If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26114 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.118705946,"lon":-82.6470559,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: St. Albans Township | |
Operator Name: KNOX ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: OBERT J | |
License Status: Producing | |
License Date: 2012-09-05 | |
Spud Date: 2012-09-11 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2012-09-14 | |
Well Total Depth: 2169 ft | |
Configuration: Vertical | |
Latitude: 40.118705946 | |
Longitude: -82.64705590 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-05 | Proposed Formations:OHIO SHALE THRU CLINTON (MAY NOT PRODUCE BEREA), Issued Date:9/5/2012, Expired Date:9/5/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-09-14 | |
Completion Report Received | 2012-11-13 | |
Construction Permit Expires | 2014-09-05 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-12-12 | 2029 | 2036 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-09-21 | H2O | 15 | 1218 Bbl | 10000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | KNOX ENERGY INC. | 0 | 247 | 4 |
2013 | KNOX ENERGY INC. | 0 | 2778 | 361 |
2014 | KNOX ENERGY INC. | 0 | 1627 | 365 |
2015 | KNOX ENERGY INC. | 0 | 1147 | 365 |
2016 | KNOX ENERGY INC. | 0 | 668 | 365 |
2017 | KNOX ENERGY INC. | 0 | 474 | 365 |
2018 | KNOX ENERGY INC. | 0 | 335 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | KNOX ENERGY INC. | Brine | 196 | 4 |
2013 | KNOX ENERGY INC. | Brine | 152 | 361 |
2014 | KNOX ENERGY INC. | Brine | 28 | 365 |
2015 | KNOX ENERGY INC. | Brine | 14 | 365 |
2016 | KNOX ENERGY INC. | Brine | 5 | 365 |
2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0059885399 | 2013-09-10 | Preliminary Restoration | No Violations | This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. The well was pumping during inspection. The area around the well has been restored. The tank battery consists of (3) 210 barrel tanks and (1) 100 barrel tank inside an earthen dike. Identification posted at the tank battery. Preliminary restoration inspection meets ORC 1509.072 requirements. |
0907749757 | 2012-09-12 | Drill / Deepen / Reopen | No Violations | Today I witnessed the cementing of the surface casing on Kilbarger rig 1 for Knox Energy. Circulation was observed and cement stayed at the surface. No violations. |
1870101897 | 2012-09-12 | Drill / Deepen / Reopen | No Violations | Kilbarger rig 1 drilling during inspection. Depth approximately 365 feet. |
For data sources see[9]