If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24530 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.818208076,"lon":-81.32924188,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Marion Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000901 | |
Farm/Lease Name: DAILEY UNIT | |
License Status: Producing | |
License Date: 2014-09-22 | |
Spud Date: 2014-09-22 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-11-27 | |
Well Total Depth: 18609 ft | |
Configuration: Horizontal | |
Latitude: 39.818208076 | |
Longitude: -81.32924188 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-05 | Proposed Formations:POINT PLEASANT, Issued Date:9/5/2014, Expired Date:9/4/2016 12:00:00 PM, Drilling unit acres:317.721, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-09-22 | Proposed Formations:POINT PLEASANT, Issued Date:9/22/2014, Expired Date:9/21/2016 12:00:00 PM, Drilling unit acres:317.721, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-11-27 | |
Correction to Well | 2015-02-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-10-28 | |
Construction Permit Expires | 2016-09-21 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-10-29 | 9021 | 18523 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/18/2015 | 06/30/2015 | 8339 | 14,537,300.0 | 635596 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00169 | 2270 |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.00146 | 12,059,300.0 | |
WFRA-405 | U.S. Well Services | Friction Reducer | Sodium Chloride | 7647-14-5 | 20 | 0.01355 | 18159.5 | |
Ethoxylated alcohol blend | Proprietary | 5 | 0.00339 | 4539.88 | ||||
Petroleum Distillates | 64742-47-8 | 20 | 0.01091 | 14618.4 | ||||
Anionic Polyacrylamide | Proprietary | 40 | 0.02711 | 36319 | ||||
Water | 7732-18-5 | 40 | 0.02711 | 36319 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.00259 | 3465.67 | |
Guar Gum | 9000-30-0 | 50 | 0.04311 | 57761.2 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.00659 | 8834.06 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.04083 | 54703.2 | ||||
SI-1100 | U.S. Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.00576 | 7712.77 | |
2-Phosphonobutane 1,2,4 tricarboxylic salt | 37971-36-1 | 10 | 0.00164 | 2201.21 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 10 | 0.00172 | 2303.59 | ||||
Copolymer of Maleic and Acrylic acid | 26677-99-6 | 10 | 0.0015 | 2013.51 | ||||
Acrylic polymer | 52255-49-9 | 5 | 0.00064 | 853.182 | ||||
hexamethylenediamine tetra (methylene phosphonic acid) | 38820-59-6 | 10 | 0.00159 | 2132.95 | ||||
bis (hexamethylene) tramine penta
(methylene phosphonic acid) - phosphate acid |
40623-75-4 | 10 | 0.00146 | 1962.32 | ||||
Di Water | 7732-18-5 | 80 | 0.01019 | 13650.9 | ||||
AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Polyethylene polyamine | 68603-67-8 | 10 | 0.00005000 | 73.0659 | |
Methenamine | 100-97-0 | 20 | 0.00014 | 193.004 | ||||
Diethylene Glycol | 111-46-6 | 30 | 0.00018 | 243.577 | ||||
Hydrogen Chloride | 7647-01-0 | 10 | 0.00006000 | 84.1673 | ||||
Coco amine | 61791-14-8 | 5 | 0.00002000 | 33.3767 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.05622 | 75315.2 | |
Water | 7732-18-5 | 87.5 | 0.23535 | 315301 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.4983 | 121,241,000.0 | |
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00248 | 3325.32 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00435 | 5821.69 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-30 | H2O | 0 | 5603 Bbl | 236870 | US Well Services Inc | STAGE 54/54
60 SHOTS |
2015-02-18 | H2O | 0 | 6744 Bbl | 118820 | US Well Services Inc | STAGE 1/54
60 SHOTS STAGES 2-53 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 1061734 | 12897 | 184 |
2016 | ANTERO RESOURCES CORPORATION | 2098236 | 6603 | 366 |
2017 | ANTERO RESOURCES CORPORATION | 753597 | 536 | 364 |
2018 | ANTERO RESOURCES CORPORATION | 467579 | 431 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 77445 | 58 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 19535 | 184 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 17187 | 366 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5232 | 364 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 4009 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 952 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0420953103 | 2017-01-18 | Production Wells | No Violations | The purpose of my inspection is a status check on a producing well. The pad name is Warner and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of ten 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present. |
0457611539 | 2014-11-24 | Drill / Deepen / Reopen | No Violations | My inspection finds circulation was lost prior to beginning cementing operations on 11-23-14. Circulation has been reestablished. The company will test the formation for pump rate and fluid weight stability before attempting to cement the casing. |
0607412378 | 2015-05-18 | Completion Testing | No Violations | My inspection today finds the service Fortis service rig is still fishing for the wireline and perforating guns left in the hole. |
0690033138 | 2017-11-20 | Production Wells | No Violations | The purpose of my inspection today was a status check on a production well. The pad was named Warner and it consisted of 7 wells. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of ten 400 barrel tanks, 7 gas production units, one vent scrubber, and 2 combustors. The natural gas pipeline tie in was located on the Northwest side of the pad. The identification was located on the wellhead and production records were current. |
1400811908 | 2017-08-10 | Production Wells | No Violations | The purpose of my inspection today was a status check on a production well. The pad was named Warner and it consisted of 7 wells. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production casing had a gauge present reading 400 pounds per square inch and the production tubing had a gauge present reading 202 pounds per square inch. The production equipment consisted of tin 400 barrel tanks, 7 gas production units, and 2 combustors. The natural gas pipeline tie in was located on the Northwest side of the pad. The identification was located on the wellhead. |
1415193073 | 2014-11-05 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is drilling 8.75 hole at a depth of 10,731. The rig is consistently encountering four to five thousand units of gas while drilling. |
1416402768 | 2014-11-19 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig, Patterson 343, has reached a total measured depth of 18,606. They are currently pulling the drill pipe out of the hole. The rig will then run 18,600 of 5.5 casing into the well. |
1462901038 | 2015-07-30 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements of 1509.072(A). Well Service Group is onsite removing matting boards. The well has not been connected to production pipelines. The lease road has recently been treated with a dust suppression product. |
1549534230 | 2015-05-06 | Completion Testing | No Violations | My inspection today finds Key Well Service is fishing for a lost string of perforating guns. No violations were noted. |
1731536956 | 2015-02-20 | Drill / Deepen / Reopen | No Violations | My inspection today finds the perforating crew has become stuck in the curve. The company will cut the cable and remove the remaining line from the well as soon as the blow out preventer is unthawed. Once the procedure is finished operations will begin on another well on the pad. |
1785540083 | 2018-02-02 | Production Wells | No Violations | Status check following a nearby pipeline mechanical issue that is not owned by Antero. The purpose of my inspection today was a status check on a production well. The pad was named Warner and it consisted of 7 wells. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of ten 400 barrel tanks, 7 gas production units, one vent scrubber, and 2 combustors. The natural gas pipeline tie in was located on the Northwest side of the pad with no issues present. The identification was located on the wellhead and production records were current. |
1881243581 | 2016-06-17 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of twelve 400 barrel tanks set inside of a plastic lined steel containment system. Additionally, there are seven production units (GPUs) also set inside of a plastic lined steel containment system. Three Cimarron combustors and two compressors make up the vapor recovery system. A Meyers Well Service truck is on location hauling brine at the time of inspection. |
2141382752 | 2015-12-07 | Production Wells | No Violations | My inspection today finds the well is back in production. The site is staffed by a Warrior employee 24 hours a day. |
For data sources see[10]