTERN PTNS L P 2388 0 365
2006 EVERFLOW EASTERN PTNS L P 2142 0 365
2007 EVERFLOW EASTERN PTNS L P 1403 0 365
2008 EVERFLOW EASTERN PTNS L P 1891 0 365
2009 EVERFLOW EASTERN PTNS L P 1907 0 365
2010 EVERFLOW EASTERN PTNS L P 1739 0 365
2011 EVERFLOW EASTERN PTNS L P 1228 58 365
2012 EVERFLOW EASTERN PTNS L P 1529 0 366
2013 EVERFLOW EASTERN PTNS L P 978 0 305
2014 EVERFLOW EASTERN PTNS L P 69 0 35
2015 EVERFLOW EASTERN PTNS L P 1023 0 365
2016 EVERFLOW EASTERN PTNS L P 151 0 365
2017 EVERFLOW EASTERN PTNS L P 1162 0 365
2018 EVERFLOW EASTERN PTNS L P 308 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 EVERFLOW EASTERN PTNS L P Brine 75 69
1991 EVERFLOW EASTERN PTNS L P Brine 0 365
1992 EVERFLOW EASTERN PTNS L P Brine 0 365
1993 EVERFLOW EASTERN PTNS L P Brine 11622 65
1994 EVERFLOW EASTERN PTNS L P Brine 0 365
1995 EVERFLOW EASTERN PTNS L P Brine 90 365
1996 EVERFLOW EASTERN PTNS L P Brine 0 365
1997 EVERFLOW EASTERN PTNS L P Brine 0 365
1999 EVERFLOW EASTERN PTNS L P Brine 0 365
2000 EVERFLOW EASTERN PTNS L P Brine 0 365
2001 EVERFLOW EASTERN PTNS L P Brine 0 365
2002 EVERFLOW EASTERN PTNS L P Brine 0 365
2003 EVERFLOW EASTERN PTNS L P Brine 0 365
2004 EVERFLOW EASTERN PTNS L P Brine 0 365
2005 EVERFLOW EASTERN PTNS L P Brine 0 365
2006 EVERFLOW EASTERN PTNS L P Brine 0 365
2007 EVERFLOW EASTERN PTNS L P Brine 0 365
2008 EVERFLOW EASTERN PTNS L P Brine 0 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 0 365
2011 EVERFLOW EASTERN PTNS L P Brine 0 365
2012 EVERFLOW EASTERN PTNS L P Brine 0 366
2013 EVERFLOW EASTERN PTNS L P Brine 0 305
2014 EVERFLOW EASTERN PTNS L P Brine 0 35
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 20 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL7262 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0006076936 2002-08-19 Production Wells No Violations
0512087505 2012-02-23 Production Wells No Violations Inspection revealed that well is equipped with 8 surface casing and 4.5 production casing and 1.5 tubing rabbit well) and 1-100 bbl tank with dike in place.
0925641390 2015-10-27 Production Wells No Violations Upon inspection, it was observed that this well is equipped for production. The well consists of 8.625 surface casing, 4.5 production casing and 1.5production tubing with a plunger lift system. The well is currently shut in, but is capable of production. The tank battery consists of a 1400 gal. plastic production tank, horizontal separator, drip, meter run, and containment dike. Legible and correct ID is posted at the well and on the production tank. The lease road is in good condition and is stabilized with vegetation. All pipelines associated with the well are buried. The status of the well in RBDMS is PR. No violations were observed.
1079966112 2013-10-29 Production Wells No Violations My inspection today finds the well is equipped with 4.5 casing and 1.5 tubing with a rabbit. A 50 bbl fiberglass tank is located in a dike with proper identification.
1128157204 2005-09-27 Production Wells No Violations No violations noted on the day of my inspection.

Well is equipped with 1-100 bbl tank,seprator with dike in place(rabbit well),located in reclaimed mine area.

1316129600 2019-02-28 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with 13.375-inch diameter conductor, 8.625-inch diameter surface casing, 4.5-inch diameter production casing, 1.5-inch diameter tubing equipped with a plunger lift system as means of production. Production equipment consisted of a horizontal separator and 37-barrel plastic production fluid storage tank all enclosed within an earthen dike. At the time of my inspection all valves were in the closed position, identification was present, and production was reported for 2017.
2115703527 2009-03-10 Production Wells No Violations Inspection revealed that well is in operation,equipped with 12 conductor pipe and 8 surface casing and 4.5 production casing and 1.5 tubing rabbit well) and 1-100 bbl tank&separator, will need dike work preformed when SPCC rules go into effect.

For data sources see[9]

References