If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24487 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.913529611,"lon":-81.31447799,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000626 | |
Farm/Lease Name: GRISSOM UNIT | |
License Status: Producing | |
License Date: 2014-05-23 | |
Spud Date: 2014-05-17 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-08-14 | |
Well Total Depth: 15246 ft | |
Configuration: Horizontal | |
Latitude: 39.913529611 | |
Longitude: -81.31447799 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-03 | Proposed Formations:POINT PLEASANT, Issued Date:4/3/2014, Expired Date:4/2/2016 12:00:00 PM, Drilling unit acres:549.201, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2014-05-23 | Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:487.822, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-08-14 | |
Correction to Well | 2015-01-30 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-04-20 | |
Construction Permit Expires | 2016-05-22 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-04-20 | 7922 | 15121 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/19/2014 | 12/04/2014 | 7899 | 10,324,800.0 | 485725 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00172 | 1653 |
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.6514 | 86,109,000.0 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 10 | 0.00179 | 1715.87 | |
bis (hexamethylene) tramine penta
(methylene phosphonic acid) - phosphate acid |
40623-75-4 | 10 | 0.00152 | 1461.67 | ||||
2-Phosphonobutane 1,2,4 tricarboxylic salt | 37971-36-1 | 10 | 0.00171 | 1639.61 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.00598 | 5744.99 | ||||
hexamethylenediamine tetra (methylene phosphonic acid) | 38820-59-6 | 10 | 0.00165 | 1588.77 | ||||
Acrylic polymer | 52255-49-9 | 5 | 0.00066 | 635.508 | ||||
Di Water | 7732-18-5 | 80 | 0.01059 | 10168.1 | ||||
Copolymer of Maleic and Acrylic acid | 26677-99-6 | 10 | 0.00156 | 1500 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Crystalline Salt | 12125-02-9 | 5 | 0.00349 | 3351.43 | |
Petroleum Distillates | 64742-47-8 | 40 | 0.02247 | 21583.2 | ||||
Water | 7732-18-5 | 40 | 0.02791 | 26811.4 | ||||
Anionic Polyacrylamide | Proprietary | 40 | 0.02791 | 26811.4 | ||||
Ethoxylated alcohol blend | Proprietary | 5 | 0.00349 | 3351.43 | ||||
K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00258 | 2475.31 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00451 | 4333.56 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-1 | 18 | 0.03354 | 32215.8 | |
Water | 7732-18-5 | 87.5 | 0.14042 | 134869 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.96277 | 9,569,110.0 | |
AI-301 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Polyethylene polyamine | 68603-67-8 | 10 | 0.00006000 | 62.148 | |
Coco amine | 61791-14-8 | 5 | 0.00003000 | 28.3894 | ||||
Methenamine | 100-97-0 | 20 | 0.00017 | 164.165 | ||||
Diethylene Glycol | 111-46-6 | 30 | 0.00022 | 207.181 | ||||
Hydrogen Chloride | 7647-01-0 | 10 | 0.00007000 | 71.5906 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.04024 | 38650.8 | |
Surfactant | 68439-51-0 | 3 | 0.00255 | 2448.68 | ||||
Guar Gum | 9000-30-0 | 50 | 0.04249 | 40811.4 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.0065 | 6241.74 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-12-04 | H2O | 15 | 5735 Bbl | 241480 | US Well Services Inc | STAGE 41/41
60 SHOTS |
2014-11-19 | H2O | 15 | 6056 Bbl | 206197 | US Well Services Inc | STAGE 1/41
60 STAGES STAGES 2-40 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 1619229 | 37947 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 812308 | 2712 | 361 |
2017 | ANTERO RESOURCES CORPORATION | 394544 | 913 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 219559 | 471 | 353 |
2019 | ANTERO RESOURCES CORPORATION | 64134 | 124 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 16754 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 7755 | 361 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 3199 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 1175 | 353 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 393 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0233051276 | 2018-03-08 | Production Wells | No Violations | The purpose of my inspection was a status check on a cut slope slip failure. The pad name is Roe and there are a total of 7 wells. The slip occurred in the cut slope of the pad in the Northwest corner where the eight 400 barrel tanks and two vapor recovery towers were located. That equipment had been removed in order for Antero to take remedial action on the slope failure. The remaining production equipment and wellheads were outside the area of concern. ODNR Division of Oil and Gas Engineering Section is currently working with Antero Resources with planning the material modification to repair the slope. |
0390723789 | 2015-02-11 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner. |
0617772956 | 2017-01-20 | Production Wells | No Violations | The purpose of my inspection is a status check on a producing well. The pad name is Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present. |
0787824453 | 2014-05-18 | Casing String Witnessed | No Violations | My inspection today finds Express drilled the well to 101 and ran 100 of 26 casing. Express Energy Services also cemented the casing in place by circulating 330 sks of class A cement. The mix water was sourced from a Caldwell municipal source. Chlorides tested below 250 ppm. I witnessed 19 bbl returns to surface. |
0805751592 | 2018-04-20 | Production Wells | No Violations | During my inspection contractors for Antero Resources were on location running lines to the combustors. The production equipment had been relocated due to a slip near the old orientation of the production equipment on the north side of the pad. |
0889614485 | 2014-07-03 | Casing String Witnessed | No Violations | |
0968443485 | 2018-03-05 | Production Wells | No Violations | |
1130534187 | 2017-05-09 | Production Wells | No Violations | The purpose of my inspection was a status check on a producing well. The pad is named Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 290 pounds per square inch on the casing and 170 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment for this well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, the identification is located at the wellhead, and there are no violations present. |
1400228186 | 2018-07-16 | Production Wells | No Violations | The purpose of my inspection today was to witness Antero re-assembling the Grissom 1H plunger lift system. The well was equipped with a plunger lift system with valves in the open position. A pressure gauge was present on all casing strings. Accompanied by Antero Production Superintendent during my inspection. |
1489129033 | 2018-06-12 | Production Wells | No Violations | Prior inspection found contractors for Antero relocating and reassembling production equipment due to a slip in the cut slope of the North side if the pad. During my inspection today, the tank battery had been moved and reset within steel containment and the vapor recovery system had been connected. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 170 pounds per square inch, 285 pounds per square inch on the production casing, 0 pounds per square inch on the 9.625 inch diameter intermediate casing, and 150 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of four 400 barrel tanks, seven gas production units, and two combustors. The identification was located at the wellhead. |
1569600020 | 2018-03-21 | Production Wells | No Violations | The purpose of my inspection was a status check. The pad is named Roe and there are a total of 7 wells. During my inspection construction equipment was on location to make repairs to the slips located on the cut slope and fill slopes of the pad. Antero is actively working with ODNR Division of Oil and Gas Engineering section to make necessary slip repairs. The slips do not oppose any threat to the wells and the wells are under continuous pressure monitoring. |
1668165193 | 2014-08-14 | Casing String Witnessed | No Violations | I am onsite to monitor the cementing operations on the production casing string. The drilling rig ran 15,246 of 5.5 casing. Allied cemented the casing in place with a 301 sack lead cement slurry of class H and Poz. in equal amounts. The tail cement consisted of 1300 sacks of class H cement. |
1674770703 | 2017-08-15 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 277 pounds per square inch on the casing, 170 pounds per square inch on the tubing, and 160 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead. |
2123473810 | 2015-06-16 | Production Wells | No Violations | The well is equipped in a manner consistent with being capable of production. All drainage sumps on the location are closed. No violations were noted during the inspection. |
For data sources see[10]